Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EPL.V ·

Eagle Plains’ Partner Rockridge Resources Completes Airborne Geophysical Program at Knife Lake Copper Project - Drilling Planned

Exploration Programs

Eagle Plains’ Partner Rockridge Resources Completes Airborne Geophysical

Program at Knife Lake Copper Project - Drilling Planned

Cranbrook, B.C., March 11th, 2021: Eagle Plains Resources (TSX-V:EPL) has been notified by option

partner Rockridge Resources Ltd. (TSX-V: ROCK) (OTCQB: RRRLF) (Frankfurt: RR0)

(“Rockridge”) that it has completed an airborne geophysical program the Knife Lake Project located in

Saskatchewan, Canada (the “Knife Lake Project” or “Property”). Rockridge also announces its plans for an

upcoming 1,600 metres minimum drill program. Rockridge has an option agreement with Eagle Plains to

acquire a 100% interest in the Property that covers the Knife Lake Cu -Zn-Ag-Co VMS deposit (details

following). The contiguous claims total 32,663 hectares and are located approximately 50 km northwest of

Sandy Bay, Saskatchewan. A 357kV powerline runs within 16 km of the Knife Lake Deposit area.

Knife Lake VMS Project Map

https://www.rockridgeresourcesltd.com/_resources/projects/KnifeLake-Fig3.jpg

Winter Geophysical Program

Crews have now completed an airborne electromagnetic (EM) and horizontal magnetic gradiometer

geophysical survey at the Knife Lake Project using Geotech Ltd.’s VTEMTM Plus system. The survey was

strategically located over the Scimitar and Gilbert Lake targets to investigate over 30 linear kilometers of

prospective VMS stratigraphy which hosts the Knife Lake copper deposit.

Airborne Geophysical Results

http://www.rockridgeresourcesltd.com/_resources/images/Airborne-EM-results-03-10-2021.jpg

Preliminary data from the survey has revealed several conductive features of significant interest, eight

conductors have been prioritized for geophysical modeling based on their correlation with prospective

stratigraphy and favorable geo chemistry. These geophysical models will assist in targeting holes for the

upcoming drill program.

2021 Regional Exploration Program and Priority Target Areas

http://www.rockridgeresourcesltd.com/_resources/images/Knife-Lake-Airborne-EM-Feb2021.jpg

The Knife Lake deposit contains typical VMS mineralogy which has been significantly modified and

partially remobilized during the emplacement of granitic rocks. Therefore, the known deposit may represent

a remobilized portion of a presumably larger “primary” VMS deposit based on general observations about

the mineralogy, mineral textures and metal ratios in the deposit. Most of the historical work has con sisted

of shallow drilling at the deposit area with little regional work carried out and limited deeper drilling below

the deposit. As a result, there is strong discovery potential both at depth and regionally.

Upcoming Knife Lake Drill Program

Rockridge has recently commenced the mobilization of crew and equipment to complete a minimum of

1,600 metres diamond drill program consisting of 6-8 holes. Drilling will focus on discovering VMS style

copper deposits along newly defined conductors and at depth, underneath the Knife Lake deposit. Infill

drilling is also planned in the immediate area of the 2019 maiden resource. Downhole geophysics, borehole

electromagnetics (BHEM), will be utilized extensively throughout the program. Project management has

been contracted to TerraLogic Exploration Services of Cranbrook, BC.

Knife Lake Geology and History

The Knife Lake Project is interpreted to be a remobilized VMS deposit. The stratabound mineralized zone

is approximately 15m thick and contains copper, silver, zinc, gold and cobalt mineralization which dips 30°

to 50° eastward over a known strike -length within Rockridge’s claim area of 3,700 metres, and a known

average down-dip extension of approximately 300 metres.

Knife Lake Deposit Map

https://www.rockridgeresourcesltd.com/_resources/projects/KnifeLake-Fig2.jpg

The deposit is hoste d by felsic to intermediate volcanic and volcaniclastic rocks which have been

metamorphosed to upper amphibolite facies. The deposit contains VMS mineralogy which has been

significantly modified and partially remobilized during the emplacement of granitic rocks. The

mineralization straddles the boundary between two rock units and occurs on both limbs of an interpreted

overturned fold.

Rockridge completed twelve holes consisting of 1,053 metres of diamond drilling in the 2019 winter drilling

program. This r epresented the first drilling on the property since 2001 and had two primary objectives:

confirm the tenor of mineralization reported by previous operators and expand known zones of

mineralization. Highlights from the drill program included previously repo rted hole KF19003 which

intersected net-textured to semi-massive sulphide mineralization from 11.2m to 48.8m downhole. This 37.6

metre interval returned 2.03% Cu, 0.19 g/t Au, 9.88 g/t Ag, 0.36% Zn, and 0.01% Co for an estimated

2.42% CuEq. Additionally, p reviously reported drill hole KF19001 intersected net -textured to fracture -

controlled sulphide mineralization from 7.5 metres to 40.6 metres downhole. This 33.1 metre interval

returned 1.28% Cu, 0.12 g/t Au, 4.80 g/t Ag, 0.13% Zn, and 0.01% Co for an estimated 1.49% CuEq.

Knife Lake Plan Map and Drill Collar Locations

http://www.rockridgeresourcesltd.com/_resources/maps/KN-2019-DDH-Location-20190808.pdf

Compilation and initial modelling indicate potential for expansion of the deposit at depth. The recent

drilling focused on resource upgrade as well as infill drilling between historical holes. The program gave

the Company’s technical team valuable insights into the property geology, alteration, and mineralization

that will be applied to future regional exploration on the highly prospective and underexplored land

package.

The Knife Lake deposit is a near surface VMS deposit starting a few metres below surface and the deposit

remains open at depth and along strike for potential resource expansion. Recently Rockridge announced a

maiden NI 43-101 resource estimate for the Knife Lake deposit (see the News Release dated August 14 th,

2019) which consisted of an indicated resource of 3.8 million tonnes at 1.02% CuEq at a 0.4% CuEq cut -

off (3.8 MT at 0.83% Cu, 3.7 gpt Ag, 0.097 gpt Au, 82 ppm Co, 1740.7 ppm Zn). In addition there is an

inferred resource of 7.9 million tonnes at 0.67% CuEq at a 0.4% CuEq cut -off (7.9 MT at 0.53% Cu, 2.4

gpt Ag, 0.084 gpt Au, 53.1 ppm Co, 1454.9 ppm Zn). Refer to the NI 43 -101 Technical Report on the

Mineral Resource Estimate for the Knife Lake Property, Saskatchewan dated September 27, 2019 filed on

Sedar.

Knife Lake Option Agreement Details

To earn a 100% interest in the Knife Lake Project, Rockridge has agreed to make a cash payment to Eagle

Plains of $150,000 (complete), issue up to 5,550,000 common shares of Rockridge (2,750,000 shares issued

to date) and complete $3,250,000 in exploration expenditures (approximately $1,400,000 to date) over four

years. Eagle Plains will retain a 2% net smelter royalty (“NSR”) on certain claims which comprise the

project area. Under the terms of the agreement Rockridge is designated as the Operator of the project.

Qualified Persons

Kerry Bates, P. Geo., a “qualified person” for the purposes of National Instrument 43 -101 - Standards of

Disclosure for Mineral Projects, and a Geologist employed by TerraLogic Exploration Inc., has reviewed

and approved the scientific and technical disclosure in this news release.

About Eagle Plains Resources

Based in Cranbrook, B.C., Eagle Plains continues to conduct research, acquire and explore mineral projects

throughout western Canada. The Company is committed to steadily enhancing shareholder value by

advancing our diverse portfolio of projects toward dis covery through collaborative partnerships and

development of a highly experienced technical team. Eagle Plains also holds significant royalty interests in

western Canadian projects covering a broad spectrum of commodities. Management’s focus is to advance

its most promising exploration projects. In addition, Eagle Plains continues to seek out and secure high -

quality, unencumbered projects through research, staking and strategic acquisitions. Throughout the

exploration process, our mission is to help maintai n prosperous communities by exploring for and

discovering resource opportunities while building lasting relationships through honest and respectful

business practices.

Expenditures from 2011-2020 on Eagle Plains-related projects exceed $22M, most of which was funded by

third-party partners. This exploration work resulted in approximately 37,000 m of diamond -drilling and

extensive ground -based exploration work facilitating the advancement of numerous projects at various

stages of development.

On behalf of the Board of Directors

“Tim J. Termuende”

President and CEO

For further information on EPL, please contact Mike Labach at 1 866 HUNT ORE (486 8673)

Email: [email protected] or visit our website at http://www.eagleplains.com

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Ven ture Exchange)

accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not

limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential

mineral recovery processes, etc. Forward -looking statements address future events and conditions and therefore, involve inherent risks and

uncertainties. Actual results may differ materially from those currently anticipated in such statements.