Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ELR.TO ·

Eastern Platinum Files Updated Technical Report on the Crocodile River Mine

Technical Reports (NI 43-101)

Eastern Platinum Files Updated Technical

Report on the Crocodile River Mine

Vancouver, British Columbia--(Newsfile Corp. - May 20, 2022) - Eastern Platinum Limited (TXS: ELR)

(JSE: EPS) ("

Eastplats

" or the "

Company

") is pleased to announce that it has filed the "NI 43-101

Technical Report on the Crocodile River Mine ("

CRM

"), North West Province, South Africa" (the

"

Report

") dated January 1, 2022 on SEDAR. The CRM is a platinum group metal ("

PGM

") mine located

70 km north-northwest of Johannesburg in the North West Province and 7 km south of the town of Brits

and situated on the western limb of the Bushveld Igneous Complex in an area of known structural

complexity, the Brits Graben. The current mine lease area includes one operating mining section (the

"

Zandfontein Section

") and two development sections (the "

Crocette Section

" and the "

Kareespruit

Section

", respectively).

The Report has been updated, in preparation of the re-start of underground mining at the Zandfontein

Section of CRM which was placed under care and maintenance in 2013. The resources and reserves

updates of the Report apply to each of the Zandfontein Section, the Crocette Section and the

Kareespruit Section.

In connection with the filings, the Company is pleased to provide a statement of the current resources

and reserves supported by the Report. Capitalized terms used and not otherwise defined in this news

release have the meaning ascribed to them by The Canadian Institute of Mining, Metallurgy and

Petroleum.

Zandfontein underground (the project) M&I resource is 28Mt with 3.96Moz and a reserve of

14.58Mt with 1.72Moz for the current project plan of 22 years.

The resources are effective as of January 1, 2022. The following table presents the Measured and

Indicated Mineral Resource for underground:

Mine Area

Mineral

Resource

Class

Geo Loss

Tonnes

Mine Cut

4E

Pt

Pd

Rh

Au

4E Content

Kt

m

g/t

g/t

g/t

g/t

g/t

kg

Moz

Crocette

Measured

3,646

1.86

3.71

2.30

1.01

0.37

0.03

13,516

0.43

Zandfontein

6,688

1.66

4.85

3.01

1.33

0.48

0.04

32,463

1.04

Grand Total

10,335

1.73

4.45

2.76

1.22

0.44

0.03

45,979

1.48

Crocette

Indicated

7,087

1.84

3.70

2.29

1.01

0.36

0.03

26,197

0.84

Zandfontein

21,371

1.56

4.24

2.63

1.16

0.42

0.03

90,636

2.91

Kareespruit

25,243

1.74

4.01

2.49

1.09

0.40

0.03

101,142

3.25

Grand Total

53,701

1.68

4.06

2.52

1.11

0.40

0.03

217,975

7.01

Crocette

M & I

10,733

1.85

3.70

2.30

1.01

0.36

0.03

39,712

1.28

Zandfontein

28,059

1.59

4.39

2.72

1.20

0.43

0.03

123,099

3.96

Kareespruit

25,243

1.74

4.01

2.49

1.09

0.40

0.03

101,142

3.25

Grand Total

64,036

1.69

4.12

2.56

1.13

0.41

0.03

263,954

8.49

Notes:

1

.

Mineral Resource Cut-off of 1.7 g/t 4E applied.

2

.

Columns may not add up due to rounding.

3

.

Mineral Resources are stated as inclusive of Mineral Reserves.

4

.

Mineral Resources are reported as total Mineral Resources and not attributed.

The following table shows the Inferred Mineral Resource:

Mine Area

Mineral

Resource

Class

Geo Loss

Tonnes

Mine Cut

4E

Pt

Pd

Rh

Au

4E

kt

m

g/t

g/t

g/t

g/t

g/t

kg

Moz

Crocette

Inferred

32

1.62

3.91

2.43

1.07

0.39

0.03

124

0.00

Zandfontein

22,550

1.46

4.45

2.76

1.22

0.44

0.03

100,390

3.23

Kareespruit

57,992

1.65

4.16

2.58

1.14

0.41

0.03

241,484

7.76

Grand Total

80,573

1.60

4.24

2.63

1.16

0.42

0.03

341,998

11.00

Notes:

1

.

Mineral Resource Cut-off of 1.7 g/t 4E applied.

2

.

Columns may not add up due to rounding.

3

.

Mineral Resources are stated as inclusive of Mineral Reserves.

4

.

Mineral Resources are reported as total Mineral Resources and are not attributed.

The individual Pt, Pd, Rh and Au values are based on the prill split derived from the composited

individual channel grades of the drillholes. The prill split for underground is presented in the table below.

4E

Unit

New 4E

Historic 4E

6E

Unit

Historic 6E

New 6E

Pt

%

62.05%

61.87%

Pt

%

50.31%

50.46%

Pd

%

27.32%

27.25%

Pd

%

22.16%

22.22%

Rh

%

9.86%

10.42%

Rh

%

8.47%

8.02%

Au

%

0.77%

0.47%

Au

%

0.38%

0.63%

4E

%

100.00%

100.00%

Ru

%

3.68%

3.68%

Ir

%

15.00%

15.00%

6E

%

100.00%

100.00%

The TSF (as defined below) Mineral Resources are stated as at January 1, 2022, at no cut-off as all the

material will be processed is tabled in the following table:

Mineral

Resource

Class

Tonnes

3E

Pt

Pd

Rh

Au

Cr2O3

FeO

Cr

2

O

3

FeO

kt

g/t

g/t

g/t

g/t

g/t

%

%

kt

kt

Measured

4,594

1.17

0.71

0.29

0.17

0.01

19.54

15.16

898

697

Indicated

1,049

1.14

0.69

0.29

0.17

0.01

19.21

15.03

202

158

Total in

Model

5,643

1.16

0.70

0.29

0.17

0.01

19.48

15.14

1,099

854

Reworked

Added

(Indicated)

1,545

1.18

0.72

0.30

0.17

0.01

18.50

14.50

286

224

Total

Measured

4,594

1.17

0.71

0.29

0.17

0.01

19.54

15.16

898

697

Total

Indicated

2,594

1.16

0.71

0.29

0.17

0.01

18.79

14.71

487

382

Total TSF

7,188

1.17

0.71

0.29

0.17

0.01

19.27

15.00

1,385

1,078

The Mineral Reserve estimate for the CRM underground operations as at January 1, 2022 is detailed in

the table below:

Mineral Reserve Category

Delivered Tonnes

4E Grade

4E Content

kt

g/t

kg

koz

Proved

2,282

4.75

10,829

348

Probable

12,298

3.48

42,777

1,375

Total

14,580

3.68

53,605

1,723

Notes:

1

.

The Mineral Reserve estimation includes only diluted Measured and Indicated Mineral Resources which have been converted to Proved and

Probable Mineral Reserves.

2

.

A portion of Inferred Mineral Resources are included in the LoM plan, as it is required to mine through Inferred portions to access Measured

and Indicated Mineral Resources. These Inferred Mineral Resources have, however, been excluded in the Mineral Reserve estimation and in

the economic analysis.

3

.

No Inferred Mineral Resources have been included in the Mineral Reserve estimation.

4

.

The Mineral Reserve estimation was completed using a 4E basket price of USD1,825/oz and exchange rate of 15.53 ZAR/USD.

5

.

An uneconomical tail of 133.34 kt at a 4E grade of 3.51 g/t, containing 15.06 koz has been excluded from the Mineral Reserve estimate.

6

.

The Mineral Reserves are reported as total Mineral Reserves and are not attributed.

The Mineral Reserve estimate for the CRM TSF Re-mining operation as at January 1, 2022 is detailed

in the table below:

Mineral Reserve

Category

Tonnes

4E Grade

4E Content

Cr

O

Content

Cr

O

Grade

kt

g/t

kg

koz

kt

%

Probable

7,570

1.10

8,345

268

1,371

18.12

Notes:

1

.

The Mineral Reserve estimation includes only diluted Measured and Indicated Mineral Resources which have been converted to Probable

Mineral Reserves.

2

.

No Inferred Mineral Resources have been included in the Mineral Reserve estimation.

3

.

The Mineral Reserve estimation was completed using a 4E basket price of USD2,305/oz, and calculated Chrome price (as per offtake

agreement) of USD106/t and exchange rate of 15.53 ZAR/USD.

4

.

Chrome ore produced from the re-mined tailings is sold on a cost-plus basis, considering the TSF remining costs, processing cost and

chrome logistics costs and an additional allowance for certain overheads.

5

.

The Mineral Reserve excludes PGMs and Chrome Oxide from the TSF already re-mined since December 2018.

6

.

The Mineral Reserves are reported as total Mineral Reserves and are not attributed.

Full details of the methodology used in the estimation of reserves and resources, along with details of the

mining operations at CRM are provided in the Report filed on SEDAR.

Based on the updated resources and reserves, the planned re-start project at the underground mine at

CRM will focus on the Zandfontein Section (the "

Planned Project

").

This is a robust project based on a hybrid mining method that was selected from the trade-off study

conducted in 2021. This mining method was selected considering the geological complexity of the

Zandfontein orebody and the requirements for the selection of a suitable, technically and economically

viable mining method. The hybrid mining method is well suited to the orebody and allows for minimum

off-reef development. The mine plan is practical and a production ramp up to steady state production

volumes has been planned.

The study was conducted on a "standalone underground" operation, as well as an "including the

remining and processing of the Tailings Storage Facility ("

TSF

")" operation.

The Planned Project Highlights (all amounts in USD unless specified)

Net Present Value ("

NPV

") of approximately $188.0 million excluding the TSF and $202.0 million

including the TSF, based on the following parameters:

at 11.87% discount rate using a life of mine ("

LoM

") long term 4E PGM basket price and

calculated chrome price as per the offtake agreement;

the exchange rate utilized for the conversion to USD is R15.53; and

LoM: 1.51 million 4E oz of commercial production over 22 years.

The following table presents a range of values based on various discount rates:

Item

Unit

Excluding TSF

Including TSF

TSF

NPV@0%

USDm

494

509

15

NPV@5%

USDm

313

328

15

NPV@10%

USDm

214

228

14

[email protected]%

USDm

188

202

14

NPV@15%

USDm

154

167

13

NPV@20%

USDm

115

127

12

Non-sustaining capital costs of $21 million, which includes a 15% contingency applied to capital

expenditure estimates with a Total All-In Costs of $1,537 per 4E oz with a contingency of 20%

applied to mining operating costs, and 10% applied to the processing and other costs, in line with

estimate accuracies.

Payback period of 2.0 years including the TSF.

Diana Hu, President, Chief Executive Officer, and Director of Eastplats commented, "Now the Company

will embark on securing the required funding to get the Zandfontein underground mining restarted in

2022."

Technical Report and Qualified Person

The Report has been filed on SEDAR and on Eastplats' website today. The Report has been prepared

under the supervision of the following individuals, each of whom is independent of the Company and is a

Qualified Person as defined within the meaning of National Instrument 43-101 -

Standards of Disclosure

for Mineral Projects

:

Daniel (Daan) van Heerden, BEng (Min.), MCom (Bus. Admin.), MMC Pr. Eng., FSAIMM,

AMMSA, Director of Minxcon (Pty) Ltd.

Uwe Engelmann, BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat., MGSSA, Director of Minxcon

(Pty) Ltd.

Johan Odendaal, BSc (Geol.), BSc Hons (Min. Econ.), MSc (Min. Eng.), Pr.Sci.Nat., FSAIMM,

MGSSA, Director of Minxcon (Pty) Ltd.

The technical information in this news release was reviewed and approved by Daan van Heerden, Uwe

Engelmann and Johan Odendaal who are Qualified Persons as defined by NI 43-101.

About Eastern Platinum Limited

Eastplats owns directly and indirectly a number of PGM and chrome assets in the Republic of South

Africa. All of the Company's properties are situated on the western and eastern limbs of the Bushveld

Complex, the geological environment that hosts approximately 80% of the world's PGM-bearing ore.

Operations at the Crocodile River Mine currently include re-mining and processing of its tailings

resource to produce PGM and chrome concentrates from the Zandfontein tailings dam.

For further information, please contact:

EASTERN PLATINUM LIMITED

Wylie Hui, Chief Financial Officer and Corporate Secretary

[email protected]

(email)

(604) 800-8200 (phone)

Cautionary Statement Regarding Forward-Looking Information

This press release contains "forward-looking statements" or "forward-looking information" (collectively

referred to herein as "

forward-looking statements

") within the meaning of applicable securities

legislation.

Such forward-looking statements include, without limitation, forecasts, estimates,

expectations and objectives for future operations that are subject to a number of assumptions, risks and

uncertainties, many of which are beyond the control of the Company.

Forward-looking statements are

statements that are not historical facts and are generally, but not always, identified by the words "will",

"plan", "intends", "may", "could", "expects", "anticipates" and similar expressions. Further disclosure of

the risks and uncertainties facing the Company and other forward-looking statements are discussed in

the Company's most recent Annual Information Form available under the Company's profile on

www.sedar.com

.

In particular, this press release contains, without limitation, forward-looking statements pertaining to:

highlights of the Crocodile River Mine Technical Report including expected costs of the project and the

life of the mine, the ore tonnes and waste tonnes to be produced over the life of the mine; the delivered

4E content during the life of the mine, the valuation estimates, and the ability of the Company to secure

further funding. These forward-looking statements are based on assumptions made by and information

currently available to the Company.

Although management considers these assumptions to be

reasonable based on information currently available to it, they may prove to be incorrect.

By their very

nature, forward-looking statements involve inherent risks and uncertainties and readers are cautioned

not to place undue reliance on these statements as a number of factors could cause actual results to

differ materially from the beliefs, plans, objectives, expectations, estimates and intentions expressed in

such forward-looking statements. These factors include, but are not limited to, unanticipated problems

that may arise in the Company's production processes, commodity prices, lower than expected grades

and quantities of resources, need for additional funding and availability of such additional funding on

acceptable terms, economic conditions, currency fluctuations, competition and regulations, legal

proceedings and risks related to operations in foreign countries.

All forward-looking statements in this press release are expressly qualified in their entirety by this

cautionary statement, the "

Cautionary Statement on Forward-Looking Information

" section contained in

the Company's most recent Management's Discussion and Analysis available under the Company's

profile on

www.sedar.com

.

The forward-looking statements in this press release are made as of the date

they are given and, except as required by applicable securities laws, the Company disclaims any

intention or obligation, and does not undertake, to update or revise any forward-looking statements,

whether as a result of new information, future events or otherwise.

This press release may include certain terms or performance measures commonly used in the mining

industry that are not defined under International Financial Reporting Standards ("

IFRS

") as issued by the

International Accounting Standards Board, which is incorporated in the CPA Canada Handbook. The

Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain

investors use this information to evaluate the Company's performance. Any such data presented is

intended to provide additional information and should not be considered in isolation or as a substitute for

measures of performance prepared in accordance with IFRS.

No stock exchange, securities commission or other regulatory authority has approved or

disapproved the information contained herein.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/124675