Emerita announces 14.07 MT Indicated Resource grading 3.29% Zn, 1.66% Pb, 0.46% Cu , 75.2 g/t Ag and 1.39 g/t Au (7.63% ZnEq) and 4.71 MT Inferred Resource at 4.70% Zn, 2.14% Pb, 0.54% Cu, 72.4% Ag, 0.90 g/t Au (9.29% ZnEq). Deposits remain open and drilling continues.

Drill Results Resource Estimates

36 Lombard Street West, Floor 4, Toronto, ON, Canada, M5C 2X3

Emerita announces 14.07 MT Indicated Resource grading 3.29% Zn, 1.66% Pb, 0.46% Cu , 75.2 g/t

Ag and 1.39 g/t Au (7.63% ZnEq) and 4.71 MT Inferred Resource at 4.70% Zn, 2.14% Pb, 0.54% Cu,

72.4% Ag, 0.90 g/t Au (9.29% ZnEq). Deposits remain open and drilling continues.

TORONTO, May 23, 2023 -- Emerita Resources Corp. (TSX – V: EMO; OTCQB: EMOTF; FSE: LLJA) (the

“Company” or “Emerita”) is pleased to announce the maiden independent NI 43 -101 comp liant resource

estimate based on drill results from the 2022-23 resource delineation drilling program at La Romanera and La

Infanta deposits, part of Emerita’s wholly owned Iberian Belt West project (“IBW” or the “Project”). Mineral

Resource estimation was completed by Wardell Armstrong International Limited ( “WAI”) using drillhole

databases and geological models developed by the Emerita geology team and subseq uently verified and

refined in collaboration with WAI. WAI has considerable experience working with deposits in the Iberian Belt

and has completed similar studies for producing operations in the region. IBW hosts three previously identified

massive sulphi de deposits: La Infanta, La Romanera and El Cura. Initial exploration work has recently

commenced at El Cura and all deposits are open for expansion along strike and at depth . Drilling is expected

to continue at IBW through 2023 and into 2024 targeting continued expansion of the IBW resource.

Metallurgical testing of the deposits is commencing.

Resource Estimate Criteria

In calculating the resource estimate , WAI used a cut off grade of 3% Zinc equivalent (“ZnEq”) . In order to

calculate the ZnEq grade , the QP consulted with metallurgists within the WAI team to establish appropriate

recoveries to use for the estimate based on prior experience in the Iberian Bel t and similar deposits . It is

important to note that the recovery factors used in the estimate are not based on metallurgical test data as

this work is not yet completed. The metal recoveries are based on representative results from other deposits

in the belt. La Romanera is a unique deposit within the Iberian pyrite belt in that a significant portion of the

deposit has highly elevated gold values relative to other deposits in the region. As such , there is not a good

metallurgical analogy for the recovery of gold from higher grade gold mineralization in the region. The high

gold grades are not ubiquitous throughout the deposit such that the overall gold grade reported represents a

weighted average of higher grade and lower grade mineralization. For the ZnEq calculation, the gold recovery

factor used was 20%. An important opportunity and challenge for the Company will be to work with its

metallurgical consultants to improve the gold recoveries from the gold enriched portions of the deposit. Such

an improvement could positively add to the ZnEq grade and tonnage at La Romanera.

Resource Highlights:

• Iberia Belt West Initial Mineral Resource Estimate (“MRE”)

o Indicated 14.07 million tonnes (“MT”) grading 3.29% Zn, 1.66% Pb, 0.46% Cu, 75.2 g/t Ag

and 1.39 g/t Au (7.63% ZnEq)

o Inferred 4.71 MT grading 4.70% Zn, 2.14 % Pb, 0. 54% Cu, 7 2.4 g/t Ag and 0.90 g/t Au

(9.29% ZnEq)

• La Romanera

o Indicated 13 MT grading 2.98% Zn, 1.45% Pb, 0.42% Cu, 74.1 g/t Ag and 1.48 g/t Au (7.08%

ZnEq)

o Inferred 3.14 MT grading 4.85% Zn, 1.96 % Pb, 0.45% Cu, 71.3 g/t Ag and 1.16 g/t Au

(9.16% ZnEq)

36 Lombard Street West, Floor 4, Toronto, ON, Canada, M5C 2X3

o The La Romanera mineral resource estimate was calculated using dat a from 144 holes

comprising 52,750 meters of drilling.

• La Infanta

o Indicated 1.07 MT grading 7.10% Zn, 4.24% Pb, 1.03% Cu 88.5 g/t Ag and 0.32 g/t Au

(14.32% ZnEq)

o Inferred 1.56 MT grading 4.41% Zn, 2.49% Pb, 0.74% Cu, 74.7 g/t Ag and 0.38 g/t Au (9.55%

ZnEq)

o The La Infanta mineral resource estimate was calculated using data from 86 holes

comprising 19,565 m of drilling.

• Mineralization remains open at both deposits

o The MRE confirms the resource starts at or near surface and remains open for expansion

at depth and along strike.

• Next steps

o La Romanera and La Infanta deposits occur approximately 6km from each other. Near -

term focus for the Emerita exploration team is to continue to expand the mineralization

at La Romanera and explore the area between the two deposits with particular focus on

the historic El Cura target. Drilling of El Cura has commenced.

o Metallurgical sampling program, La Romanera and La Infanta commencing.

David Gower, P.Geo., CEO of Emerita stated, “The last 12 months have been a busy and exciting time for the

Spain based Emerita exploration team. It is a credit of the team to be able to release our first NI 43 -101

compliant resource estimate for the IBW project in a compressed time frame given drilling commenced on La

Romanera only last summer. T his represents an interim mineral resource estimate as work continues to

expand the resources at IBW. The recent exploration mapping, drilling and geophysical surveys demonstrate

both La Romanera and La Infanta remain open along strike and at depth. This coupled with targets associated

with the recently expanded land position provides a lot of additional targets for new discoveries. Metallurgical

test work is commencing which will in form a key component of a future economic study of IBW while we

continue to explore.”

36 Lombard Street West, Floor 4, Toronto, ON, Canada, M5C 2X3

Table 1: Resource Table

The following table summarizes the maiden Mineral Resource Estimate for the Iberian Belt West (IBW) Project:

Average Grade Metal Content

Deposit Class Tonnes Zn Pb Cu Ag Au ZnEq Zn Pb Cu Ag Au ZnEq

Mt % % % g/t g/t % kt kt kt koz koz kt

La Romanera

Indicated 13.00 2.98 1.45 0.42 74.1 1.48 7.08 387 188 54 30,979 617 920

Inferred 3.14 4.85 1.96 0.45 71.3 1.16 9.16 153 62 14 7,205 117 288

La Infanta Indicated 1.07 7.10 4.24 1.03 88.5 0.32 14.32 76 45 11 3,051 11 154

Inferred 1.56 4.41 2.49 0.74 74.7 0.38 9.55 69 39 12 3,758 19 149

IBW Project Indicated 14.07 3.29 1.66 0.46 75.2 1.39 7.63 463 233 65 34,030 629 1,074

Inferred 4.71 4.70 2.14 0.54 72.4 0.90 9.29 222 101 26 10,963 137 438

Notes:

1. Mineral Resources are classified according to definitions outlined in CIM Standards on Mineral Resources and Reserves, Defini tions and

Guidelines (CIM, 2014);

2. The effective date of the Mineral Resource Estimate for La Romanera is May 4, 2023 and the effective date of the Mineral Resource Estimate

for La Infanta is April 30, 2023;

3. Mineral Resources are reported at a cut-off grade of 3.0% zinc equivalent (ZnEq) where;

a. ZnEq = [(Zn grade * Zn recovery * Zn price) + (Pb grade * Pb recovery * Pb price) + (Cu grade * Cu recovery * Cu price) + (Ag grade

* Ag recovery * Ag price) + (Au grade * Au recovery * Au price)] / (Zn recovery * Zn price);

b. Long term price assumptions are US$3000/t Zn, US$2300/t Pb, US$9500/t Cu, US$25/oz Ag and US$1800/oz Au;

c. Metallurgical recovery assumptions are 100% Zn, 80% Pb, 80% Cu, 80% Ag and 20% Au. 100% Zn recovery ensures ZnEq grade >

Zn grade for all blocks;

4. At La Infanta, blocks less than 3.0% ZnEq when diluted over a 3m minimum mining width were excluded from the Mineral Resource.

Thickness at La Romanera typically exceeds 3m;

5. Only primary sulphide mineralisation is included in the Mineral Resources;

6. Metal grade and content represents contained metal in the ground and have not been adjusted for metallurgical recovery or mining dilution;

7. Mineral Resources are not Reserves until they have demonstrated economic viability based on a pre-feasibility study or feasibility study;

8. Numbers may not add due to rounding.

9. The Qualified Person for the La Romanera and La Infanta Mineral Resource Estimates is Dr. Phil Newall, BSc (ARSM), PhD (ACSM) , CEng,

FIMMM of WAI, a Qualified Person as defined by NI 43-101.

Resource Estimation Details and Methodology

Mineral Resource estimation was completed by Wardell Armstrong International Limited using drillhole

databases and geological models developed by the Emerita geology team and subsequently verified and

refined in collaboration with WAI. Software utilised included MX Deposit® (database & QAQC), Leapfrog Geo®

(geological model), Snowden Supervisor® (statistical & geostatistical analysis) and Leapfrog Edge®

(estimation).

The resource estimation methodology involved the following process:

• Database verification;

• Construction of wireframe models for massive sulphide lenses and weathering profile;

• Definition of resource domains;

• Data conditioning via compositing and top-cuts;

• Variography;

• Block modelling;

• Grade and density interpolation;

• Model validation and Resource classification; and

• Assessment of reasonable prospects for eventual economic extraction (RPEEE).

36 Lombard Street West, Floor 4, Toronto, ON, Canada, M5C 2X3

La Romanera and La Infanta are classified as volcanic-hosted massive sulphide (VHMS”) deposits and occur as

tabular strata-bound lenses of polymetallic (Zn, Pb, Cu, Ag, Au) massive sulphides. Drilling has so far defined

five sulphide lenses used as estimation domains in Resource modelling: The Upper and Lower Lens at La

Romanera and the North, South and South 1 Lenses at La Infanta. Input drillhole data was restricted to surface

diamond drilling completed by Emerita from 2022 to 2023.

Drillhole samples were flagged by domain, composited to regular lengths and top -cuts applied to isolated

outlier values. Variography was conducted on the composite data for each variable within each estimation

domain.

Grades were estimated into block models sub-celled to the estimation domain boundaries. Grade and density

estimation were conducted using ordinary kriging (OK) for most domains. Inverse Distance Squared (IDW2)

was carried out in the La Infanta South 1 domain, where the number of composites was insufficient for

effective variogram modelling. Hard boundaries were applied to constrain the interpolation . The estimates

were run in a three-pass plan, using progressively larger search neighbourhoods. Distance based top-cuts were

applied in higher estimation passes to limit grade extrapolation.

Estimated grades were validated globally, locally, and visually prior to classification. No material issues with

the grade interpolation were identified. Classification has been limited to contiguous regions where nominal

drill spacing is 50m or less for Indicated Resources and 100m or less for Inferred Resources.

Mining, processing and long-term price assumptions were used to evaluate the proportion of the block models

that could reasonably be expected to be economically mined. A 3.0% ZnEq cut -off was selected in line with

extraction via conventional underground mining methods. Thinner zones of mineralisation are present at La

Infanta and reporting was further restricted to exclude blocks below 3.0% ZnEq when diluted over a 3m

minimum mining width. The ZnEq calculation includes metallurgical recovery assumptions for eac h metal.

Initial metallurgical test work is commencing and WAI has used recoveries within the range of other Iberian

Pyrite Belt deposits and informed by review of petrographic studies. WAI cautions that changes in

metallurgical recovery and/or payability assumptions could significantly impact the MRE.

The Mineral Resource Estimate was supervised and reported by Dr. Phil Newall, BSc (ARSM), PhD (ACSM),

CEng, FIMMM, in accordance with definitions outlined in CIM Standards on Mineral Resources and Reserves,

Definitions and Guidelines (CIM, 2014). Dr. Newall is a Qualified Person as defined by NI 43-101 and undertook

site inspections in October 2022 and March 2023. The MRE will be supported by a NI 43 -101 independent

technical report which will be published and filed on the Company’s website and SEDAR profile within 45 days.

The NI 43-101 report will include detailed information on the key assumptions, parameters and methods used

to estimate the Mineral Resources.

IBW Geology and Mineralization

The 20km2 Iberian Belt West (IBW) property is located in the south of Spain, approximately 10km from the

national border with Portugal. It is part of the Iberian Pyrite Belt (IPB), a globally significant mineralized trend

constituting the world’s highest concentration of volcanic-hosted massive sulphide deposits (VHMS) spanning

east-west from Sevilla to Lisboa. Within the Project area there are several polymetallic (Cu -Zn-Pb-Au-Ag)

deposits, including Romanera, Infanta and El Cura, that have been exploited intermittently over the last 2,000

years.

36 Lombard Street West, Floor 4, Toronto, ON, Canada, M5C 2X3

The geology of the IBW claim block comprises a mixed sequence of extrusive and intrusive volcanic rocks,

volcaniclastic and marine sedimentary rocks that were folded and thrusted during the Variscan orogeny. The

massive sulphide lenses at Romanera and Infanta are localized within the volcaniclastics and sediments, near

to the contact with massive, felsic volcanics. The mineralized horizon is structurally repeated along the ~10km

length of IBW, defining several prospectiv e corridors that are the focus of current exploration within the

project areas.

At La Romanera, two steeply dipping massive sulphide lenses ranging between 2.0m and 32.0m in thickness

strike west-northwest over at least 700m as currently defined. Stratigraphy is tightly folded, overturned to

the south, and plunges gently to the west. Deep drilling is in progress to define the lower limits of these lenses,

following down-dip extensions and indications from down-hole geophyics.

At Infanta, over a kilometer of shallow ancient workings along the contact between felsic volcaniclastics and

tuffaceous shales define the mineralized horizon. These workings were confined to the hangingwall of a thrust

fault, within 20m of surface, whereas the reported resource is to the footwall of the thrust and extends as two

lenses to a depth of at least 350m below surface.

Romanera Mineralization

The 2023 Resource Estimate includes two lenses, showing a style of mineralization typical of VHMS deposits:

• Upper Lens. Massive to semi-massive sulphide mineralization.

• Lower Lens. Underlies the Upper Lens and consist s of massive to semi- massive sulphide

mineralization.

No stockwork-style mineralization is recognized in the deposit.

The Upper Lens massive sulphide is a continuous mineralized horizon which varies approximately from 2.0 to

32.0m in true thickness and averages 10.0m overall, with a strike length of 700m approximately.

The Lower Lens massive sulphide is a continuous mineralized horizon which varies approximately from 2.0 to

30.0m in true thickness and averages 13.0m overall, with a strike length of 720m.

The Upper Lens massive sulphide and the underlying Lower Lens are locally both separated and in contact with

one another throughout the Deposit. The Deposit dips at approximately 70 degrees from surface for a down-

dip length of approximately 675m (Upper Lens) and 720m (Lower Lens).

The Upper Lens occurs approximately 2.0 to 30.0 m in the hanging wall above the Lower Lens.

Infanta Mineralization

The 2023 Resource Estimate includes three blocks, showing a style of mineralization mainly typical of VHMS

deposits:

• North Block. Disseminated to massive sulphide mineralization.

• South Block. Underlies the North Block and consist s of disseminated to massive sulphide

mineralization.

• South Block 1. Underlies the South Block and consist s of disseminated to massive sulphide

mineralization.

36 Lombard Street West, Floor 4, Toronto, ON, Canada, M5C 2X3

No stockwork-style mineralization is recognized in the deposit.

The North Block massive sulphide is a continuous mineralized horizon which varies approximately from 1.0 to

10.0m in true thickness and averages 3.0 m overall, with a strike length of 1900m.

The South Block massive sulphide is a continuous mineralized horizon which varies approximately from 1.0 to

9.0 m in true thickness and averages 3.0 m overall, with a strike length of 1090 m approximately.

The South Block1 massive sulphide is a continuous mineralized horizon which varie s approximately from 1.0

m to 7.0 m in true thickness and averages 2.6m overall, with a strike length of 325 m approximately.

The North Block massive sulphide and the underlying South Block are generally separated throughout the

Deposit by about 30.0 m.

The South Block massive sulphide and the underlying South Block 1 are generally separated throughout the

Deposit by about 15.0m. The Deposit dips at approximately 70 degrees from surface for a down-dip length of

approximately 425 m (North Block), 190m (South Block) and 150m (South Block 1).

The South Block sits approximately 1 5.0m in the hanging wall above the South Block 1 in a structurally

controlled system. The North Block sits approximately 3 0.0m in the hanging wall above the South Block in a

structural controlled system.

IBW Project Mineral Resources are reported at a cut-off grade of 3.0% ZnEq in Table 1. The table below shows

the sensitivity of estimated grade and tonnage to the selection of cut- off grade. Sensitivity analysis across a

range of cut-off grades is only intended to provide additional context and should not be considered as Mineral

Resources.

36 Lombard Street West, Floor 4, Toronto, ON, Canada, M5C 2X3

Table 2: Resource Sensitivity to Cut-off Table

Cut-off Grade Indicated Inferred

ZnEq Tonnes ZnEq ZnEq

Metal Tonnes ZnEq ZnEq

Metal

% Mt % kt Mt % kt

0.5 15.88 7.03 1116 4.84 9.11 441

1.0 15.82 7.05 1116 4.84 9.11 441

1.5 15.70 7.10 1114 4.84 9.11 441

2.0 15.43 7.19 1109 4.83 9.12 441

2.5 15.01 7.33 1100 4.81 9.16 440

3.0 14.07 7.63 1074 4.71 9.29 438

3.5 13.19 7.92 1045 4.57 9.47 433

4.0 12.04 8.32 1002 4.36 9.75 425

4.5 10.74 8.81 947 4.17 10.00 417

5.0 9.79 9.21 902 4.03 10.18 410

5.5 8.71 9.70 845 3.86 10.41 401

6.0 7.85 10.13 795 3.68 10.63 391

Figure 1: Plan View La Romanera

36 Lombard Street West, Floor 4, Toronto, ON, Canada, M5C 2X3

Figure 2: Long section Upper Lens La Romanera

Figure 3: Long section Lower Lens La Romanera