Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EML.V ·

Metallurgical Tests Yield High-Purity Manganese Sulfate Monohydrate from the Emily Manganese Deposit, Minnesota Leach Extractions of 95% or Higher Were Achieved

Metallurgy & Processing

Metallurgical Tests Yield High-Purity Manganese Sulfate

Monohydrate from the Emily Manganese Deposit,

Minnesota

Leach Extractions of 95% or Higher Were Achieved

TORONTO, ON / ACCESSWIRE / September 24, 2024 / Electric Metals (USA) Limited

("EML" or the "Company") (TSXV:EML)(OTCQB:EMUSF) is pleased to announce the

successful results of metallurgical testing on the Emily manganese deposit, located in Minnesota,

United States. Kemetco Research Inc. conducted the testing program, successfully demonstrating

the capability of producing high-purity manganese sulfate monohydrate (HPMSM) from

manganese samples recovered from the 2023 drill program at the Emily manganese deposit.

These results represent a key development milestone in the ongoing evaluation and advancement

of the Emily manganese project, the highest-grade manganese deposit in North America.

Highlights of Metallurgical Test Work

• High-purity Manganese Sulfate Monohydrate (HPMSM) Production: The program

confirmed the potential for producing HPMSM aimed for the lithium-ion battery market

from composite samples sourced from the Emily manganese deposit.

• Manganese Extraction: Leaching tests using sulfuric acid (H2SO4) in combination with

a reducing agent, the optimization of sulfur dioxide (SO2) ratios and finer grinding

improved recovery rates, achieving manganese extraction rates exceeding 95%.

• Impurity Removal and Crystallization: The test work demonstrated the effective

removal of impurities, including iron, potassium, and other trace elements, through

multiple purification stages. Crystallization tests yielded HPMSM aimed for the battery-

materials market. The HPMSM met international specification standards used by Chinese

producers (Fastmarkets 2022).

• Potential for Optimization and Scale-Up: The results from this test work provide a

strong foundation for the future development of a full-scale processing plant. The next

phase will focus on flowsheet development and further process optimization to advance

towards a Scoping Study / Preliminary Economic Assessment and Pre-Feasibility Study.

The current metallurgical test program, along with earlier metallurgical tests conducted by

Kemetco, confirmed the potential for producing a full suite of manganese products, including

High-purity Manganese Sulfate Monohydrate (HPMSM), Electrolytic Manganese Metal (EMM),

Electrolytic Manganese Dioxide (EMD / MnO2), and other high-purity manganese chemicals

from Emily feedstocks.

Brian Savage, CEO, commented: "Our team was optimistic about achieving these positive results,

and now receiving validation from a third party strengthens our confidence in the project and

provides reassurance to all stakeholders. The high manganese recovery rates and the quality of

the manganese sulfate produced demonstrate the immense potential of the Emily Project to

become a domestic supplier of high-purity manganese sulfate for the clean energy transition and

a more sustainable energy future. This accomplishment opens the door for future project

expansions, such as scaling up and conducting thorough economic evaluations."

Emily Deposit Metallurgical Testing Program

The metallurgical test work was carried out by Kemetco Research Inc.'s Richmond, British

Columbia laboratory, which has expertise in manganese processing. The program aimed to

evaluate the leach amenability and potential for producing high-purity manganese sulfate using

composite samples from the Emily deposit. The primary focus was bench-scale testing of various

unit operations, including leaching, solution purification, and manganese sulfate crystallization.

Samples for the test work taken from the 2023 drilling program conducted at the Emily

manganese deposit. High-grade (37.0% Manganese) and medium-grade (15.57% Manganese)

composite core samples were selected and shipped to Kemetco's laboratory.

The Kemetco testing program consisted of the following activities:

• Characterize the samples collected during the drilling program and produce several

composites for metallurgical testing,

• Conduct scoping mineral processing testing to reject gangue and upgrade the run-of-mine

ores,

• Conduct bench scale leach test to extract the manganese to evaluate the amenability of

the Emily material to sulfuric acid leaching and evaluate the impact of various conditions

on the manganese and iron extraction,

• Conduct scoping impurity removal testing, and characterize the purified manganese

pregnant solutions, and

• Conduct scoping crystallization testing using purified manganese pregnant solutions to

evaluate the main impurities affecting the generation of HPMSM, including the

production of HPMSM.

The final report from Kemetco on the metallurgical testing, including a conceptual flow sheet, is

expected within the next few weeks.

The Importance of Domestic High-Purity Manganese Sulfate Monohydrate (HPMSM)

Production

HPMSM is a critical material used in the manufacturing of lithium-ion batteries, particularly in

the electric vehicle market and renewable energy storage systems. CPM Group, a leading

commodity research firm, predicts that by 2032, the supply of high-purity manganese sulfate will

enter a significant deficit, with North American HPMSM demand forecast to be more than

800,000 tonnes per year.

U.S. and Canadian production of HPMSM and other high-purity manganese chemicals on a

commercial scale is negligible, and both the U.S. and Canada rely on imports of high-purity

manganese chemicals. Currently, China produces 96% of global High-purity Manganese Sulfate

Monohydrate (HPMSM) and 98% of global High-purity Electrolytic Manganese Metal

(HPEMM).

Qualified Persons

The scientific and technicaldata contained in this news release was reviewed and approved by

Norman Chow, Professional Engineer and President of Kemetco Research, who is a Qualified

Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About Kemetco Research Inc.

Kemetco Research Inc. is a privately-owned contract research and development company

specializing in providing laboratory services to the mining, energy, and chemical sectors. Their

expertise includes a wide range of metallurgical testing and process development, with a strong

focus on sustainability and innovation.

About Electric Metals (USA) Limited

Electric Metals (USA) Limited (TSXV:EML)(OTCQB:EMUSF) is a US-based mineral

development company with manganese and silver projects geared to supporting the transition to

clean energy. The Company's principal asset is the Emily Manganese Project in Minnesota, the

highest-grade manganese deposit in North America, which has been the subject of considerable

technical studies, including National Instrument 43-101 Technical Reports - Resource Estimates.

The Company's mission in Minnesota is to become a domestic US producer of high-value, high-

purity manganese metal and chemical products to supply the North American electric vehicle

battery, technology and industrial markets. With manganese playing a critical and prominent role

in lithium-ion battery formulations, and with no current domestic supply or active mines for

manganese in North America, the development of the Emily Manganese Project represents a

significant opportunity for America, the State of Minnesota and for the Company's shareholders.

For further information, please contact:

Electric Metals (USA) Limited

Brian Savage

CEO & Director

(303) 656-9197

or

Valerie Kimball

Director Investor Relations

720-933-1150

[email protected]

Forward-Looking Information

This news release contains "forward-looking information" and "forward-looking statements"

(collectively, "forward-looking information") within the meaning of applicable securities laws.

Forward-looking information is generally identifiable by use of the words "believes," "may,"

"plans," "will," "anticipates," "intends," "could", "estimates", "expects", "forecasts", "projects"

and similar expressions, and the negative of such expressions.

Such statements in this news release include, without limitation: the ability to produce HPMSM

aimed for the lithium-ion battery market and other high-grade manganese products from the

Emily manganese deposit; the ability to conduct a scoping study, Preliminary Economic

Assessment and Pre-Feasibility Study to evaluate the overall feasibility and design parameters;

the development of a processing plant; the ability to complete other metallurgical test work, and

planned or potential developments in ongoing work by Electric Metals.

These statements address future events and conditions and so involve inherent risks,

uncertainties and other factors that could cause actual events or results to differ materially from

estimated or anticipated events or results implied or expressed in such forward-looking

statements. Such risks include, but are not limited to, the failure to obtain all necessary stock

exchange and regulatory approvals. Forward-looking information is based on the reasonable

assumptions, estimates, analysis and opinions of management made in light of its experience and

perception of trends, updated conditions and expected developments, and other factors that

management believes are relevant and reasonable in the circumstances at the date such

statements are made. Although the Company has attempted to identify important factors that

could cause actual results to differ materially from those contained in forward-looking

information, there may be other factors that cause results not to be as anticipated. There can be

no assurance that such information will prove to be accurate, as actual results and future events

could differ materially from those anticipated in such information. Accordingly, readers should

not place undue reliance on forward-looking information.

All forward-looking information herein is qualified in its entirety by this cautionary statement,

and the Company disclaims any obligation to revise or update any such forward-looking

information or to publicly announce the result of any revisions to any of the forward-looking

information contained herein to reflect future results, events, or developments, except as required

by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

SOURCE: Electric Metals (USA) Limited