Nevada Silver Commences First Exploration IN More Than 100 Years at the Historic Belmont Silver CAMP, Nevada, USA
DDR 77
DDR 78
DDR 79
DDR 80
DDR 81
DDR 82
DDR 83
DDR 84
DDR 85
DDR 86
DDR 87
DDR 88
DDR 65
DDR 66
DDR 67
DDR 68
DDR 69
DDR 70
DDR 71
DDR 72
DDR 73
DDR 74
DDR 75
DDR 76
DDR 53
DDR 54
DDR 55
DDR 56
DDR 57
DDR 58
DDR 59
DDR 60
DDR 61
DDR 62
DDR 63
DDR 64
DDR 41
DDR 42
DDR 43
DDR 44
DDR 45
DDR 46
DDR 47
DDR 48
DDR 49
DDR 50
DDR 51
DDR 52
DDR 29
DDR 30
DDR 31
DDR 32
DDR 33
DDR 34
DDR 35
DDR 36
DDR 37
DDR 38
DDR 39
DDR 40
DDR 20
DDR 21
DDR 22
DDR 23
DDR 24
DDR 25
DDR 26
DDR 27
DDR 28
DDR 13
DDR 14
DDR 15
DDR 16
DDR 17
DDR 18
DDR 19
DDR 1
DDR 2
DDR 3
DDR 4
DDR 5
DDR 6
DDR 7
DDR 8
DDR 9
DDR 10
DDR 11
DDR 12
DDR 119
DDR 120
DDR 121
DDR 122
DDR 123
DDR 124
DDR 111
DDR 112
DDR 113
DDR 114
DDR 115
DDR 116
DDR 117
DDR 118
DDR 103
DDR 104
DDR 105
DDR 106
DDR 107
DDR 108
DDR 109
DDR 110
DDR 95
DDR 96
DDR 97
DDR 98
DDR 99
DDR 100
DDR 101
DDR 102
DDR 89
DDR 90
DDR 91
DDR 92
DDR 93
DDR 94
2220 2321
16 15 14
19
17
24 1924
20
32
15
03
06
15
22
21
10
32
09
25
07
22
29
10
04
09
18
32
13
09
22
04
18
22
17
05
36
16
14
17
02
09
16
3233
34
17
10
03
01
11
18
34
02
13
26
25
32
35
30
19
02
12
16
05
05
11
33
05
21
06
03
33
04
11
15
35
34
24
20
17
15
10
32
12
33
06
20
05
07
26
14
19
16
34
04
28
08
17
03
36
01
08
04
31
02
31
11
12
29
24
27
23
29
16
09
03
3026
34
05
08
08
13
20
09
08
08
10
28
28
23
04
21
10
27
07
33
34
03
27
15 14
31
29
01
35
33
21
28 27
35 36
30
11
36
07
01
07
36
36
02
24
02
11
30
31
07
31
23
35
35
31
18
26
23
06
12
14
01
24
06
19
13
25
12
25
01
14
18
18
19
13
12
06
13
8N
45E
8N
46E
8N 45E
9N 45E
8N
46E
8N
47E
8N 46E
9N 46E
8N 47E
9N 47E
10N 45E
10N 46E
10N 45E
11N 45E
10N 45E
9N 45E
11N 46E
10N 46E
11N 46E
11N 45E
11
N 46E
11
N 47E
10N 46E
9N 46E
10
N 46E
10
N 47E
9N
46E
9N
45E
9N
46E
9N
47E
9N 47E
10N 47E
AR254
AR283
AR284
AR286
AR285
AR287
AR307
AR306
AR309
AR308
AR295
AR298
AR328
AR226AR212 AR132
AR109AR99 AR133
AR110AR100 AR134
AR101 AR135
AR112AR102 AR136
AR113AR103
AR330
AR137
AR114AR104 AR138
AR115AR105 AR139
AR116AR106 AR140
AR117AR107 AR141
AR118AR108 AR142
AR119AR213
AR144
AR121
AR143
AR120AR214
AR215
AR122AR216
AR201
AR86
AR87AR194
AR88AR195
AR89AR196
AR90AR71
AR91AR72
AR92AR73
AR93AR74
AR94AR75
AR95
AR96
AR97
AR98
AR202
AR183
AR184
AR185
AR188
AR179
AR217
AR218
AR219
AR203
AR204
AR205
AR277
AR267
AR279
AR266
AR278
AR269
AR281
AR268
AR280
AR271
AR270
AR282 AR293
AR292
AR255
AR256
AR288
AR290
AR289
AR291
AR321
AR311
AR310
AR322
AR313
AR111
AR319
AR320
AR317
AR 036aAR 036b
AR
037
AR 038
AR 028
AR 029
AR
030AR 031
AR 21
AR 22
AR 23
AR 24
AR 27
AR 32
AR 33
AR 35
AR 39
AR 40
AR 42
AR 43AR 44
AR 45
AR 46
AR 47
AR 50
AR 51
AR 52
AR 53
AR 54
AR 55
AR 152
AR 153
AR 154
AR 155
AR 156
AR 157
AR 158
AR 159
AR 160
AR 161
AR 162
AR 163
AR 164
AR 165
AR 166
AR 167
AR 168
AR 169
AR 1
AR 2
AR 3
AR 4
AR 5
AR 6
AR 7
AR 170
AR 171
AR 8
AR 9
AR 10
AR 11
AR 12
AR 13
AR 14
AR 15
AR 172
AR 173
AR 174
AR 16
AR 17
AR 18
AR 19
AR 25
AR 175
AR 176
AR 26
AR 34
AR 177 AR 178
AR 41
AR 181
AR 48
AR 49
AR 56
AR 57
AR 58
AR 59
AR 182
AR 61
AR 62
AR 63
AR 64
AR 65
AR 68
AR 69
AR 70
AR 188
AR 76
AR 77
AR78
AR 79
AR 80
AR 81AR 66
AR 67 AR 82
AR 83
AR 84
AR 85
CX
-41
CX
-40
CX
-39
CX
-38
CX
-37
CX
-36
CX
-13
CX
-11
CO
RE
9
CO
RE
7
CO
RE
5
CO
RE
3
CX
-1
CX
-14
CX
-12
CO
RE
10
CO
RE
8
CO
RE
6
CO
RE
4
CX
-2
CX
-15
CX
-16
CX
-17
CX
-18
CX
-19
CX
-20
CX
-21
AR 20
AR263
AR275
AR262
AR274
AR265
AR264
AR276
AR251
AR252
AR 200
AR 199
AR 191
AR 198
AR 190
AR 197
AR 189
AR273
AR272
AR342
AR343
AR344
AR180
AR345 AR356
AR220
AR221
AR222
AR223
AR224
AR206
AR208
AR209
AR210
AR211
AR123
AR327
AR354
AR367
AR186
AR187
AR207
AR250 AR261
AR253
AR296
AR294 AR305 AR316
AR297
AR299
AR300
AR303
AR304
AR301
AR302
AR323
AR335
AR334
AR355
AR324 AR357 AR368
AR332
AR333
AR315
AR314
AR346
AR340
AR341
AR338
AR339
AR225
AR312
Copyright:© 2013 National Geographic Society, i-cubed
Coordinate System: WGS 1984 UTM Zone 11N
Projection: Transverse Mercator
Datum: WGS 1984
False Easting: 500,000.0000
False Northing: 0.0000
Central Meridian: -117.0000
Scale Factor: 0.9996
Latitude Of Origin: 0.0000
Units: Meter
1 in = 2,500 ftDate: 9/9/2021
Nevada Silver Corporation
Corcoran & Belmont Silver Project Overview
0 0.75 1.5 2.25 30.375
Miles
Nye County, Nevada
Legend
CORCORAN CANYON
BELMONT
PLSS Township
PLSS Section
Corcoran Silver Project
North Belmont Silver Project
Belmont Silver Project
u Belmont
Not for distribution to United States newswire services or for dissemination in the United States
NEVADA SILVER COMMENCES FIRST EXPLORATION IN MORE THAN 100
YEARS AT THE HISTORIC BELMONT SILVER CAMP, NEVADA, USA
Toronto, Ontario, 28th April 2022: Nevada Silver Corporation (“NSC” or the “Company”) (TSXV: NSC) (OTCQB:
NVDSF) is pleased to provide an update on exploration activities at the Company’s 100%-owned Belmont
Silver project in Nevada, USA.
NSC controls patented and unpatented claims covering numerous historic silver mines located near the town
of Belmont, 15 kilometers southwest of the Company’s Corcoran Silver Project and 80 kilometers northeast
of Tonopah in central Nevada (Figure 1). NSC’s Belmont Silver Project (BSP) and North Belmont Silver Project
(NBSP) include the majority of old silver mine workings of the Belmont Silver Camp (BSC) peripheral to the
historic Belmont ‘ghost’ town. During peak activity between 1865 and 1889 the BSC dominated Nye County’s
silver production before declining silver prices and increasing costs of dewatering forced most to close.
Figure 1. Location map of the Belmont Silver, North Belmont Silver and Corcoran Silver Projects.
Belmont is among the earliest and richest silver mining camps in the Tonapah district and had an estimated
average silver ore head grade of 25 ounces per ton of silver. Historical accounts describe numerous prospect
pits and mine openings of shallow underground workings with the richest ore above the water table where
silver occurred mostly as silver chloride (cerargyrite).
Silver-bearing sulphides together with copper, molybdenum, lead, zinc, and antimony minerals are present at
depth. High-grade mineralization was reported adjacent to hanging walls of massive quartz veins and was
generally conformable with strata of Ordovician shale, quartzite and limestone.
There has been negligible exploration at Belmont in recent decades, despite high-grade silver samples (up to
0.5% silver) collected from remnant mine dumps during a geochemical study of the Belmont silver district by
the US Geological Survey in 1985 (Nash et al, 1985).
The Nevada Silver 2022 Program
Geology surface mapping of the BSP has commenced and this study will be the first detailed structural and
lithological charting of the Belmont Silver Camp. Gearld (Jerry) Willis, an experienced consulting geologist,
widely known for his meticulous mapping and comprehensive appraisals of silver deposit geology, has
commenced field work.
An Induced Polarization (IP/Resistivity) geophysical survey has been designed to cover the main area of
shallow mine workings and adjacent ground at the BSP. Rock Bottom Geosciences LLC (a subsidiary of
Planetary Geophysics Pty Ltd) has commenced the study. The arranged series of pole/dipole traverses will
provide important details of sulphide accumulations and the study is expected to delineate prospective
targets beneath and peripheral to the old workings.
Figure 3. Mineralized boulders on dumps near old mine workings at the Belmont Silver Project.
Left: weathered limonitic sulphide rock. Right: quartz breccia veining with mineralized host rock fragments.
Figure 2. Belmont project area view looking NE. Main
workings are located outside and to the left of the photo.
A shallow prospector’s shaft (right).
NSC has secured Falcon Drilling Inc. to undertake drill testing of prioritized silver-sulphide targets defined by
the mapping and geophysical surveys as well as detailed in the accounts of past mining activities. Targets will
include near-surface, silver-quartz veins and shallow sulphide anomalies which were not identified by early
miners because of poor outcrop and widespread overburden. Drilling is expected to commence in May.
Qualified Person
The scientific and technical data contained in this news rele ase was reviewed and approved by Ian
James Pringle PhD, who is a Qualified Person under National Instrument 43 -101 Standards of
Disclosure for Mineral Projects.
About Nevada Silver Corporation
Nevada Silver Corporation ( TSXV: NSC) (OTCQB: NVDSF) is a multi-commodity exploration and
development company with two US -based exploration projects with NI 43 -101 compliant mineral
resources and an experienced, multidisciplinary technical team and board. The Company’s principal
asset is the Corcoran Silver Proje ct in Nevada, which has mineralization near -surface, is open in all
directions, and has an Inferred Mineral Resource of 33.5 million silver -equivalent ounces 1 . The
Corcoran Silver Project has a number of high-priority exploration targets that provide excellent growth
potential. In February 2022, NSC announced that it had acquired the historic Belmont Silver Project,
which was among the earliest and richest silver mining camps in the Tonapah district, with an
estimated ore head-grade averaging 25 ounces per ton of silver. In addition to Corcoran and Belmont,
NSC has exclusive ownership and management rights over the Emily Manganese Project in Minnesota,
USA. The Emily Project contains North America’s highest-grade manganese resource and has been the
subject of considerable technical studies, with USD$24 million invested to date.
For further information please contact:
Nevada Silver Corporation CHF Capital Markets
Gary Lewis Perry Rapagna
Group CEO & Director Manager, Corporate Development
T: +1 (416) 941 8900 T: +1 (416) 868 1079 ext. 230
[email protected] [email protected]
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Information
This news release contains “forward -looking information” and “forward -looking statements” (collectively,
“forward-looking information”) within the meaning of applicable securities laws. Forward-looking information is
generally identifiable by use of the wo rds “believes,” “may,” “plans,” “will,” “anticipates,” “intends,” “could”,
“estimates”, “expects”, “forecasts”, “projects” and similar expressions, and the negative of such expressions.
Forward-looking information is subject to known and unknown risks, un certainties and other factors that may
cause the Company’s actual results, level of activity, performance or achievements to be materially different
from those expressed or implied by such forward -looking information, including, without limitation, risks a s a
result of the Company having a limited operating history and may have a wide variance from actual results, risks
concerning the ability to raise additional equity or debt capital to continue its business, uncertainty regarding
the inclusion of inferred mineral resources in the mineral resource estimate which are too speculative
geologically to be classified as mineral reserves, uncertainty regarding the ability to convert any part of the
mineral resource into mineral reserves, uncertainty involving resource estimates and the ability to extract those
resources economically, or at all, uncertainty involving exploration (including drilling) programs and the
Company’s ability to expand and upgrade existing resource estimates, risks involved in any future reg ulatory
processes and actions, risks from making a production decision (if any) without any feasibility study completed
on the Company’s properties, risks applicable to mining exploration, development and/or operations generally,
1 NI 43-101 Resource report on the Corcoran Canyon Project by Mosher and Smith (October, 2020).
and risk as a result of the Company being subject to certain covenants with respect to its activities by creditors,
as well as other risks.
Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of
management made in light of its exper ience and perception of trends, current conditions and expected
developments, and other factors that management believes are relevant and reasonable in the circumstances at
the date such statements are made. Although the Company has attempted to identify i mportant factors that
could cause actual results to differ materially from those contained in forward -looking information, there may
be other factors that cause results not to be as anticipated. There can be no assurance that such information will
prove to be accurate, as actual results and future events could differ materially from those anticipated in such
information. Accordingly, readers should not place undue reliance on forward-looking information.
All forward-looking information herein is qualified in its entirety by this cautionary statement, and the Company
disclaims any obligation to revise or update any such forward -looking information or to publicly announce the
result of any revisions to any of the forward-looking information contained herein to reflect future results, events
or developments, except as required by law.