OAKVILLE, ONTARIO – July 05, 2018 – Giyani Metals Corporation (TSXV:WDG, GR:

A2DUU8) (“Giyani” or the “Company”) is pleased to provide initial drilling results from Phase 1

of its 2018 operational program and an update on the work progress of resource estimation and

hydrometallurgical testing of the Company’s manganese prospects in Botswana.

Highlights

 Initial assay results of drill core samples from K.Hill

 Drilling campaign update

 Consulting firm MSA site audit and initial QA/QC

 Hydrometallurgical testing

 Sale of mineralized material

Robin Birchall, CEO of Giyani Metals Corp. commented:

“I note the success that we have had with the drill bit over the past 10 weeks. It is starting to

appear that we should be able to achieve the necessary grade for this material to suit our planned

hydrometallurgical process. In particular, I would note that we are one of very few companies

with the style and type of manganese deposit, which is amenable to the BEV metal market. I

would like to commend our operational team in Botswana for keeping the program under budget

and on time. Our experience in operating in Botswana has been very positive and we hope to

continue to make fast progress with the support of the Botswana government. We look forward to

updating the market with our maiden resource in the near future.”

Initial assay results of drill core samples from K.Hill

Geochemical results of the samples collected from the first holes drilled at K.Hill have been

received. Table 1 below shows some results from 7 holes; DDKH18_0001, -0004, -0007, -0010, -

0011, -0012, and -0014. Only the oxides of interest, MnO, Fe 2O3 and the deleterious element

P2O5 are listed here due to their significance in the formulation of battery grade p roducts. It is

expected that a grade of 30% MnO will result in favourable hydrometallurgical test result.

Hole ID From (m) To (m) Thickness (m) Fe2O3 (%) MnO (%) P2O5 (%)

DHK18_001 6 10 4 18.54 40.09 0.156

including 6 8 2 16.9 42.3 0.316

DHK18_004 5.73 8 2.27 19.22 35.91 0.412

including 6.5 7.5 1 19.4 41.4 0.444

and 15 19 4 18.73 31.93 0.414

including 16 17 1 17.2 48.8 0.49

DHK18_007 25 29 4 13.9 40.15 0.147

including 28.07 29 0.93 13 57.9 0.17

DHK18_0010 11.73 14 2.27 20.74 31.82 0.16

DHK18_0011 21 23 2 21.3 36.9 0.308

DHK18_0012 17.73 19.5 1.77 22.02 34.45 0.218

DHK18_0014 15 19 4 17.19 31.44 0.154

Table 1: Highlights of higher-grade intersections.

The geochemical results from the first drill holes confirm the thickness of the manganiferous

shale horizon at K.Hill. The representative sampling from the K.Hill drill cores provides Giyani

with a true vertical section of the mineralized horizon. A preliminary cross section can be drawn

using the logging data, highlighting the orientation and thickness of the mineralized horizon. See

Figure 1 below.

Figure 1: Cross section through holes DDKH18_0001, -0002, -0003, and -0004, using the logging

data. Note hole two ended in a void and could not be completed

Drilling campaign update

Drilling at the Otse Prospect was completed recently with four holes drilled in the southern block

and three in the northern block. As the actual metres drilled at both K.Hill and Otse amounted to

less than the total meterage planned for those two Prospects, Giyani is in a position to allocate the

remaining drill metres to its third Prospect, Lobatse, which was not originally included in Phase

1. This exploration drilling will improve the Company’s understanding of the geology and the

type of manganese mineralization at Lobatse. Drilling at Lobatse commenced recently with three

holes planned for up to 425 meters in total. The holes will be drilled at a 60-degree angle to

attempt to intersect the dipping mineralization at a 90-degree angle.

Consulting firm MSA site audit and initial QA/QC

MSA conducted a site visit on the 7th and 8th of June 2018. The purpose of the visit was to

inspect the field and data capturing procedures and ensure that it is in line with industry best

practices. During this audit, MSA visited the completed drill hole sites , core lo gging and

sampling sheds, and inspected the sampled cores. Field procedures and techniques were found to

be in line with industry best practices . Once all geochemical results are received, Giyani will

deliver all the required data to MSA for the volumetric analysis, 3D modelling and estimation of

a resource.

Hydrometallurgical testing

Hydrometallurgical testing of four samples from K.Hill and one from Otse commenced in early

June and is expected to take approximately two months to conclude. The purpose of this test work

is to determine the appropriate leaching methods, recoveries, residence times and to identify the

dissolved metals. This is the first step of defining an eventual hydrometallurgical process that will

be composed of leaching and purification with additional steps to produce the final battery grade

manganese products. This information will be used to design and build a small pilot circuit that

will, in turn, supply small -scale production for battery assessmen t tests and generate engineering

and operational data for a full-scale plant.

Sale of mineralized material

The Company has been approached by, and is in discussions with , a number of market traders

and end users of high grade manganese material for the steel market. While the sale of raw

manganese material is not the Company’s long term goal, as it continues to focus on the BEV

market, t he Company is currently exploring options to exploit the stockpile and other surface

material that it has been able to identify within its licence areas. In addition , this material is

currently being surveyed to determine its volume, and tested to establish exact specifications

prior to discussing pricing terms with potential purchasers of the material. The Company will

continue to update the market as these discussions progress , including the necessary engagement

with the government.

Quality control and assurance

Drill core was sawn in half and one half was sampled and placed in a plastic bag along with a

sample tag. Bags were sealed with a single use tie. Samples were securely stored prior to shipping

to SGS laboratories in Randfontein, Johannesburg, South Africa. Samples were crushed and

milled prior to analysis by bo rate fusion and XRF. The Company routinely submits standards,

duplicates and blanks with sample batches to monitor the quality of the assays.

Roger Moss, Ph.D., P.Geo, is the qualified person, as that term is defined by National Instrument

43-101, on behalf of the Company and has approved the scientific and technical content

contained in this press release.

About Giyani

Giyani Metals Corp. is a Canadian based junior exploration company focused on creating

shareholder value by accelerating the development of its high-grade manganese project in the

Kanye Basin, Botswana, Africa.

Additional information and corporate documents may be found on www.sedar.com and on Giyani

Metals Corp. website: http://giyanimetals.com/.

On behalf of the Board of Directors of Giyani Metals Corp.

Robin Birchall, CEO

Contact:

Giyani Metals Corporation

Robin Birchall

CEO, Director

+447711313019

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news

release.

Forward-Looking Statements

This news release may contain forward-looking statements including but not limited to comments regarding the timing and

content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes,

the financial picture of the Company etc. Forward-looking statements address future events and conditions and therefore, involve

inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statement.

GIYANI METALS CORP.

277 LAKESHORE ROAD EAST, OAKVILLE, Ontario L6J 1H9

T:289-837-0066 F: 289-837-1166

www.GIYANIMETALS.com TSX.V-WDG