Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EQTY.V ·

Equity Metals Announces Crews and Drill Mobilized to Commence Winter '26 Program on the Silver Queen Ag-Au Property, British Columbia; Arlington Property Drill Results Evaluated

Drill Results

Equity Metals Announces Crews and Drill

Mobilized to Commence Winter '26 Program on

the Silver Queen Ag-Au Property, British

Columbia; Arlington Property Drill Results

Evaluated

Vancouver, British Columbia--(Newsfile Corp. - January 28, 2026) -

Equity Metals Corporation

(TSXV: EQTY) ("Equity" or the "Company")

reports that crews have mobilized in preparation for

drilling on its 100% owned 18,871-hectare

Silver Queen Property

, northern British Columbia.

In this initial drilling program, sixteen-holes totaling 4,200 metres are planned to test parts of the existing

resource model and will include twinning of several historical holes.

Intercepts will be used to continue

validation of the historical drill results, and mineralization from the new holes will be used for additional

metallurgical test work on the No. 3 vein. This phase of the 2026 program is designed to further de-risk

the project in preparation for economic assessment.

In addition to this first phase of the 2026 program, a larger exploration/development program is planned

on the property, which will include:

Relogging and sampling of several historical drill holes from 2017-18;

Re-establishing underground access to the historical workings via the Earl Adit on the No. 3 Vein

for lidar scanning and re-sampling purposes; and

Drilling on newly developed greenfields targets in the broader district generated in part through the

Fall '25 sampling program and earlier compilation.

The No. 3 Vein hosts the single largest resource currently identified on the Silver Queen property and

with its southern extension, the NG-3 Vein, account for 65% of the currently modelled mineral resources

on a AgEq basis. The NI43-101 Mineral Resource Estimate with effective date December 1

st

, 2022 is

detailed in a News Release issued on Jan 16, 2023, which can be found by clicking

here

and the full

Technical Report can be found on SEDAR+ and the Company's website.

Figure 1: Plan of the Silver Queen project area showing proposed drill pads for Winter 2026

testing

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5566/281868_ffd636bc54f76b9a_001full.jpg

Arlington Property Update

The company also reports that final assays from 2025 drilling on the Arlington property have been

received. Nine core holes totalling 3,407 metres were completed and tested three separate "hot-spot"

clusters of strongly anomalous Au-Ag-As values within the South Fresh Pots soil anomaly (Figure 2).

Drilling intersected several, shallowly dipping gold-enriched quartz veins within a granodioritic host rock

Assay highlights include:

A

1.6 metre

interval averaging

3.9g/t Au

,

0.29% Cu, (6.6g/t AuEq),

from AR25-001;

A

7.0 metre

interval averaging

1.2g/t Au

,

0.03% Cu, (1.2g/t AuEq),

from AR25-004; and

A

2.0 metre

interval averaging

3.1g/t Au

,

0.01% Cu, (3.1g/t AuEq),

from AR25-005;

President Joe Kizis commented,

"Drill results at South Fresh Pots indicated gold is closely associated

with copper and a small granodiorite intrusion, potentially the distal part of a copper/gold-related

intrusive system. The mineralization and IP chargeability (see figure and inset) suggest a vector

towards a magnetic high beneath the North Fresh Pots target, which may be the source intrusion with

thicker zones of mineralization surrounding the intrusion."

Figure 2: 3-D rendering of the South Fresh Pots area showing potential vectoring to a

conductivity high located beneath the north Fresh Pots target

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5566/281868_ffd636bc54f76b9a_002full.jpg

Work on the property in 2026 will include a Spring surface mapping and sampling program designed to

upgrade new target areas for drilling, particularly the North Fresh Pots, Rona and Arlington target areas.

Earlier surface work on these targets includes a short Pack sack drill interval in the North Fresh Pots

which returned a 0.7 metre interval of 2.2g/t Au, 11.34g/t Ag and0.35% Cu in magnetite skarn and

surface chip sampling from the Arlington south area by previous management which returned

11.7g/t Au,

211g/t Ag and 3.22% Cu (see BC Assessment Report 41159).

Figure 3: 2026 drill hole distribution on the Arlington property

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5566/281868_ffd636bc54f76b9a_003full.jpg

Table 1: Select Composites from 2025 Drilling on the No. 3 North Target

Table 1: Select Composites from 2025 drilling on the Arlington property, BC

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5566/281868_ffd636bc54f76b9a_004full.jpg

Notes: drill core samples were analyzed by FA/AAS for gold and 48 element ICP-MS by MS Analytical, Langley, BC. Silver (>100ppm), copper, lead

and zinc (>1%) overlimits assayed by ore grade ICP-ES analysis, High silver overlimits (>1000g/t Ag) and gold overlimits (>10g/t Au) re-assayed with

FA-Grav. Silver >10,000g/t re-assayed by concentrate analysis, where a FA-Grav analysis is performed in triplicate and a weighed average

reported. Downhole composites calculated using a 80g/t AgEq (1g/t AuEq) cut-off and <20% internal dilution, except where noted. Accuracy of

results is tested through the systematic inclusion of QA/QC standards, blanks and duplicates into the sample stream. AuEq and AgEq were

calculated using prices of $2,360/oz Au, $28.50/oz Ag, $4.25/lb Cu, $0.90/lb Pb and $1.20/lb Zn. AuEq and AgEq calculations utilized relative

metallurgical recoveries of

Au 70%, Ag 80%, Cu 80%, Pb 81% and Zn 90%.

Note that true thickness cannot be precisely calculated at this time, but is estimated between 70% and 80% of the down hole thickness

About Equity Metals Corporation

Equity Metals Corporation is a member of the Malaspina-Manex Group. The Company owns 100%

interest, with no underlying royalty, in the

Silver Queen project,

located along the Skeena Arch in the

Omineca Mining Division, British Columbia. The property hosts high-grade, precious- and base-metal

veins related to a buried porphyry system, which has been only partially delineated. The Company also

has a controlling JV interest (57.49%) in the

Monument Diamond project

,

NWT

, strategically located

in the Lac De Gras district within 40 km of both the Ekati and Diavik diamond mines. As well, the

Company has an option to acquire a 100% interest in the

Arlington Property

, located within the

Boundary District of south-central British Columbia where 2025 exploration work consisted of

geophysics and diamond drilling designed to identify and delineate an apparent gold system.

Robert Macdonald, MSc. P.Geo, is VP Exploration of Equity Metals Corporation and a Qualified Person

as defined by National Instrument 43-101. He is responsible for the supervision of the exploration on the

Silver Queen project and for the preparation of the technical information in this disclosure. He has

reviewed and approved this news release.

On behalf of the Board of Directors

"Joseph Anthony Kizis, Jr."

Joseph Anthony Kizis, Jr., P.Geo

President, Director, Equity Metals Corporation

For further information, visit the website at

https://www.equitymetalscorporation.com

; or contact us at

604.641.2759 or by email at

[email protected]

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements. Forward-looking

statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from

those currently anticipated in such statements. Factors that could cause actual results to differ materially from those in forward looking statements

include the timing and receipt of government and regulatory approvals, and continued availability of capital and financing and general economic,

market or business conditions.

Equity Metals Corporation does not assume any obligation to update or revise its forward-looking statements,

whether as a result of new information, future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/281868