EMP Metals Corp.- Horizontal Drilling Update
Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4
EMP METALS COMPLETES 8-24 VERTICAL WELL AND COMMENCES
4-23 HORIZONTAL WELL IN SOUTHEAST SASKATCHEWAN
Vancouver, British Columbia, August 27, 2024 – EMP Metals Corp. (CSE: EMPS) (OTCQB:
EMPPF) (“EMP Metals” or the “Company”) is pleased to provide an update on its ongoing
summer drilling program at the Viewfield project in Saskatchewan.
The Company has successfully completed drilling the first vertical test well (8-24) of the
program, designed to confirm lithium concentrations and define the reservoir characteristics in
the northern part of the Viewfield area. Key highlights include:
● Approximately 72 meters of core was extracted, providing critical data on formation
permeability and porosity
● Brine sampling from multiple isolated zones within the Duperow formation has commenced
● Core samples have been sent to a laboratory in Calgary for detailed analysis, with full results
expected within two months
Paul Schubach, COO of EMP Metals, commented, "The completion of this vertical well marks an
important step in expanding our resource at Viewfield. The core samples and brine analysis will
provide valuable data to support our geological model and help correlate results across our
land base."
The Company has also begun drilling its second well of the summer program, a horizontal well
(4-23) targeting the Duperow formation. This well represents a significant milestone as it is
believed to be:
● The first horizontal well drilled into the Duperow formation for lithium brine extraction in
Saskatchewan
● Potentially the first such well in North America or globally for lithium extraction
The horizontal well design includes:
● Two parallel one-mile horizontal legs within the same high-concentration zone
● Initial targeted flow rates of approximately 1,000 cubic meters per day from a single zone
● Ability to conduct extended flow testing and pressure monitoring
Mr. Schubach added, "With the help and support from our technical team, field staff, and
contractors, we are excited to pioneer horizontal drilling techniques for lithium brine extraction
in the Duperow formation. This approach allows us to target specific high-grade zones, optimize
lithium recovery, control concentration, and has the potential to significantly increase flow
rates compared to vertical wells."
The Company anticipates completing the drilling of the horizontal well within the next 7 days,
followed by site preparation for flow testing. Initial results from the vertical well brine sampling
Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4
are expected within the coming weeks, with ongoing updates to be provided as additional data
becomes available.
About EMP Metals
EMP Metals is a Canadian-based lithium exploration and development company focused on large
scale resources using direct lithium extraction (“DLE”). EMP Metals currently holds 196,000 net
(79,300 hectares) acres of Subsurface Dispositions and strategic we llbores in Southern
Saskatchewan. For more information, please go to the Company’s website at
www.empmetals.com
For more information, please contact:
Rob Gamley, President & CEO
Phone: 1-604-689-7422
Paul Schubach, COO
Phone: 1-306-519-8341
Forward-Looking Statements
Information set forth in this news release contains forward-looking statements that are based on
assumptions as of the date of this news release. These statements reflect management's current
estimates, beliefs, intentions and expectations. They are not gu arantees of future performance.
EMP Metals cautions that all forward -looking statements are inherently uncertain, and that
actual performance may be affected by a number of material factors, many of which are beyond
EMP Metals’ control. Such factors includ e, among other things: risks and uncertainties relating
to EMP Metals' limited operating history, ability to obtain sufficient financing to carry out its
exploration and development objectives on its mineral properties, obtaining the necessary
permits to carry out its activities and the need to comply with environmental and governmental
regulations. Accordingly, actual and future events, conditions and results may differ materially
from the estimates, beliefs, intentions and expectations expressed or impli ed in the forward -
looking information. Except as required under applicable securities legislation, EMP Metals
undertakes no obligation to publicly update or revise forward-looking information.
Neither the Canadian Securities Exchange (“CSE”) nor its Regulation Services Provider (as that
term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of
this news release.