Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EMPS.CN ·

Emp Metals Completes Horizontal Flow Testing Program – Average Lithium Concentration of 241 Mg/L and Flow Rates of 418 M3/DAY

Corporate Updates

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

EMP METALS COMPLETES HORIZONTAL FLOW TESTING PROGRAM –

AVERAGE LITHIUM CONCENTRATION OF 241 MG/L AND FLOW RATES

OF 418 M3/DAY

Vancouver, British Columbia, January 16, 2025 – EMP Metals Corp. (CSE: EMPS) (OTCQB:

EMPPF) (“EMP Metals” or the “Company ”) is pleased to announce the successful completion

and results of the recent Viewfield Horizontal Flow Testing Program. This is the first extended

flow test performed by the Company on the 4-23B Horizontal Production Well drilled specifically

to target the highest lithium brine concentration discovered to date in Canada at the Viewfield

Project.

Flow Testing Program Highlights:

• Average flow rate: 418 m3/day

• Average Lithium concentration: 241 mg/L

• 60+ day program is the longest duration lithium brine flow test in Saskatchewan to date

Paul Schubach, COO of EMP Metals, commented, “This well has exceeded our expectations. The

expertise of our local drilling contractors and our technical team ha ve come together incredibly

well to successfully complete this specialized type of drilling. The length of our flow testing

program combined with achieved flow rates, stable lithium concentration, and minimal

contamination, continue to showcase high value in the brine available on our land base. The

investment into the 4-23 facility provides options for us to continue testing and further derisking

the Viewfield project.”

The well, at a depth of 1,856m, is the first horizontal well drilled into the Duperow formation for

lithium production in Saskatchewan and provides a differentiated approach to lithium extraction

by leveraging local talent and common drilling practices in Southeast Saskatchewan. Advantages

of this approach include:

• Improved flow rates

• Increased recovery

• Targeted extraction of high concentration brine

• Improved economics as modeled in the Viewfield Preliminary Economic Assessment1

The flow testing program extended over 60 days with flow rates optimized for use with existing

injection infrastructure. Continuous monitoring from multiple downhole and surface sensors

were utilized to collect data from key variables to support future reservoir modeling. The

modeling will allow for improved simulations and more accurate representations of subsurface

performance. A surface facility was constructed to support the program and has the capability to

support future plans for additional field testing and project development.

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

Brine sampling and analysis continues to show high quality and clean characteristics with no H2S

or oil contamination. Absence of these contaminants allows for a more efficient conversion to

lithium chemicals and modelling completed to date by EMP clearly indicates the potential for

significant reduction in both Capital and Operating expenses.

The Company delivered the samples to an independent laboratory, Isobrine Solutions

(“Isobrine”), which offers specialized and rigorous brine evaluation , to p erform testing on the

Company’s brine samples.

About EMP Metals

EMP Metals is a Canadian-based lithium exploration and development company focused on

large-scale resources using direct lithium extraction (DLE). EMP Metals currently holds 196,000

net (79,300 hectares) acres of Subsurface Dispositions and strategic wellbores in Southern

Saskatchewan. For more information, please go to the Company’s website at

www.empmetals.com

For more information, please contact:

Rob Gamley, President

[email protected]

Phone: 1-604-689-7422

Paul Schubach, COO

[email protected]

Phone: 1-306-519-8341

1Additional details of the Preliminary Economic Assessment are set forth in the news releases

dated January 9, 2024 and February 15, 2024.

The Technical Report is available on www.sedarplus.com and on the Company’s website

at www.empmetals.com

Preliminary Economic Assessment Cautionary Note

The Preliminary Economic Assessment on the Viewfield Lithium Brine Project is preliminary in

nature and includes inferred resources that are considered too speculative to have the economic

considerations applied to them that would enable them to be categorized as mineral reserves

and there is no certainty the estimates presented in the PEA will be realized. Mineral resources

that are not mineral reserves do not have demonstrated economic viability.

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

QP

The technical content on this website has been reviewed and approved by Greg Bronson, P. Geo.,

a qualified person for the purpose of National Instrument 43-101. Mr. Bronson is not

independent as he is a director of the Company.

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on

assumptions as of the date of this news release. These statements reflect management's current

estimates, beliefs, intentions and expectations. They are not guarantees of future performance.

EMP Metals cautions that all forward-looking statements are inherently uncertain, and that

actual performance may be affected by a number of material factors, many of which are beyond

EMP Metals’ control. Such factors include, among other things: risks and uncertainties relating

to EMP Metals' limited operating history, ability to obtain sufficient financing to carry out its

exploration and development objectives on its mineral properties, obtaining the necessary

permits to carry out its activities and the need to comply with environmental and governmental

regulations. Accordingly, actual and future events, conditions and results may differ materially

from the estimates, beliefs, intentions and expectations expressed or implied in the forward-

looking information. Except as required under applicable securities legislation, EMP Metals

undertakes no obligation to publicly update or revise forward-looking information.

The Canadian Securities Exchange has neither approved nor disapproved the information

contained herein and does not accept responsibility for the adequacy or accuracy of this news

release.