Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EMPS.CN ·

EMP Metals Files Technical Report to Support Preliminary Economic Assessment for Viewfield Lithium Brine Project

Technical Reports (NI 43-101) Economic Studies

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

EMP METALS FILES TECHNICAL REPORT TO SUPPORT PRELIMINARY

ECONOMIC ASSESSMENT FOR VIEWFIELD LITHIUM BRINE PROJECT

Vancouver, British Columbia, February 15, 2024 – EMP Metals Corp. (CSE: EMPS) (OTCQB:

EMPPF) (“EMP Metals” or the “Company”) is pleased to announce the filing of a National

Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) technical report

(the “Technical Report”) with respect to the Viewfield Lithium Brine Project. The Technical Report

titled “NI 43-101 Technical Report: Preliminary Economic Assessment of the Lithium Brines in the

Viewfield Area – Phase 1” dated February 12, 2024 and effective as of October 31, 2023 supports

the preliminary economic assessment (the “PEA”) on the Viewfield Lithium Brine Project (see

news release dated January 9, 2024). The Technical Report is available on www.sedarplus.com

and on the Company’s website at www.empmetals.com.

PEA Highlights

• Average of 12,175 tonnes/year of battery-grade lithium carbonate over a 23-year

period;

• USD $1.49 billion NPV using an 8% discount on a pre-tax basis;

• Pre-tax IRR of 55% which represents a payout duration of 2.1 years;

• USD $1.06 billion NPV using an 8% discount rate on an after-tax basis;

• After-tax IRR of 45% which represents a payout duration of 2.4 years;

• All-in operating costs (“OPEX”) of $3,319 USD/tonne LCE;

• Total capital expenditures (“CAPEX”) of $571 million USD inclusive of both direct and

indirect capital costs, including $52 million USD in contingency;

• Weighted average lithium concentrations of 128 mg/L from 7 target zones over the

project life (range of 84 mg/L to 259 mg/L);

• Project economics used a base USD $20,000/tonne. 20% variation in price to either

USD$16,000/tonne or USD $24,000/tonne of LCE generates after-tax IRRs of 34% and

56%, respectively, and

• PEA encompasses approximately 11,000 net hectares, representing 46% of HCL’s

Viewfield land holdings and only 14% of HCL’s total land holdings in Southern

Saskatchewan.

Project Development

The development plan employed in the PEA has been broken into three distinct units:

1. Wellfield: includes all production wellbores, disposal wellbores and pipeline networks.

2. Direct Lithium Extraction (“DLE”): includes infrastructure related to pre-filtration and

DLE operations. Koch Technology Solutions (“KTS”) was the DLE technical partner

selected for the PEA.

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

3. Concentration, Refining and Conversion (“CRC”): includes all infrastructure downstream

of DLE required to refine and convert lithium chloride eluent into battery grade LCE.

Saltworks Technologies (“Saltworks”) was the CRC technical provider selected for the

PEA.

Based on production testing and fluid analysis conducted by HCL in 2023 in the Viewfield project

area, in addition to publicly available lithium testing throughout the area, it is expected to see

lithium grades of 84 mg/L to 259 mg/L in the seven target members of the Duperow within the

PEA lands. Over the life of the project, an average weighted concentration of 128 mg/L has been

estimated.

Exploitation of the resource will occur in two production stages via multi-leg, horizontal

wellbores. All project capital (minus end-of life capex) is allocated at the beginning of the project,

with production estimated to commence in Q1 2027.

• Stage 1: Wymark C, D and E (Years 1-7)

o These zones are the shallowest and highest concentration (160 mg/L to 259 mg/L)

zones and will be produced first through to depletion

o Average LCE output during Stage 1 is 18,850 tonnes/year with average OPEX of

$2,332/tonne USD

• Stage 2: Wymark A, B and Saskatoon A, B (Years 8 onward)

o These zones are lower concentration (84 mg/l to 145 mg/L) and will be exploited

after depletion of Wymark C, D and E

o Average LCE output during Stage 2 is 10,200 tonnes/year with average OPEX of

$4,166/tonne USD

Note: A recovery factor of 50% of Total Lithium in Place was estimated for the PEA

A total of 36 multi-leg production wells will be drilled to exploit 7 target members of the

Duperow, in addition to 30 vertical disposal wells to dispose of spent brine and process water. A

network of underground pipelines will be constructed to transport the large water volumes from

the wellheads to a DLE site for extraction and concentration to lithium chloride, and from there

the eluent will be transported via pipelines to a CRC site for refining and conversion into battery-

grade LCE. A total of five DLE sites and two CRC sites will process a daily average of 62,000 m3/day

of brine, resulting in an average output of 12,175 tonnes/year of battery-grade LCE.

Additional information related to the PEA is contained in the Company’s news release dated

January 9, 2024.

PEA Cautionary Note

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

The PEA is preliminary in nature and includes inferred resources that are considered too

speculative to have the economic considerations applied to them that would enable them to be

categorized as mineral reserves and there is no certainty the estimates presented in the PEA will

be realized.

About EMP Metals

EMP Metals is a Canadian-based lithium exploration and development company focused on large

scale resources using direct lithium extraction (“DLE”). EMP Metals, in partnership with ROK

Resources Inc., currently holds 196,000 net (79,300 hectares) acres of Subsurface Dispositions

and strategic wellbores in Southern Saskatchewan. For more information, please go to the

Company’s website at www.empmetals.com

Qualified Persons and Technical Report

The Preliminary Economic Assessment was prepared by Sproule Associates Limited. (“Sproule”)

with the assistance of the contractors outlined below. All contractors completing the report are

Qualified Persons as defined by NI 43-101 and are independent of the Company. The National

Instrument 43-101 PEA report will be filed on SEDAR (www.sedarplus.com) within 45 days.

Sproule Associates Limited: Sproule is a global energy consulting and advisory firm that helps

companies, investors and governments minimize risk and optimize business decisions. Ms.

Meghan Klein (“Klein”), P.Eng., is the Sr. Manager Engineering at Sproule and a Qualified Person

for the PEA.

Red Tree Exploration Inc. (“Red Tree Exploration”): Red Tree Exploration is an independent

Geological consulting company with experience in oil and gas, lithium and helium evaluations.

Mr. Trevor Else (“Else”), P.Geo., is a Qualified Person for the PEA and the President of Red Tree

Exploration.

Koch Technology Solutions: Koch Technology Solutions is a technology licensing business, a part

of Koch Engineered Solutions. KTS creates value for its customers across a growing portfolio of

technologies including the polyester value chain, the refining industry and lithium extraction

fields. NojanGhadi (“Ghadi”), is a Qualified Person for the PEA.

Saltworks Technologies: Saltworks is a team of engineers, scientists and builders focused on the

innovation, construction and delivery of full-scale systems to treat industrial wastewater and

refine lithium into a battery-grade product. Mr. Ben Sparrow (“Sparrow”), P.Eng., is a Qualified

Person for the PEA and CEO of Saltworks.

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

Each of Klein, Else, Ghadi and Sparrow are independent Qualified Persons in accordance with NI

43-101 and have reviewed and approved the technical contents of this news release.

For more information, please contact:

Rob Gamley, President & CEO Paul Schubach, COO

[email protected] [email protected]

Phone: 1-604-689-7422 Phone: 1-306-519-8341

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on

assumptions as of the date of this news release. These statements reflect management's current

estimates, beliefs, intentions and expectations. They are not gu arantees of future performance.

EMP Metals cautions that all forward -looking statements are inherently uncertain, and that

actual performance may be affected by a number of material factors, many of which are beyond

EMP Metals’ control. Such factors includ e, among other things: risks and uncertainties relating

to EMP Metals' limited operating history, ability to obtain sufficient financing to carry out its

exploration and development objectives on its mineral properties, obtaining the necessary

permits to carry out its activities and the need to comply with environmental and governmental

regulations. Accordingly, actual and future events, conditions and results may differ materially

from the estimates, beliefs, intentions and expectations expressed or impli ed in the forward -

looking information. Except as required under applicable securities legislation, EMP Metals

undertakes no obligation to publicly update or revise forward-looking information.

Neither the Canadian Securities Exchange (“CSE”) nor its Regulation Services Provider (as that

term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of

this news release.