TORONTO, Nov. 08, 2021 (GLOBE NEWSWIRE) -- Giyani Metals Corp. (TSXV:EMM, GR:A2DUU8) (" Giyani" or the

"Company"), developer of the K.Hill manganese oxide project (the “ K.Hill Project ”) in Botswana, is pleased to announce an

update on its operational and commercial activities.

Highlights

• Metallurgical testwork up to the stock solution stage completed and a specialist engineering firm engaged to undertake

the crystallisation testwork to finalise the process flowsheet for the feasibility study (“ FS”) on the K.Hill Project and

construction of the demonstration plant.

• 26 of the planned 56 reverse circulation (“ RC”) drill holes completed at the Otse manganese oxide prospect (“ Otse”).

Initial results show high grade mineralisation in multiple holes with intersections in excess of 60% manganese oxide

(“MnO”).

• Data and sample-sharing agreements signed with several major European original equipment manufacturers (“ OEMs”)

and cathode producers.

• Giyani welcomed into membership of the European Battery Alliance EBA250 network.

K.Hill Project Metallurgical Testwork

Optimised metallurgical test work and final process flowsheet design, as part of the FS on the K.Hill Project, has been

completed by Mintek in South Africa. This phase of the testwork does not include crystallisation. A specialist engineering firm

has been engaged to undertake crystallisation testwork with a view to finalising the process flowsheet for the FS and the

demonstration plant.

Once the process flowsheet is finalised, Giyani will proceed to contracting an engineering firm for the construction of the

demonstration plant. Following a peer review of the process flowsheet, it is anticipated that the design-build contract for the

demonstration plant will be signed with the objective for the plant to be operational in H1 2022.

Otse RC Drilling

Otse is the site of two historic mine workings, namely Otse North and Otse South. Giyani is conducting the first exploration

drilling at these sites with a planned 56-hole RC drilling campaign, following up on targets identified with an induced

polarization survey. To date, 26 RC holes have been completed at Otse South, proximate to historic mine workings and

defined by a chargeability anomaly trending northwest-southeast.

Nearly all holes drilled to date have shown visible mineralization, confirmed by portable x-ray fluorescence (“ pXRF”) analysis.

From the holes analysed so far, the best results include:

Hole ID Interval, From-To

Average

pXRF Grade Including:

RCOT21_006 29.5m – 36.5m 48% MnO 32.5 – 35.0m @ 58% MnO

RCOT21_015 18.0m – 35.5m 54% MnO 23.0 – 25.5m @ 65% MnO

A further 12 holes will be drilled at the southern target, before the two drill rigs move to Otse North, also proximate to the

historic workings. The campaign is expected to be completed in the next six weeks.

Otse is located approximately 40 kilometres east of the K.Hill Project and is connected by a well-maintained, sealed road

network. Any future production from Otse can easily be trucked to the location of the proposed process plant adjacent to the

K.Hill Project.

Giyani Commercial Activities

Giyani has been in discussions with a number of OEMs and other potential offtakers and trading groups as regards to potential

binding product purchase agreements. Giyani’s operations in Botswana have the potential to supply in excess of 100,000

tonnes of high purity manganese sulphate monohydrate (“HPMSM”) for the manufacture of lithium-ion battery cathodes

Currently, Giyani is engaging directly with a leading global automobile OEM on material evaluation, including the delivery of

representative samples. The Company has also signed a non-disclosure agreement with a major prospective European

producer of battery cathodes for further product information sharing.

The Company is also pleased to announce that it has been welcomed into membership of the EBA250, the industrial

development programme of the European Battery Alliance (“EBA”). The EBA was launched in 2017 to create a competitive and

sustainable battery cell manufacturing value chain in Europe.

Robin Birchall, CEO of the Company, commented:

“As we increase the size and quality of our resource, the metallurgical testwork by Mintek is now completed paving the way for

the finalization of the process flowsheet and the start of construction of the demonstration plant. The demonstration plant will

produce around 250 kilograms per day of final HPMSM product to share with potential customers for preliminary product

testing and we are already assembling interested parties.

While our flagship project is being de-risked, initial results from Otse appear to confirm our expectations for significant further

resource expansion, with some of the intersections offering truly spectacular grades. Otse is a different form of mineralization

to the K.Hill Project and will not have the same uniformity, but such high MnO content will provide options to high-grade plant

feed and blend lower quality material to increase average run-of-mine grade.

The fact that major OEMs and cathode manufacturers are engaging with us now to share data speaks to their recognition of

the quality of our projects and the critical nature of sustainable HPMSM supply. Currently, only a very small number of

companies outside of China produces HPMSM directly from ore and so Giyani will be a valuable and important source of

responsible, transparent and low carbon HPMSM. We are also delighted to be joining the EBA network and look forward to

playing an active part in the European critical supply chain.”

About Giyani

Giyani is a mineral resource company focused on becoming one of Africa’s first low-carbon producers of high-purity electrolytic

manganese precursor materials, used by battery manufacturers for the expanding electric vehicle market, through the

advancement of its manganese assets in the Kanye Basin in south-eastern Botswana (the “ Kanye Basin Prospects ”),

through its wholly-owned Botswana subsidiary Menzi Battery (Pty) Limited. The Company’s Kanye Basin Prospects consist of

10 prospecting licenses and include the past producing Kgwakgwe Hill mine and project, referred to as the K.Hill Project, the

Otse manganese prospect and the Lobatse manganese prospect, all of which have seen historical mining activities.

The Company is currently undertaking a feasibility study on the K.Hill Project, following an updated PEA announced on April

12, 2021 with a post-tax NPV of USD332 million and post-tax IRR of 80%, based on a current development plan to produce

around 0.89 Mt of high-purity manganese sulphate monohydrate over a 10 year project life. The PEA did not include any

production from the B Horizon, the K.Hill Extension or the Otse or Lobatse prospects.

Additional information and corporate documents may be found on www.sedar.com and on Giyani Metals Corp. website at

https://giyanimetals.com/ .

Qualified Persons / NI 43-101 Disclosures

Mr. Luhann Theron, MSc., Pr.Sci.Nat. 400184/15, of Lambda Tau is registered with the SACNASP. Mr. Theron is currently at

site and is a qualified person, as defined by National Instrument 43-101. Mr. Theron is the Chief Geologist for the Company

and has reviewed and approved the scientific and technical content contained in this press release but is not independent for

the purposes of NI 43-101.

About Lambda Tau

Lambda Tau Botswana is a locally based geological services and exploration consulting services provider, offering services

across Southern Africa. For more information visit https://www.lambdatau.co.za .

On behalf of the Board of Directors of Giyani Metals Corp.

Robin Birchall, CEO

Contact:

Robin Birchall CEO, Director

+44 7711 313019

[email protected]

George Donne

VP Business Development

+44 7866 591 897

[email protected]

Judith Webster

Corporate Secretary and Investor Relations

+1 416 453 8818

[email protected]

Neither the TSX Venture Exchange (the "TSXV") nor its Regulation Services Provider (as that term is defined in the policies of

the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

The securities described herein have not been registered under the United States Securities Act of 1933, as amended (the

"U.S. Securities Act"), or any state securities laws, and accordingly, may not be offered or sold to, or for the account or

benefit of, persons in the United States or "U.S. persons," as such term is defined in Regulation S promulgated under the

U.S. Securities Act ("U.S. Persons"), except in compliance with the registration requirements of the U.S. Securities Act and

applicable state securities requirements or pursuant to exemptions therefrom. This press release does not constitute an offer

to sell or a solicitation of an offer to buy any of the Company's securities to, or for the account of benefit of, persons in the

United States or U.S. Persons.

Forward Looking Information

This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. All

statements in this news release, other than statements of historical fact, that address events or developments that Giyani

expects to occur, are "forward-looking statements". Forward-looking statements are statements that are not historical facts

and are generally, but not always, identified by the words "expects", "does not expect", "plans", "anticipates", "does not

anticipate", "believes", "intends", "estimates", "projects", "potential", "scheduled", "forecast", "budget" and similar

expressions, or that events or conditions "will", "would", "may", "could", "should" or "might" occur. Specific forward-looking

statements and forward-looking information herein includes completion of receipt of TSXV approval for the private placement

and completion of the private placement.

All such forward-looking statements are based on the opinions and estimates of the relevant management as of the date such

statements are made and are subject to certain assumptions, important risk factors and uncertainties, many of which are

beyond Giyani's ability to control or predict. Forward-looking statements are necessarily based on estimates and assumptions

that are inherently subject to known and unknown risks, uncertainties and other factors that may cause actual results, level of

activity, performance or achievements to be materially different from those expressed or implied by such forward-looking

statements. In the case of Giyani, these facts include their anticipated operations in future periods, planned exploration and

development of its properties, and plans related to its business and other matters that may occur in the future. This information

relates to analyses and other information that is based on expectations of future performance and planned work programs.

Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors which could

cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without

limitation: inherent exploration hazards and risks; risks related to exploration and development of natural resource properties;

uncertainty in Giyani's ability to obtain funding; commodity price fluctuations; recent market events and conditions; risks

related to the uncertainty of mineral resource calculations and the inclusion of inferred mineral resources in economic

estimation; risks in how the world-wide economic and social impact of COVID-19 is managed; risks related to governmental

regulations; risks related to obtaining necessary licenses and permits; risks related to their business being subject to

environmental laws and regulations; risks related to their mineral properties being subject to prior unregistered agreements,

transfers, or claims and other defects in title; risks relating to competition from larger companies with greater financial and

technical resources; risks relating to the inability to meet financial obligations under agreements to which they are a party;

ability to recruit and retain qualified personnel; and risks related to their directors and officers becoming associated with other

natural resource companies which may give rise to conflicts of interests. This list is not exhaustive of the factors that may

affect Giyani's forward-looking information. Should one or more of these risks and uncertainties materialize, or should

underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking

information or statements.

Giyani's forward-looking information is based on the reasonable beliefs, expectations and opinions of their respective

management on the date the statements are made, and Giyani does not assume any obligation to update forward looking

information if circumstances or management's beliefs, expectations or opinions change, except as required by law. For the

reasons set forth above, investors should not place undue reliance on forward-looking information. For a complete discussion

with respect to Giyani and risks associated with forward-looking information and forward-looking statements, please refer to

Giyani's Annual Information Form, all of which are filed on SEDAR at www.sedar.com.

”