Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EML.V ·

Electric Metals Advances the Emily Manganese Project in Minnesota with High Recovery Underground Mining Approach

Corporate Updates

Electric Metals Advances the Emily Manganese Project in Minnesota with

High Recovery Underground Mining Approach

TORONTO, ONTARIO, February 27, 2025: Electric Metals (USA) Limited ("EML" or the "Company")

(TSXV:EML) (OTCQB:EMUSF) is proud to announce positive interim results in its Preliminary

Economic Assessment (PEA) for the Emily Manganese Project in Minnesota. The PEA is a pivotal

step in securing a domestic supply of high-purity manganese vital for the United States’ national

security, energy infrastructure, and the electrification of everything. The PEA is being conducted

by Forte Dynamics, Inc. (Forte), a United States-based mining and engineering consulting firm, in

accordance with US and Canadian securities requirements1.

Preliminary Highlights

• Underhand Cut-and-Fill underground mining method selected

• 88% extraction of the estimated resources

• 89% recovery of the contained manganese

In May 2024, Electric Metals announced that Forte had completed a n NI 43 -101 compliant

Mineral Resource Estimate for its Emily Manganese Project in Minnesota (Table 1), confirming it

as the highest-grade manganese resource in North America (April 9, 2024).

Table 1: Emily Classified Mineral Resource Estimate (k metric tonnes)2

1 United States Securities and Exchange Commission S-K 1300 and Canadian National Instrument 43-101.

2 Notes associated with Table 1 were reported in the April 9, 2024 Electric Metals (USA) Limited press

release.

2

Drill core samples from both potential ore and waste zones were sent to R ESPEC Engineering, a

U.S.-based laboratory, for geotechnical testing. These tests, conducted in a controlled laboratory

setting, were aimed at determining the most suitable mining method and optimal stope

dimensions for underground mining. The results confirmed that underground mining is the most

effective approach for the future extraction of manganese minerals from the Emily manganese

deposit.

Using this geotechnical data, Forte selected underhand cut-and-fill underground mining as the

optimal approach. This method is frequently employed for large and small underground mining

operations, principally for its ability to selectively mine higher-grade ore deposits with variable

geometries and dip. The method involves mining ore in horizontal slices and subsequently filling

the voids with paste or cemented backfill material to allow additional extraction . While it is a

more costly technique than some alternatives, its advantages include it being extremely selective

by targeting high ore extraction, low ore dilution, and the ability to reuse waste rock or tailings

as backfill, thereby reducing the surface area of the operation.

Based on a 10% Mn cut -off grade, Forte completed a detail ed design of two representative

mining levels—an upper zone and a lower zone—using this method. By comparing the designed

mineralized zones to the estimated resources on these levels, Forte determined that

approximately 88% of the estimated resources are mineable and recoverable, representing about

89% of the contained manganese. Forte also reports that a dditional analysis may further refine

these figures and improve cost-recovery-cutoff parameters.

The figures below represent an isometric view of the Emily Manganese Deposit and mine design

looking northeast in cross-section and isometric view.

3

Figure 1: Isometric view Emily Project (looking northeast, not to scale)

Figure 2: Representative Cross Section of Emily Project (looking northeast, not to scale)

4

Brian Savage, CEO, Electric Metals, commented “We are very pleased with the approach and work

performed by Forte on ou r PEA, and specifically on identifying a viable underground mining

approach for the Emily manganese deposit. We are especially pleased with the ability to extract

approximately 88% of the estimated resources and about 89% of the contained manganese using

the overhand cut-and-fill mining method. While we are only at the PEA level of studies, we are

extremely encouraged by these preliminary results.”

Next Steps: Advancing Towards Feasibility

Following the completion of the PEA, expected in Q2 2025, Electric Metals will advance to a Pre-

Feasibility Study, further refining economic projections and optimizing mine development

strategies. Additional metallurgical testing and engineering evaluations will lay the groundwork

for a processing facility designed to produce battery -grade high -purity manganese sulfate

monohydrate (HPMSM) and other premium manganese products, enhancing d omestic supply

chain security for the EV battery sector.

Qualified Person

The scientific and technical data contained in this news release was reviewed and approved by

Donald Hulse, a Mining Engineer and Director of Mining Resources of Forte Dynamics, Inc., who

is a Qualified Person under National Instrument 43 -101 Standards of Disclosure for Mineral

Projects.

About Electric Metals (USA) Limited

Electric Metals (USA) Limited (TSXV: EML) (OTCQB: EMUSF) is a US -based mineral development

company with manganese and silver projects geared to supporting the transition to clean energy.

The Company’s principal asset is the Emily Manganese Project in Minne sota, the highest-grade

manganese deposit in North America, which has been the subject of considerable technical

studies, including National Instrument 43 -101 Technical Reports – Resource Estimates. The

Company’s mission in Minnesota is to become a domestic US producer of high-value, high-purity

manganese metal and chemical products to supply the North American electric vehicle battery,

technology and industrial markets . With manganese playing a critical and prominent role in

lithium-ion battery formulations, and with no current domestic supply or active mines for

manganese in North America, the development of the Emily Manganese Project represents a

significant opportunity for America, the State of Minnesota and for the Company’s shareholders.

For further information, please contact:

Electric Metals (USA) Limited

Brian Savage

CEO & Director

(303) 656-9197

or

5

Valerie Kimball

Director Investor Relations

720-933-1150

[email protected]

Forward-Looking Information

This news release contains “forward -looking information” and “forward -looking statements”

(collectively, “forward-looking information”) within the meaning of applicable securities laws.

Forward-looking information is generally identifiable by use of the words “believes,” “may,”

“plans,” “will,” “anticipates,” “intends,” “could”, “estimates”, “expects”, “forecasts”, “projects” and

similar expressions, and the negative of such expressions.

Such statements in this news release include, without limitation: the ability to produce battery -

grade high-purity manganese sulfate monohydrate (HPMSM) and other high -grade manganese

products from the Emily manganese deposit; conduct a scoping study, Preliminary Economic

Assessment and Pre -Feasibility Study to evaluate the overall feasibility and design parameters;

development of processing plant; other metallurgical test work, and planned or potential

developments in ongoing work by Electric Metals.

These statements address future events and conditions and so involve inherent risks,

uncertainties and other factors that could cause actual events or results to differ materially from

estimated or anticipated events or results implied or expressed in such forward-looking

statements. Such risks include, but are not limited to, the failure to obtain all necessary stock

exchange and regulatory approvals. Forward -looking information is based on the reasonable

assumptions, estimates, analysis and opinions of management made in light of its experience and

perception of trends, updated conditions and expected developments, and other factors that

management believes are relevant and reasonable in the circumstances at the date such

statements are made. Although the Company has attempted to identify important factors that

could cause actual results to differ materially from those contained in forward -looking

information, there may be other factors that cause results not to be as anticipated. There can be

no assurance that such information will prove to be accurate, as actual results and future events

could differ materially from those anticipated in such information. Accordingly, readers should

not place undue reliance on forward-looking information.

All forward-looking information herein is qualified in its entirety by this cautionary statement, and

the Company disclaims any obligation to revise or update any such forward -looking information

or to publicly announce the result of any revisions to any o f the forward -looking information

contained herein to reflect future results, events, or developments, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.