Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EQTY.V ·

Equity Extends New Mineralization; Including 7.7 metres (est TT) of 0.9g/t Au, 57g/t Ag, 1.4% Pb and 6.5% Zn (11.2g/t AuEq or 445g/t AgEq) at the Sveinson Deposit, Silver Queen Project, BC

Drill Results

Equity Extends New Mineralization; Including

7.7 metres (est TT) of 0.9g/t Au, 57g/t Ag, 1.4%

Pb and 6.5% Zn (11.2g/t AuEq or 445g/t AgEq)

at the Sveinson Deposit, Silver Queen Project,

BC

Vancouver, British Columbia--(Newsfile Corp. - August 9, 2023) -

Equity Metals Corporation (TSXV:

EQTY) (FSE: EGSD) (OTCQB: EQMEF) ("Equity")

reports final assays from its Spring 2023 core

drilling program on the Company's 100% owned Silver Queen Ag-Au project, located in central British

Columbia. The new assays extend new mineralization in several areas: the west side of the Camp

Deposit; a blind, hangingwall vein north of the main Camp veins; and a previously undrilled portion of the

Sveinson Deposit.

Sveinson Deposit:

Drilling returned multiple gold and base-metal-enriched intercepts including:

a

1.5 metre

(est. TT) interval grading

1.5g/t Au

,

89g/t Ag,

1.5% Pb

and

16.2% Zn

(

11.2g/t AuEq

or

914g/t AgEq

)

within

a

7.7 metre

interval averaging

0.9g/t Au

,

57g/t Ag,

1.4% Pb

and

6.5% Zn

(

5.4g/t AuEq

or

445g/t AgEq

) from drillhole

SQ23-086

; and

a

2.2 metre

(est. TT)

interval grading

0.9g/t Au, 27g/t Ag, 1.2% Pb

and

2.9% Zn

(

3.1g/t AuEq or

252g/t AgEq

)

from drillhole

SQ23-084

.

These results are from two of four holes that tested a 200-metre drilling gap in the Sveinson deposit (see

Figure 2 and Table 1). Each of the four holes contain multiple intercepts, which help to build continuity to

depths of up to 350 metres below surface in several veins initially identified in 2022 drilling.

Camp Deposit:

Drill highlights include:

a

0.7 metre

(est. TT) interval grading

742g/t Ag, 0.7% Pb and 0.6% Zn

(

9.7g/t AuEq

or

790g/t

AgEq

) from drill hole

SQ23-082.

This interval is one of two higher-grade silver intercepts from drill hole SQ23-082 that extend

mineralization in the Camp Deposit an additional 100 metres laterally to the west, beyond which it

remains open for further drill testing. Mineralization was also identified near the top of hole SQ23-081

and is similar in tenor to previously reported intercepts in drill holes SQ23-079 and -080, confirming a

blind shallow target north of the main vein set under alluvium.

George Lake Target

The Company also reported that it has now completed 2,324 metres of new core drilling in 7 holes on the

George Lake target

as part of its 2023 Summer drill program. Drilling has confirmed visual

mineralization around historical intercepts adjacent to the Bulkley Crosscut (historic underground

workings) and extends the lateral projection of mineralization approximately 400 metres to the southeast

and up to 250 metres below surface. Mineralization remains open along strike and at depth. Assay

results from this drilling and over 1,400 soil samples, which were collected on the property in June, are

pending and are anticipated in the coming weeks.

Drilling is currently suspended due to wildfire risk in the area but will resume on the

Cole Lake target

once conditions allow.

VP Exploration Rob Macdonald commented,

"Work on the Silver Queen project through 2023

continues the systematic delineation of new mineralization throughout the property through a

combination of extending currently known veins as well as drill testing new targets developed through

compilation of historical data and recent surface work on the property. The property already contains a

significant existing mineral resource base that was updated in 2022, doubling the earlier 2019

resource, which we believe will increase with the further development and exploration of these new

targets. Today's news appears to support our view."

Figure 1: Plan Map of targets on the Silver Queen vein system, BC

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5566/176538_f08d291794b019d0_002full.jpg

Figure 2: Plan of the Camp/Sveinson targets showing Spring '23 drilling and mineralized solids

used to define the deposits

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5566/176538_f08d291794b019d0_003full.jpg

Table 1: Summary Composites from Spring '23 Drilling on the Camp-Sveinson Targets

Hole #

From

(m)

To

(m)

Interval

(m)

Au

(g/t)

Ag

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

AuEq

(g/t)

AgEq

(g/t)

ETT(m)

Camp Target - New Assays

SQ23-081

35.5

39.4

3.9

2.5

0.4

23

0.02

0.8

2.2

2.1

172

inc.

39.0

39.4

0.4

0.3

1.7

87

0.10

4.5

11.1

10.0

822

SQ23-082

300.7

301.3

0.7

0.5

0.0

525

0.01

0.4

0.7

6.9

566

SQ23-082

316.5

317.5

0.9

0.7

0.0

742

0.03

0.7

0.6

9.7

790

SQ23-082

347.6

349.9

2.3

1.6

0.0

139

0.02

0.1

0.4

2.0

161

SQ23-083

130.0

131.7

1.7

1.3

0.2

12

0.00

0.3

2.7

1.8

145

SQ23-083

139.5

140.0

0.6

0.4

1.4

50

0.01

0.8

2.1

3.3

270

Sveinson Target - New Assays

SQ23-084

135.4

136.2

0.8

0.6

1.9

85

0.67

2.7

9.3

9.4

768

SQ23-084

169.6

172.4

2.8

2.2

0.9

27

0.02

1.2

2.9

3.1

252

inc.

170.6

171.9

1.3

1.0

1.4

43

0.04

2.0

4.8

5.1

420

SQ23-085

149.3

149.5

0.3

0.2

1.8

59

0.10

3.7

5.0

6.4

528

SQ23-085

343.0

343.4

0.5

0.3

1.2

30

0.02

1.0

6.2

5.0

409

SQ23-085

434.5

437.0

2.5

1.5

0.5

29

0.06

0.7

2.2

2.2

183

SQ23-086

13.3

13.6

0.3

0.2

0.3

192

2.68

0.2

0.5

6.5

533

SQ23-086

236.1

246.5

10.4

7.7

0.9

57

0.09

1.4

6.5

5.4

445

inc.

236.8

241.7

4.9

3.6

0.9

64

0.03

1.4

9.8

7.1

581

inc.

236.8

238.8

2.0

1.5

1.5

89

0.04

1.5

16.2

11.2

914

SQ23-086

261.4

262.6

1.3

0.9

0.2

112

0.98

0.2

0.7

3.3

267

SQ23-086

435.3

436.3

1.1

0.8

0.4

128

2.42

0.3

0.7

5.6

462

SQ23-086

515.7

516.5

0.8

0.6

0.9

35

0.23

0.3

1.8

2.6

212

SQ23-087

183.4

184.0

0.6

0.4

0.8

24

0.08

1.0

3.9

3.5

287

SQ23-087

282.3

286.1

3.8

2.3

0.3

14

0.02

0.7

0.9

1.3

103

inc.

285.0

286.1

1.1

0.7

0.3

24

0.03

1.5

1.8

2.0

167

SQ23-087

306.8

307.1

0.4

0.2

0.0

62

0.02

0.0

10.2

5.8

476

Samples were analyzed by FA/AAS for gold and 48 element ICP-MS by MS Analytical, Langley, BC. Silver (>100ppm), copper, lead and zinc (>1%)

overlimits assayed by ore grade ICP-ES analysis, High silver overlimits (>1000g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav.

Silver >10,000g/t re-assayed by concentrate analysis, where a FA-Grav analysis is performed in triplicate and a weighed average reported.

Composites calculated using a 80g/t AgEq (1g/t AuEq) cut-off and <20% internal dilution, except where noted. Reported intervals are core lengths,

true widths undetermined or estimated. Accuracy of results is tested through the systematic inclusion of QA/QC standards, blanks and duplicates

into the sample stream. AuEq and AgEq were calculated using prices of $1,800/oz Au, $22/oz Ag, $3.50/lb Cu, $0.95/lb Pb and $1.30/lb Zn. AuEq

and AgEq calculations did not account for relative metallurgical recoveries of the metals.

Pb and $1.30/lb Zn. AuEq and AgEq calculations did not account for relative metallurgical recoveries of the metals.

About Silver Queen Project

The Silver Queen Project is a premier gold-silver property with over 100 years of historic exploration and

development and is located adjacent to power, roads and rail with significant mining infrastructure that

was developed under previous operators Bradina JV (Bralorne Mines) and Houston Metals Corp. (a

Hunt Brothers company). The property contains an historic decline into the No. 3 Vein, camp

infrastructure, and a maintained Tailings Facility.

The Silver Queen Property consists of 45 mineral claims, 17 crown grants, and two surface crown grants

totalling 18,852ha with no underlying royalties. Mineralization is hosted by a series of epithermal veins

distributed over a 6 sq km area. An updated NI43-101 Mineral Resource Estimate with effective date

December 1

st

, 2022 was detailed in a News Release issued on Jan 16, 2023, which can be found by

clicking

here

and the full Technical Report can be found on SEDAR and the Company's website.

More than 20 different veins have been identified on the property, forming an extensive network of zoned

Cretaceous- to Tertiary-age epithermal veins. The property remains largely under explored.

About Equity Metals Corporation

Equity Metals Corporation is a member of the Malaspina-Manex Group. The Company owns 100%

interest, with no underlying royalty, in the

Silver Queen project,

located along the Skeena Arch in the

Omineca Mining Division, British Columbia. The property hosts high-grade, precious- and base-metal

veins related to a buried porphyry system, which has been only partially delineated. The Company also

has a controlling JV interest (57.49%) in the

Monument Diamond project

,

NWT

, strategically located

in the Lac De Gras district within 40 km of both the Ekati and Diavik diamond mines.

The Company also

has royalty and working interests in other Canadian properties, which are being evaluated further to

determine their value to the Company.

Robert Macdonald, MSc. P.Geo, is VP Exploration of Equity Metals Corporation and a Qualified Person

as defined by National Instrument 43-101. He is responsible for the supervision of the exploration on the

Silver Queen project and for the preparation of the technical information in this disclosure.

On behalf of the Board of Directors

"Joseph Anthony Kizis, Jr."

Joseph Anthony Kizis, Jr., P.Geo

President, Director, Equity Metals Corporation

For further information, visit the website at

https://www.equitymetalscorporation.com

; or contact us at

604.641.2759 or by email at

[email protected]

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements. Forward-looking

statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from

those currently anticipated in such statements. Factors that could cause actual results to differ materially from those in forward looking statements

include the timing and receipt of government and regulatory approvals, and continued availability of capital and financing and general economic,

market or business conditions.

Equity Metals Corporation does not assume any obligation to update or revise its forward-looking statements,

whether as a result of new information, future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/176538