Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EQTY.V ·

Equity Extends the NG-3 Vein to over 300 Metres Strike-Length; Intersects 3.7m Averaging 4.9g/t Au, 75g/t Ag (6.3g/t AuEq) at Silver Queen Project, BC

Drill Results

Equity Extends the NG-3 Vein to over 300

Metres Strike-Length; Intersects 3.7m

Averaging 4.9g/t Au, 75g/t Ag (6.3g/t AuEq) at

Silver Queen Project, BC

Vancouver, British Columbia--(Newsfile Corp. - April 28, 2022) -

Equity Metals Corporation (TSXV:

EQTY) ("Equity")

reports several intersections of high-grade gold and silver from six holes which tested

the NG-3 target area on the Silver Queen property, BC. Equity's drilling has now confirmed the extension

of the NG-3 Vein to over 300 metres of strike and to depths of up to 240 metres below surface. The

holes have established internal continuity between historic intercepts drilled by previous management

and earlier drilling by Equity, and mineralization remains open along strike and dip.

Drilling Highlights:

a

1.5 metre

interval grading

11.7g/t Au

,

167g/t Ag,

0.4% Cu,

0.1% Pb and 0.2% Zn

(14.5g/t

AuEq or 1,089g/t AgEq)

within

a

3.7 metre

interval averaging

4.9g/t Au,

75g/t Ag,

0.2% Cu,

0.1% Pb and 0.3% Zn

(6.3g/t AuEq or 472g/t AgEq)

from drill hole

SQ22-067;

and

a

0.3 metre

interval grading

14.2g/t Au

, 82g/t Ag,

0.2% Cu,

0.3% Pb and 0.2% Zn

(15.8g/t AuEq

or 1,185g/t AgEq)

within

a

1.2 metre

interval averaging

3.7g/t Au,

31g/t Ag, 0.1% Cu,

0.1% Pb

and 0.1% Zn

(4.3g/t AuEq or 322g/t AgEq)

from drill hole

SQ22-069.

The NG-3 vein is the eastern segment of a 2.5 km-long east-west trending composite structure which

includes the Camp Vein, Sveinson and parts of the No. 3 Vein targets (see Figure 1). Drilling on the

property by Equity Metals over the last 18 months of exploration has confirmed multiple mineralized veins

along the full strike-length of the host structural and tested some portions to depths of up to 400 metres

below surface. Numerous targets within the structure zone remain to be extended laterally and to depth,

which will form the basis of future exploration drilling on the property in 2022.

Drilling on the eastern end of the NG-3 target also intersected 89.3m averaging 0.1% Au, 2.1g/t Ag,

0.2% Cu and 0.04% Mo in drill hole SQ22-071 starting at 389.8 metres down hole. The mineralized

interval is characterized by increased quartz veining, strong sericite-alteration with elevated pyrite

content and correlates with the transition into the previously identified Itsit Porphyry system.

Vice-President of Exploration, Rob Macdonald, commented,

"Drilling continues to return high-grade

gold and silver values at multiple target areas along the main 2.5 km-long mineralized corridor

targeted by Equity over the previous 18 months of drilling on the Silver Queen property. The

confirmation of Cu-Mo-porphyry -styled mineralization at the Itsit target further highlights the presence

of a large and widespread Epithermal/Porphyry mineralizing system. Multiple vein targets remain

untested throughout the property and numerous veins require follow-up drilling to extend

mineralization both laterally and to depth as Equity continues its systematic evaluation of this district-

scale property."

The Winter '22 program consisted of 13 core holes totaling 4,382 metres, including six holes (2,431m) at

the NG-3 target and seven holes (1,931m) on the Camp and Sveinson targets. Assay results are

pending and anticipated in the coming days for the remaining four holes, three which tested the west

side of the Camp target and a single hole which is a step-out from a high-grade intercepts in the

Sveinson target.

Figure 1: Plan Map of targets on the Silver Queen vein system, BC.

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/5566/121884_d1349c69c47e7a36_002full.jpg

Figure 2: Longitudinal Section of the NG-3 Target looking north.

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/5566/121884_d1349c69c47e7a36_003full.jpg

Table 1: Summary Composites from Drilling on the NG-3 Target

Hole #

From

(m)

To

(m)

Interval

(m)

Au

(g/t)

Ag

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

AuEq

(g/t)

AgEq

(g/t)

Comments

NG-3 Target

SQ22-066

216.9

217.4

0.5

3.4

99

0.4

0.2

0.9

5.7

431

SQ22-066

302.6

303.2

0.6

0.6

254

1.6

0.1

3.3

7.7

580

SQ22-066

345.5

347.0

1.5

2.6

0

0.0

0.0

0.0

2.6

196

SQ22-066

422.0

422.3

0.3

1.4

55

0.0

0.1

5.5

4.9

369

SQ22-067

233.3

234.3

1.0

0.2

102

0.6

0.8

2.7

4.1

304

30%

Dilution

inc.

233.3

233.6

0.3

0.4

210

1.4

2.0

4.1

7.9

593

SQ22-067

307.2

310.9

3.7

4.9

75

0.2

0.1

0.3

6.3

472

36.5%

Dilution

inc.

308.9

310.4

1.5

11.7

167

0.4

0.1

0.2

14.5

1089

SQ22-068

113.3

113.9

0.7

1.2

47

0.1

0.1

0.3

2.2

164

SQ22-068

265.5

265.8

0.3

3.6

125

0.2

0.1

0.1

5.5

412

SQ22-069

317.9

319.1

1.2

3.7

31

0.1

0.1

0.1

4.3

322

58%

Dilution

inc.

318.8

319.1

0.3

14.2

82

0.2

0.3

0.2

15.8

1185

SQ22-069

321.7

322.0

0.3

3.8

213

0.1

0.5

0.3

7.1

530

SQ22-070

434.8

435.1

0.4

0.5

40

0.0

0.1

2.1

2.2

161

SQ22-071

57.6

58.7

1.1

0.8

131

1.4

0.1

0.6

4.7

354

inc.

58.4

58.7

0.3

2.0

417

4.3

0.4

1.3

13.8

1036

SQ22-071

392.0

393.5

1.5

0.8

41

0.1

0.2

0.5

1.8

133

Hole #

From

(m)

To

(m)

Interval

(m)

Au

(g/t)

Ag

(g/t)

Cu

(%)

Mo

(%)

Re

(g/t)

CuEq

(%)

AuEq

(g/t)

Comments

NG-3 Target - Porphyry Intercepts

SQ22-071

389.8

479.00

89.3

0.1

2.1

0.2

0.04

0.4

0.6

0.8

0.25% CuEq

Cutoff

Samples were analyzed by FA/AAS for gold and 48 element ICP-MS by MS Analytical, Langley, BC. Silver (>100ppm), copper, lead and zinc (>1%)

overlimits assayed by ore grade ICP-ES analysis, High silver overlimits (>1000g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav.

Silver >10,000g/t re-assayed by concentrate analysis, where a FA-Grav analysis is performed in triplicate and a weighed average reported.

Composites calculated using a 80g/t AgEq (1g/t AuEq) cut-off and <20% internal dilution, except where noted. Reported intervals are core lengths,

true widths undetermined or estimated. Accuracy of results is tested through the systematic inclusion of QA/QC standards, blanks and duplicates

into the sample stream. AuEq and AgEq were calculated using prices of $1,500/oz Au, $20/oz Ag, $2.75/lb Cu, $1.00/lb Pb and $1.10/lb Zn. AuEq

and AgEq calculations did not account for relative metallurgical recoveries of the metals.

About Silver Queen Project

The Silver Queen Project is a premier gold-silver property with over 100 years of historic exploration and

development and is located adjacent to power, roads and rail with significant mining infrastructure that

was developed under previous operators Bradina JV (Bralorne Mines) and Houston Metals Corp. (a

Hunt Brothers company). The property contains an historic decline into the No. 3 Vein, camp

infrastructure, and a maintained Tailings Facility.

The Silver Queen Property consists of 45 mineral claims, 17 crown grants, and two surface crown grants

totalling 18,852ha with no underlying royalties. Mineralization is hosted by a series of epithermal veins

distributed over a 6 sq km area. An initial NI43-101 Mineral Resource Estimate was detailed in a News

Release issued on July 16th, 2019 and is hosted by the No. 3 Vein, which is traced by drilling for

approximately 1.2km and then to the southeast where it transitions into the NG-3 Vein close to the buried

Itsit copper-molybdenum porphyry.

More than 20 different veins have been identified on the property, forming an extensive network of zoned

Cretaceous- to Tertiary-age epithermal veins. The property remains largely under explored.

About Equity Metals Corporation

Equity Metals Corporation is a Manex Resource Group Company. Manex provides exploration,

administration, and corporate development services for Equity Metals' two major mineral properties, the

Silver Queen Au-Ag-Zn-Cu project,

located in central B.C., and the

Monument Diamond project

,

located in Lac De Gras, NWT. The Company also has a 1% royalty (Greenwood Royalty) and a 100%

working interest in the

La Ronge Silica Project

.

The Company owns 100% interest, with no underlying royalty, in the

Silver Queen project,

located

along the Skeena Arch in the Omineca Mining Division, British Columbia. The property hosts high-grade,

precious- and base-metal veins related to a buried porphyry system, which has been only partially

delineated. The Company also has a controlling JV interest in the

Monument Diamond project

,

NWT

,

strategically located in the Lac De Gras district within 40 km of both the Ekati and Diavik diamond

mines. The project owners are Equity Metals Corporation (57.49%), Chris and Jeanne Jennings

(22.11%); and Archon Minerals Ltd. (20.4%). Equity Metals is the operator of the project.

The 100% controlled

La Ronge Silica Project

is an historic sand quarry located in central

Saskatchewan, approximately 60 kilometers south-southeast of La Ronge, Saskatchewan and 210

kilometers west of Flin Flon, Manitoba. Preliminary studies indicate the silica deposit may be developed

into a simple and profitable, low-cost mining and washing operation to produce high-purity silica (>98%

SiO2), a specialty product for the EV battery industry.

Robert Macdonald, MSc. P.Geo, is VP Exploration of Equity Metals Corporation and a Qualified Person

as defined by National Instrument 43-101. He is responsible for the supervision of the exploration on the

Silver Queen project and for the preparation of the technical information in this disclosure.

On behalf of the Board of Directors

"Joseph Anthony Kizis, Jr."

Joseph Anthony Kizis, Jr., P.Geo

President, Director, Equity Metals Corporation

For further information, visit the website at

https://www.equitymetalscorporation.com

; or contact us at

604.641.2759 or by email at

[email protected]

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. This news release may contain forward-looking statements. Forward-looking statements

address future events and conditions and therefore involve inherent risks and uncertainties. Actual

results may differ materially from those currently anticipated in such statements. Factors that could

cause actual results to differ materially from those in forward-looking statements include the timing

and receipt of government and regulatory approvals, and continued availability of capital and

financing and general economic, market or business conditions.

Equity Metals Corporation does not

assume any obligation to update or revise its forward-looking statements, whether as a result of new

information, future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/121884