Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

EPL.V ·

Eagle Plains Partner Earthwise Intercepts Mineralization in all Holes at the Iron Range Precious Metals Project, BC.

Drill Results Mergers & Acquisitions Corporate Updates

Eagle Plains Partner Earthwise Intercepts Mineralization in all Holes at the Iron

Range Precious Metals Project, BC.

Cranbrook, B.C ., June 16, 2026: Eagle Plains Resources Ltd. (TSX-V:EPL) (OTCQB: EG PLF) (“EPL” or “ Eagle

Plains”) is pleased to announce that partner Earthwise Minerals Corp. ( CSE: WISE FSE: 966; OTCQB: EWISF)

(“Earthwise” or “WISE”) has completed the diamond drilling program at Eagle Plains’ 100% owned Iron Range

Project, SE British Columbia. Earthwise holds the exclusive option to acquire up to a n 80% interest in the Iron

Range Project.

The 20,021 ha Iron Range Project is considered by management of both Eagle Plains and Earthwise to hold

excellent potential for the presence of structurally controlled gold-silver mineralization, iron-oxide copper-gold

(“IOCG”) and Sullivan -style lead -zinc-silver sed imentary-exhalative (“sedex”) mineralization. The property is

owned 100% by Eagle Plains, with part of the property subject to an underlying 1.0% Net Smelter Royalty held

by a third party. The drill program was managed by Terralogic Exploration Inc. and diamond drilling was

contracted to QB Drilling.

The 2026 drill program was designed to infill historical mineralized intercepts and assess continuity of

mineralization along trend at the Talon Zone structure, where 2010 drilling by Eagle Plains intersected 2 intervals

of strong and continuous mineralization including 14.0m grading 5.1g/t gold, 1.86% lead, 2.1% Zinc, 75.3g/t

silver and 7.1m grading 8.13g/t gold, 2.84% lead, 3.07% zinc, 86.6g/t silver (DDH IR10010).

See Iron Range Drill Plan Map here

Hole ID Easting* Northing* Elev. (m) Az. (°) Incl. (°) Length (m)

IR26053 543397 5445640 1371 270 -56 410

IR26054 543398 5445641 1371 295 -61 383

IR26055 543216 5445651 1369 223 -67 389

TOTAL 1182

*Collar locations projected in NAD83 UTM Zone 11N

DDH IR26053 was designed to cross-cut the Talon Zone structure, infilling historical holes IR11011 and IR11015

(125m spacing at target depth). The hole was collared in the middle Aldridge Formation, intercepting the

regionally significant lower-middle Aldridge Formation Contact (LMC) at approximately 120m depth. The Talon

Zone structure, intercepted between 280-396m, is defined by strong silica-feldspar alteration associated with

dense, chaotic quartz-feldspar-ankerite veins. Polymetallic mineralization (pyrrhotite-pyrite-sphalerite-galena-

arsenopyrite-sulfosalts) was noted throughout the structural zone within veins, as fracture infill and forming

localized breccia cement.

DDH IR26054 was designed to cross-cut the Talon Zone structure, infilling between historical holes IR10010

and IR11011 (60m drill spacing at target depth). The hole was collared in Middle Aldridge stratigraphy,

intersecting the LMC at approximately 53m. The Talon Zone Structure, intercepted between 258-345m, is

defined by strong silica-feldspar alteration associated with chaotic quartz-feldspar-ankerite veins. Polymetallic

mineralization (pyrrhotite-pyrite-sphalerite-galena-arsenopyrite-sulfosalts) was noted throughout the

structural zone as veins, fracture infill and localized breccia cement.

DDH IR26055 was designed to overcut IR11015, assessing continuity of the mineralized structural trend to the

southwest, an area that is historically underexplored. The hole successfully intercepted an upper and lower

mineralized horizon first defined in DDH IR11015. The hole was collared in the upper mineralized horizon (15-

80m), where polymetallic mineralization (pyrrhotite-pyrite-sphalerite-galena-arsenopyrite-sulfosalts) is

associated with intense oxidization of sulphides and strong silica and feldspar alteration of the Middle Aldridge

sediments. The main (lower) Talon Zone mineralized horizon was intercepted between 241-380m, a 40m step-

out from IR11015. The zone is defined by moderate silica alteration of Lower Aldridge sediments associated

with dense, chaotic quartz-feldspar-ankerite veining. Polymetallic mineralization (pyrrhotite-pyrite-sphalerite-

galena-arsenopyrite-sulfosalts) is dominantly hosted within the veins and as fracture infill.

Samples have been submitted to ALS Global (North Vancouver) for Fire Assay (Au) and full multi-element

characterization.

Chuck Downie, President and CEO of Eagle Plains commented “We are excited to return to exploration drilling

at the Iron Range . The known, structurally controlled, Talon Zone mineralization correlates with multi element

geochemical anomalies and strong IP resistivity and chargeability signatures, with similar features in the area

remaining untested by drilling.”

See Iron Range Property Information and Map here

Iron Range Project Summary

The 20,021ha Iron Range Project located near Creston, BC, is owned 100% by Eagle Plains, subject to a 1% NSR

held by a third party on a portion of the claim group. A well -developed transportation and power corridor

transects the southern part of the proper ty, including a high -pressure gas pipeline and a high -voltage hydro-

electric line, both of which follow the CPR mainline and Highway 3. The rail line provides efficient access to the

Teck smelter in Trail, B.C. The project is fully permitted with a Multi-Year Area Based (MYAB) permit in place

issued by the BC Ministry of Mining and Critical Minerals that includes provisions for geophysical work,

mechanical trenching, access trail construction and diamond drilling.

The Iron Range property covers an extensive area approximately 10km x 32km which overlies the regional Iron

Range Fault System (“IRFS”). Prior to the acquisition by Eagle Plains in 2001, the property had seen little

systematic exploration for other than iron resources known to exist on the property since the late 1800s. Since

2001, Eagle Plains and its partners have completed 21,593m of diamond-drilling in 87 holes, collected 2482 line-

km of airborne and surface geophysical data and analysed 10,053 soil geochemical samples, 495 rock samples

and 6955 drill core samples.

Drilling at Iron Range in 2010 resulted in the discovery of the Talon Zone, where drill-hole IR10-010 intersected

2 intervals of strong and continuous mineralization including 14.0m grading 5.1g/t gold, 1.86% lead, 2.1% Zinc,

75.3g/t silver and 7.1m grading 8.13g/t gold, 2.84% lead, 3.07% zinc, 86.6g/t silver (Eagle Plains news release

December 21st, 2010). Previous drilling 10km north of the Talon Zone in 2008 by Eagle Plains intersected gold

mineralization in drill-hole IR08006 which assayed 7.0m grading 51.52g/t (1.50 oz/ton) gold (Eagle Plains news

release dated April 20th, 2009).

Mineralization at the Pyromorphite Zone (BC MinFile 082FSE141) was discovered in 2009 after construction of

logging roads exposed sheared and brecciated sediments hosting cm -scale quartz veins bearing pyromorphite

(lead) mineralization. No significant work has been completed at the zone since its initial discovery by the

previous tenure holder. Rock (grab) sample SK10 -207 reports 27.0 g/t Au, 173.0 g/t Ag, and 13.4% Pb (BC

Assessment Report 31659). Rock (grab) sample MK10 -170 reports 54.7 g/t Au, 42.2 g/t A g, and 2.8% Pb (BC

Assessment Report 31659). 2025 fieldwork at the Pyromorphite returned up to 13.4 g/t Au, 27.2 g/t Ag, > 10,000

ppm As, and 2.7% Pb from an in-situ grab sample. (KBBIRR004) (Eagle Plains news release dated November 17,

2025). The poly-metallic (As-Pb-Zn) nature of the mineralization at the Pyromorphite Zone and the association

between arsenopyrite (As) and Au mineralization are consistent with the structurally hosted mineralization that

defines the Talon Zone target 12 km to the SW.

Rock grab samples are selective samples by nature and as such are not necessarily representative of the

mineralization hosted across the property. Some of the above results were taken directly from MINFILE

descriptions and assessment reports (ARIS) filed with the BC government. Management cautions that historical

results were collected and reported by past operators and have not been verified nor confirmed by a Qualified

Person but form a basis for ongoing work on the subject properties. Management cautions that past results or

discoveries on proximate land are not necessarily indicative of the results that may be achieved on the subject

properties.

Iron Range Option Agreement Details

To exercise the Option, Earthwise must make a series of cash payments and share issuances to Eagle Plains and

fund exploration expenditures on the Project. These payments, share issuance and expenditures are separated

into two phases, with the first Option entitling the Company to acquire a 70% interest in the Project by paying

CA$250,000, issuing an aggregate of 1,500,000 common shares to EPL and funding CA$4,000,000 in exploration

expenditures on the Project by over a four-year term. Pursuant to the second phase of the Option, the Company

may acquire an additional 10% interest in the Project (for an 80% total interest) by notifying Eagle Plains of its

intent to increase its interest to 80% and making an additional one-time payment of CDN$ 1,000,000 cash, and

completing a bankable feasibility study on the Property, before the eighth anniversary of the Option.

If the First Option or the Second Option is exercised, a 2% smelter returns royalty will be granted to the Eagle

Plains over the entire property, 1% of which may be repurchased for CA$1,500,000.

Eagle Plains will serve as Operator under the terms of Option and will reserve the right to use TerraLogic

Exploration Inc. as geoscience consultant. Following the exercise of either Option 1 or 2, Earthwise and E agle

Plains shall then form a 70/30 or 80/20 joint venture (“JV”) to further explore and develop the Property.

Qualified Persons

Charles C. Downie, P.Geo., a “qualified person” for the purposes of National Instru ment 43-101 - Standards of

Disclosure for Mineral Projects and an officer and director of Eagle Plains, has reviewed and approved the

scientific and technical disclosure in this news release.

About Eagle Plains Resources

Based in Cranbrook, B.C., Eagle Plains is a well-funded, prolific project generator that continues to conduct

research, acquire and explore mineral projects throughout western Canada, with a focus on critical metals

integral to an increasingly electrified, decarbonized economy.

The Company was formed in 1992 and is the fourth-oldest listed issuer on the TSX-V (and the only one of these

four that has not seen a roll-back or restructuring of its shares). Eagle Plains has continued to deliver

shareholder value over the years and through numerous spin outs has transferred over $115,000,000 in value

directly to its shareholders, with Copper Canyon Resources and Taiga Gold Corp. being notable examples.

Eagle Plains latest spinout, Eagle Royalties Ltd. (CSE:“ER”) was listed on May 24, 2023, and on October 30,

2025, ER shareholders overwhelmingly approved a three-cornered amalgamation that resulted in a reverse

takeover of Eagle Royalties by Summit Royalty Corp. The resulting issuer is named Summit Royalties Ltd. and

trades under the symbol SUM on the TSX Venture Exchange with a market capitalization of over $100M.

On October 2, 2024, Eagle Plains announced the formation of a separate division within the Company that will

give Eagle Plains’ shareholders direct exposure to strategic opportunities in Canadian green energy transition.

As a wholly owned subsidiary of Eagle Plains, Osprey Power Inc. (“OP”) will focus on identifying and advancing

innovative and diverse clean energy project portfolios in target markets throughout Canada, with an initial

focus on Western Canada.

Eagle Plains’ core business is acquiring grassroots critical- and precious-metal exploration properties. The

Company is committed to steadily enhancing shareholder value by advancing our diverse portfolio of projects

toward discovery through collaborative partnerships and development of a highly experienced technical team.

Expenditures from 2010-2025 on Eagle Plains-related projects exceed $41M, the majority of which was funded

by third-party partners. This exploration work resulted in approximately 50,000m of diamond-drilling and

extensive ground-based exploration work facilitating the advancement of numerous projects at various stages

of development.

Throughout the exploration process, our mission is to help maintain prosperous communities by exploring for

and discovering resource opportunities while building lasting relationships through honest and respectful

business practices.

On behalf of the Board of Directors of Eagle Plains

“C.C. (Chuck) Downie, P.Geo”

President and CEO

For further information on EPL, please contact Andrew Wilson at 1 866 HUNT ORE (486 8673)

Email: [email protected] or visit our website at https://www.eagleplains.com

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news

release may contain forward-looking statements including but not limited to comments regarding the timing

and content of upcoming work programs, geological interpretations, receipt of property titles, potential

mineral recovery processes, etc. Forward-looking statements address future events and conditions and

therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently

anticipated in such statements.