February 18, 2026 , Vancouver, British Columbia - Enduro Metals Corporation (TSXV: ENDR) (“Enduro”,

“Enduro Metals” or the “Company”) is pleased to announce results from its 2025 sampling program at its 100%

owned October Dome Project in central BC . Strongly mineralized gold skarn has been identified in bedrock,

extending a large gold- copper target to 5.5 kilometers. The project is located near the town of Likely, 10 km

north of Imperial Metals Corporation’s Mount Polley porphyry copper gold mine, and 7 km to the southeast of

the past producing QR gold mine (Figure 1) . Historical work by previous operators identif ied two areas of

alteration consistent with an alkalic porphyry copper-gold system. In 2013 drill hole OD-6 intersected 9 metres

of massive magnetite skarn grading 0.71 g/t gold with semi-massive pyrite layers accompanied by chalcopyrite,

epidote and garnet at the sediment/basalt contact (estimated true thickness). Work in 2025 has successfully

identified this skarn horizon in bedrock 500 metres to the southeast of the original projection of the horizon.

2025 Highlights:

• Gold skarn identified in bedrock for the first time

• Float and bedrock samples returned values ranging from background to 0.54 g/t gold over a 600 metre trend

• Soil samples from the same area defined a 450 metre gold anomaly ranging from 74 ppb to 9 12 ppb gold,

with copper values up to 0.13%

• Overall gold/copper target area now spans 5.5 kilometres.

Rob Cameron, CEO of Enduro Metals, commented: “Work at October Dome in 2025, for the first time, identified

strongly mineralized gold skarn in bedrock. This new discovery falls within a large 5.5 km long gold- copper

anomaly that has only seen limited historical drilling. With only one historical drill hole intersecting similar skarn

mineralization, we believe the scale and gold potential of this system is only beginning to be understood.”

2025 Work Program

A total of 46 rock samples and 9 soil samples were collected while geological mapping and prospecting new

exposures created by increased placer mining activity.

Rock samples collected in 2025 were primarily grab samples and are selective in nature. While not necessarily

representative of the overall mineralized system , they are effective in identifying areas of potential cohesive

mineralization. One third of rock samples returned greater than 100 ppb gold, and 30% exceeded 400 ppm

copper. Many samples contained visible chalcopyrite, pyrite, magnetite and epidote - minerals typically

associated with skarn systems (Figure 3).

Soil samples were collected from a scree slope buried beneath till and were comprised of colluvium and fine

rocks debris (Figure 2). Samples returned elevated gold and copper values, summarized in Table 1 below.

2

Table 1: soil sample summary:

Sample Au ppb Cu ppm Ag ppb

236180 97 178 552

236181 403 895 408

236182 912 385 1068

236183 588 728 879

236184 167 259 1330

236185 275 366 235

236186 232 759 1219

236187 103 478 105

236188 74 947 196

October Dome Property

The October Dome property was acquired in June 2025 through the me rger with Commander Resources. The

property is centrally located midway between the operating Mt Polley copper gold open pit mine and the past

producing open pit and underground QR Gold Mine property.

Historical exploration at October Dome focused on alkalic -style porphyry copper-gold systems associated with

monzonite and diorite intrusions , with the best drill results returning 69.5 metres grading 0.183 g/t gold and

0.1% copper (unverified, core length, true thickness unknown). In 2013, drilling by a previous operator returned

9 metres of massive magnetite, pyrite and epidote skarn grading 0.71 g/ t gold (DDH OD- 6, estimated true

thickness) geologically located at a major basalt/sediment contact , a setting similar to the QR Gold Mine

property (see the data verification statement below). Both the porphyry and skarn targets fall within a well

defined and robust copper and gold soil geochemical anomaly that coincides with strong magnetic and

chargeability anomalies. Bedrock exposure across the property is limited to less than 1% due to thick glacial till,

highlighting the importance of new exposures identified during the 2025 program.

Next Steps

The Company is currently evaluating follow-up exploration, including additional surface work and drill targeting

along the expanded skarn corridor. The scale of the anomaly and limited historical drilling provide significant

opportunity for future discovery. October Dome is one a several drill ready projects the company obtained

through its acquisition of Commander Resources. The focus for Enduro is its flagship Newmont Lake Project in

the Golden Triangle of British Columbia and intends to seek partnerships on these additional assets.

3

Figure 1: Property Location Map

4

Figure 2: Gold in Soil

5

Figure 3: Gold in Rocks

Qualified Person

Robert Cameron, P . Geo, Enduro's C hief Executive Officer, is the company's qualified person as defined by

National Instrument 43-101, Standards of Disclosure for Mineral Projects, and has reviewed and approved the

technical aspects of this release. Field work was supervised by Stephen Wetherup, P . Geo, VPX, for Enduro

Metals.

QAQC and Data Verification

All project analytical work was performed by Bureau Veritas in Vancouver, BC. At the laboratory rocks were

pulverized, split into smaller aliquots and analyzed by fire-assay (code FA330) for Au and 38 elements with a 4-

acid digestion and 38 element inductively coupled plasma and mass spectrometer process (ICP -MS, code

MA250). Soils were dried, sieved to smaller size fractions (-80 mesh) which utilized an Aqua Regia digestion and

finished with a multi-element ICP-MS analysis (AQ250) to produce the assays.

Mineral exploration data collected on the October Dome property has been compiled from a variety of sources

and previous operators covering a period of 41 years. Work was completed by Dome Exploration Canada Ltd,

Valley High Ventures Ltd., Bearing Resources Ltd., and Commander Resources. Work programs (excluding that

of Dome Exploration) and the data produced have been verified as accurate by Stephen Wetherup, (current

Enduro VPX and QP) or by Robert Cameron (current Enduro CEO and qualified person). Robert Cameron was

also the qualified person for Valley High Ventures and Bearing Resources. Stephen Wetherup and Robert

Cameron are “qualified persons” under NI43-101 Standards of Disclosure for Mineral Projects.

6

Historical drill core from Dome Exploration activities is not available and the Company is treating this data as

valid for exploration purposes, but not compliant with NI43- 101 Standards of Disclosure for use in future

resource estimates. These drill collars have been re-located and surveyed and in addition were observed at the

time of drilling by Robert Cameron.

See news dated November 24, 2011, November 7, 2012, December 3, 2013 (under Bearing Lithium) posted on

SEDAR+ for detailed technical disclosure.

About Enduro Metals

Enduro Metals is an exploration company focused on its Newmont Lake Project; a 688 km2 property located

within the heart of British Columbia's Golden Triangle. Building on prior results, Enduro Metals' geological team

has outlined multiple deposit environments of interest across the Newmont Lake Project including high- grade

epithermal/skarn gold along the McLymont Fault, and copper-gold alkalic porphyry systems at Burgundy and

Andrei. The Company maintains a broader portfolio of mineral projects across Canada including the advanced

Burn porphyry copper and gold project in northern British Columbia.

On Behalf of the Board of Directors of Enduro Metals Corporation

“Robert Cameron”

Chief Executive Officer

For further information please contact:

Robert Cameron, CEO

Tel: +1 (778) 989-1501

Email: [email protected]

www.endurometals.com

Forward-Looking Statements

This news release contains statements that constitute "forward -looking statements". Such forward looking

statements involve known and unknown risks, uncertainties and other factors that may cause Enduro’s actual

results, performance or achievements, or developments in the industry to differ materially from the anticipated

results, performance or achievements expressed or implied by such forward- looking statements. Forward

looking statements are statements that are not historical facts and are generally, bu t not always, identified by

the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and

similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur.

Although Enduro believes the forward-looking information contained in this news release is reasonable based

on information available on the date hereof, forward- looking statements by their nature involve assumptions,

known and unknown risks, uncertainties and other factors which may cause our actual results, performance or

achievements, or other future events, to be materially different from any future results, performance or

achievements expressed or implied by such forward-looking statements.

THE FORWARD -LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE

EXPECTATIONS OF ENDURO AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO

CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD -LOOKING

INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE ENDURO

MAY ELECT TO, NEITHER OF THEM UNDERTAKES TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME

EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or

accuracy of this release.