Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EPR.CN ·

Drill Results at the Tetepisca Graphite Property, North Shore Region of Québec

Drill Results

1

Suite 400, 3 Place Ville-Marie

Montreal, QC H3B 2E3

CANADA

E-POWER DRILLS 23.97 % Cg OVER 5.15 METRES AT THE TETEPISCA

GRAPHITE PROPERTY, NORTH SHORE REGION, QUÉBEC

NEWS RELEASE – Montréal, Québec. February 12, 2024. E-Power Resources Inc. (CSE:EPR) (“E-Power” or

the “Company”) is pleased announce the results of the drilling and exploration program completed on the

Tetepisca Graphite Property during the summer and fall of 2023.

Highlights include:

• Grass roots discovery on the Captain Cosmos claims including an intersection of 23.97

% Cg from surface to a depth of 5.15 metres ending in mineralization

• High grade graphite mineralization intersected over an 850 m strike length at the

Graphi-Centre target includes 17.85 % Cg over an intersection length of 3.80 metres

• A wide zone of graphite mineralization intersected at the 1078 target including 2.66

% Cg over an intersction length of 20.5 metres

James Cross, President and CEO of E -Power commented: We are pleased with the 2023 exploration

results and progress of the Tetepisca Project. The results at Capta in Cosmos represent a high grade

exploration discovery which we will be pursuing in the 2024 exploration season. The drill results

confirm resource potential over an 850 metre strike length at the Graphi-Centre target and over a 400

metre strike length at the 1078 target. The results also confirm that very significant strike lengths of

untested conductivity anomalies remain at both Graphi -Centre and 1078. We are busy planning the

2024 field season. We will be following up on these results and drilling targets to move towards

resource t onnage delineation and we will be taking bulk samples from known high grade surface

showings to establish flake size distribution and graphite concentrate quality for battery applications.

During the summer and fall of 2023, E -Power completed a n explo ration program consisting of 2650.5

metres in 18 diamond drill holes (NQ diameter core) and surface exploration which included beep mat

prospecting and drilling a total of 19.35 metres in 6 holes (BQ diameter core) using a man-portable drill. A

total of 672 m of core (650 samples) was analyzed for Carbon concentrations (per cent Carbon as graphite

or “% Cg”). The exploration was completed primarily at four target areas previously prioritized by the

Company including the Graphi-Centre, 1078, and Southern targets, and the Captain Cosmos group of claims.

All holes drilled intersected graphite mineralization. Thirty percent of the samples returned Cg values above

1 %. Significant Cg intercepts are reported in table 1 and the location of the targets is indicated in figure 1.

2

Table 1. Significant Cg intercepts, 2023 Tetepisca Drilling Program

Target Hole ID From (m) To (m) Length (m) Cg

Graphi Centre TTP23-010 50.50 51.60 1.10 3.61

Graphi Centre TTP23-010 57.75 58.25 0.50 17.80

Graphi Centre TTP23-011 65.00 67.60 2.60 1.30

Graphi Centre TTP23-011 71.10 71.60 0.50 2.37

Graphi Centre TTP23-012 130.60 131.10 0.50 3.40

Graphi Centre TTP23-012 136.30 136.90 0.60 4.70

Graphi Centre TTP23-013 7.70 11.50 3.80 17.85

Graphi Centre TTP23-013 28.30 28.80 0.50 15.60

Graphi Centre TTP23-014 8.15 8.75 0.60 15.00

Graphi Centre TTP23-014 14.60 18.30 3.70 9.57

Graphi Centre includes 14.60 15.90 1.30 17.30

Graphi Centre TTP23-014 27.30 31.00 3.70 4.21

Graphi Centre TTPbp23-004 0.00 2.55 2.55 5.84

Graphi Centre TTPbp23-005 0.00 3.90 3.90 6.00

Graphi Centre TTPbp23-006 0.00 1.00 1.00 13.16

Captain Cosmos TTPbp23-001 0.00 5.15 5.15 23.97

Captain Cosmos TTPbp23-002 0.00 3.60 3.60 16.93

Captain Cosmos TTPbp23-003 0.00 3.15 3.15 17.30

1078 TTP23-004 5.40 59.70 54.30 1.87

1078 includes 39.20 59.70 20.50 2.66

1078 includes 55.50 59.70 4.20 5.03

1078 TTP23-004 95.80 96.30 0.50 25.30

1078 TTP23-005 29.75 32.30 2.55 4.46

1078 includes 31.30 32.30 1.00 9.40

1078 TTP23-005 49.80 67.70 17.90 2.27

1078 includes 54.25 61.00 6.75 4.09

1078 TTP23-005 91.00 98.50 7.50 3.86

1078 includes 91.00 92.00 1.00 7.31

1078 TTP23-006 5.50 42.30 36.80 1.13

1078 TTP23-006 76.75 78.35 1.60 15.70

1078 TTP23-007 23.45 44.20 20.75 2.01

1078 includes 39.00 44.20 5.20 3.66

Notes:

• The reported length is the drill core intersection. True widths are not known.

• Prefix “TTP23” are NQ core hole. Prefix “TTPbp” are BQ core drilled with the man-portable drill.

• For the man-portable holes complete holes were assayed and reported from surface to end-of-hole

Graphi-Centre Target

Graphi Centre is a top priority target on the Tetepisca property. The pattern of conductivity is interpreted

as a folded graphitic unit from which the Company has defined 3 drill targets; the northern limb, the hinge,

and the southern limb zones. Only the northern limb was drill tested during the 2023 drilling campaign.

Significant intercepts from the Graphi -Centre drilling are summarized in table 1. Results which include

17.85 % Cg over and intersection length of 3.80 metres, 9.57 % Cg over an intersection length of 3.70 m, and

3

17.80 % Cg over an intersection length of 0.50 m occur over a stri ke length of approximately 850m along

the north limb zone. The man portable drilling returned 13.16 % Cg over 1.00 m, 6.00 % Cg over 3.90 m,

and 5.84 Cg over 2.55 m along the 850 m strike length . Following up on the mineralized trend as well as

drilling the hinge and southern limb zones at Graphi-Centre is a priorty resource delineation target for the

2024 exploration season.

Captain Cosmos Claims

Captain Cosmos is an earlier stage exploration target on the Tetepisca property which has been priortized

based on favourable response to historical airborne conductivity surveys. Work on the Captain Cosmos

target included beep mat prospecting to locate the airborne conductivity anomaly followed by excavation of

overburden to expose bedrock, and prospect drilling with the man -portable drill. Three short, relatively

closely spaced, holes were completed for a total of 11.9 m. Results of the Cg anayses range from 23.97 % Cg

to 16.93 % Cg (Ta ble 1). Further evaluation, including drilling, of the conductive trends on the Captain

Cosmos target claims as well as trenching and bulk sampling are planned for the 2024 field program.

1078 Target

Four holes were competed at the 1078 target. All four holes intersected lower grade Cg mineralization over

relatively long intersection lengths which include 1.87 % Cg over 54.3 m in hole TTP-23-004 (which includes

2.66 % Cg over 20.50 m), 2.27 % Cg over 17.90 m in TTP23-005, 1.13 % Cg over 36.8 m in hole TTP23-006,

and 2.01 Cg over 20.75 m in TTP23-007. All holes contained narrrower high grade intercepts including 25.3

% Cg over 0.5 m in TTP23-004 and 15.70 % Cg over 1.6 m in TTP23-006 (Table 1). The four holes drilled at

the 1078 target confirm mineralization over a 400 m strike length of the airborne conductor. The total length

of the conductive trend on the 1078 block of claims is approximately 4.25 km which will be evaluated for

resource potential during the 2024 exploration season.

Southern Target

A total of 7 holes were drill ed at the Southern target. Intitally 3 holes were completed on the western side

of the Southern target and subsequently 4 holes were completed on the eastern side. The southern target

was priortized based on conductivity signature as well historical drilling and trenching on adjacent property

claims to the east. Graphite was intersected in all holes drilled in the Southern target how ever with few

exceptions were narrow and low grade. No further work is planned for the Southern target at this time.

About the Tetepisca Property

The Tetepisca Property is located approximately 2 20 km north of the town and deep water port of Baie-

Comeau in the North Shore Region of Québec. The property is accessed by paved Provincial Highway 389

to the Manic 5 hydro-electric dam and then by a well developed network of logging roads. Total driving time

from Baie Comeau to the pro perty is approximately 3 .25 hours. Baie-Comeau is the planned location of a

200,000 tonne per year battery anode material producer. The property consists of 230 claims covering an

area of approximately 12,620 hectares within the emerging Tetepisca Graphite District (“TGD”) which is an

active exploration and development district with measured and indicated resources in excess of 100 Mt at

an average grade of 14% Cg. E-Power holds the largest number of claims in the TGD. The Tetepisca Property

provides an excellent opportunity to host very significant graphite resources in a tier-one jurisdiction

providing for environmentally and socially responsible development and production.

4

Figure 1. Southern Tetepisca Property. Drill and exploration targets

Figure 2. Graphi-Centre. Conductivty, drill collar locations and Cg results

5

Figure 3. 1078 Target. Conductivty, drill collar locations and Cg results

Analytical and QAQC

Geological logging, sampling, and QAQC of Tetepisca core was completed under the direction of Maxime

Bouchard, P.Geo. Graphitic carbon analyses were competed at ALS Geochemistry (“ALS”) an international

certified testing laboratory independent of E -Power. NQ core samples were prepared by sawing the core

with half the core returned to the core tray for archive and half placed in a labelled bag for shipment to ALS

in Val d’Or, Quebec. The archived core remains in secure storage in Saguenay, Quebec. BQ core samples

were not split and were shipped as whole core. Preparation of the samples for Graphitic Carbon analyses

included crushing the core sample to greater than 70% less than 2 mm, taking a 250 gram split of the crushed

material, and pulverizing the split to 85% les than 75 microns. A 0.10 g sample of the pulvized sample is

split for analysis and digested in 50% HCl to evolve carbonate as CO2. The residue was filtered, washed,

dried and then roasted at 425C. The roasted residue was analysed for carbon by oxidation, induction furnace

and infrared spectroscopy. ALS completes QAQC protocol controlling the sample handling, preparation, and

analyses processes. Independent QAQC included the insertion of Certified Reference Materials and check

analyses into the sample stream.

Qualified Persons

The 2023 Tetepisca drilling and exploration program was completed under the direction and supervision of

consulting geologist Maxime Bouchard, P.Geo and Jamie Lavigne, P.Geo, Vice President of Exploration and a

Director of E -Power Resources Inc. Mr. Lavigne has reviewed and approved the contents of this press

release. Mr. Bouchard and Mr. Lavigne are both Qualified Persons as defined in NI 43-101.

6

About E-Power

E-Power Resources Inc. is a Québec Corporation based in Montréal and focused on battery minerals

exploration in Québec. The Company is currently advancing two projects; the Tetepisca property, located

in the North Shore region of the Province and the Turgeon property located in the Abitibi region adjacent to

the Ontario border. The Company’s priority target is flake graphite on the Tetepsica Property. The Turgeon

property is located in the prolific Abitibi gold and base metal mining district and the Company is evaluating

Turgeon primarily for its copper-zinc and gold potential.

For more information about E-Power Resources Inc. please visit the Company website at: e -

powerresources.com

Notice Regarding Forward-Looking Statements:

All statements, other than statements of historical fact, contained in this news release constitute “forward-

looking information” within the meaning of applicable Canadian securities laws and “forward-looking

statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995

(referred to herein as “forward-looking statements”). Forward-looking statements include, but are not

limited to, the Company’s future exploration plans with respect to its property interests and the timing

thereof, the prospective nature of the projects, future graphite markets, success of exploration activities

and metallurgical test work, permitting time lines, currency exchange rate fluctuations, requirements for

additional capital, government regulation of exploration work, environmental risks, unanticipated

reclamation expenses, title disputes or claims and limitations on insurance coverage. Generally, these

forward-looking statements can be identified by the use of forward-looking terminology such as “plans”,

“expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”,

“anticipates” or “does not anticipate” or “believes”, or the negative connotation thereof or variations of

such words and phrases or state that certain actions, events or results, “may”, “could”, “would”, “will”,

“might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof.

All forward-looking statements are based on various assumptions, including, without limitation, the

expectations and beliefs of management, the assumed long-term price of graphite, that the Company will

receive required permits and access to surface rights, that the Company can access financing, appropriate

equipment and sufficient labour, and that the political environment within Canada and the United States

will continue to support the development of mining projects in Canada. In addition, the similarity or

proximity of other graphite deposits to the Company’s projects is not necessary indicative of the geological

setting an dmineralization at the Tetepisca project.

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that

may cause the actual results, level of activity, performance or achievements of GFG to be materially

different from those expressed or implied by such forward-looking statements, including but not limited

to: actual results of current exploration activities; environmental risks; future prices of gold; operating

risks; accidents, labour issues and other risks of the mining industry; availability of capital, delays in

obtaining government approvals or financing; and other risks and uncertainties. These risks and

uncertainties and the additional risks described in the Company’s most recently filed annual and interim

MD&A are not, and should not be construed as being, exhaustive.

Although E-Power has attempted to identify important factors that could cause actual results to differ

materially from those contained in forward-looking statements, there may be other factors that cause

results not to be as anticipated, estimated or intended. There can be no assurance that such statements

will prove to be accurate, as actual results and future events could differ materially from those anticipated

in such statements. In addition, forward-looking statements are provided solely for the purpose of

providing information about management’s current expectations and plans and allowing investors and

others to get a better understanding of our operating environment. Accordingly, readers should not place

undue reliance on forward-looking statements.

7

Forward-looking statements in this news release are made as of the date hereof and E-Power assumes no

obligation to update any forward-looking statements, except as required by applicable laws.

For information contact: James Cross, CEO, Tel: (438) 701-3736, [email protected]