Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ELO.TO ·

Eloro Resources’ drill hole DSB-47 intersects 114g Ag eq/t (9.90g Ag/t, 0.12 g Au/t, 0.96% Zn, and 0.68% Pb) over 320.97m in the Santa Barbara High-Grade Zone, at the Iska Iska Silver- Tin Polymetallic Project, Potosi Department, Bolivia

Drill Results

Eloro Resources’ drill hole DSB-47 intersects 114g Ag eq/t (9.90g Ag/t, 0.12 g Au/t, 0.96% Zn,

and 0.68% Pb) over 320.97m in the Santa Barbara High-Grade Zone, at the Iska Iska Silver-

Tin Polymetallic Project, Potosi Department, Bolivia

 Holes DSB-50, DSB-51 and DSB-52, the southernmost holes that tested the potential south-

southeastern extension of the High-Grade Zone at Sa nta Barbara, each returned well

mineralized intersections over 100m core length as follows:

o 86.67g Ag eq/t (13.57g Ag/t, 0.99% Zn and 0.41% Pb) over 105.42m including

193.50 g Ag eq/t (15.34g Ag/t, 3.22% Zn and 0.17% Pb) over 10.57m (DSB-50)

o 103.03g Ag eq/t (5.18g Ag/t, 1.72% Zn and 0.21% Pb) over 143.06m including

175.06 g Ag eq/t (9.39g Ag/t, 2.96% Zn and 0.35% Pb) over 49.87m (DSB-51)

o 123.28g Ag eq/t (7.46g Ag/t, 0.14 g Au/t, 1.85% Zn and 0.26% Pb) over 119.77m

including 306.28 g Ag eq/t (18.03g Ag/t, 0.45g Au/t, 4.55% Zn and 0.47% Pb) over

28.79m (DSB-52)

o Drill holes in the south-southeastern extension of the Santa Barbara Deposit are

notably Zn-rich returning some of the highest Zn values intersected thus far.

o These three holes expand the strike extent of the Santa Barbara High-Grade Zone

to more than 1,100m significantly expanding the potential open pittable resource.

The High-Grade zone is now 800m across and is open along strike to the south-

southeast.

Toronto, Canada, April 12, 2023 – Eloro Resources L td. (TSX: ELO; OTCQX: ELRRF; FSE:

P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from the last eight (8)

diamond drill holes from the definition drill progr am at Santa Barbara in the Iska Iska silver-tin

polymetallic project in the Potosi Department, southern Bolivia. Two (2) of these drill holes (DSB-45

and DSB-47) filled in gaps in previous drilling of the High-Grade Zone . The remaining six (6) holes

(DSB-44. DSB-48, DSB-49, DSB-50, DSB-51 and DSB-52) tested the potential south-southeastern

extension of the High-Grade Zone at Santa Barbara.

As previously reported in Eloro’s press release dated November 27, 2022, the Company completed

84,495m of drilling in 122 holes to complete the definition drill program in the Santa Barbara target

area, as shown in Figure 1. Tables 1 and 2 list si gnificant assay results for the reported drill holes.

Prices used for calculating Ag equivalent grades are as outlined in Eloro’s July 21, 2022 press release

to maintain consistency with Ag equivalent calculations in previous releases.

Tom Larsen, CEO of Eloro, said: “These latest results, which complete the Santa Barbara definition

diamond drill program, have significantly expanded the potential open pittable resource across the

valley of the Iska Iska Caldera. Micon International Limited (”Micon”) will be updating the deposit’s

inaugural mineral resource model to incorporate the se new results. Our geological technical team

led by Dr. Bill Pearson, P.Geo. and Dr. Osvaldo Arce, P.Geo., is working closely with Micon to ensure

all required information is completed. As recently reported (see Eloro’s press release dated April 4,

2023) additional metallurgical testing is being car ried out under the direction of Mike Hallewell,

C.Eng., Eloro’s Senior Strategic Metallurgist.”

20 Adelaide Street East, Suite 200, Toronto, Ontari o CANADA M5C 2T6 Tel.: (416) 868-9168

TSX Symbol: ELO www.elororesources.com

2 | P a g e

Dr. Bill Pearson, P.Geo., Eloro’s Executive Vice Pr esident, Exploration commented: “Drilling is

advancing in the Casiterita area as previously outl ined to test for the potential tin porphyry (see

Eloro’s February 14, 2023 press release). To date, a total of 3,302 metres of diamond drilling has

been completed in 9 holes, including two in progress. Assay results from these holes are pending.

We have also completed additional surface induced polarization/resistivity (“IP/Res”) surveys on the

western side of Santa Barbara. Bore hole IP/Res (“BHIP”) surveys continue to be carried out on drill

holes as holes are completed. Regional geological, prospecting and sampling, along with ground

magnetic surveys, are being carried out on Eloro’s large land package in the Iska Iska area (see

Eloro press release dated November 22, 2022).”

Santa Barbara Definition Drilling

Hole DSB-47 was drilled to test the area immediately southwest of the Santa Barbara Breccia Pipe

(“SBBP”) (Figure 1) and returned a 321m long inters ection with a number of higher-grade intervals

as follows:

 114g Ag eq/t (9.90g Ag/t, 0.12 g Au/t, 0.96% Zn, and 0.68% Pb) over 320.97m from 59.40m

to 380.37m, including higher-grade portions of:

o 232.30 g Ag eq/t (29.86g Ag/t, 0.22 g Au/t, 0.63% Z n, 2.18% Pb, 0.30% Cu and

0.10%Sn) over 32.02m from 60.90m to 92.92m

o 147.06 g Ag eq/t (5.41g Ag/t, 1.90% Zn and 0.90% Pb) over 10.66m from 133.89m

to 144.55m

o 184.83 g Ag eq/t (36.83g Ag/t, 1.81% Zn and 1.13% Pb) over 23.82m from 170.30m

to 194.12m

o 243.09 g Ag eq/t (4.48g Ag/t, 0.95 g Au/t, 2.02% Z n and 0.81% Pb) over 13.68m

from 218.45m to 232.13m and

o 249.06g Ag eq/t (18.48g Ag/t, 0.10 g Au/t, 2.34% Zn, 1.74% Pb and 0.11% Sn) over

24.30m from 285.25m to 309.55m

Six (6) holes (DSB-44. DSB-48, DSB-49, DSB-50, DSB- 51 and DSB-52) tested the potential

south-southeastern extension of the High-Grade Zone at Santa Barbara. All these holes, which

were drilled at an azimuth of 225 0 with a dip of -60 0, tested and confirmed an additional 300m of

potential strike length to the south-southeast. Co llectively, these holes intersected many

significant intersections within altered and mineralized dacite porphyry, dacite and dacitic breccia.

The most significant holes are the most southernmost three, DSB-50, DSB-51 and DSB-52, which

each returned well mineralized intersections over 100m in core length as follows:

 86.67g Ag eq/t (13.57g Ag/t, 0.99% Zn and 0.41% Pb) over 105.42m including 193.50 g

Ag eq/t (15.34g Ag/t, 3.22% Zn and 0.17% Pb) over 10.57m (DSB-50)

 103.03g Ag eq/t (5.18g Ag/t, 1.72% Zn and 0.21% Pb) over 143.06m including 175.06 g

Ag eq/t (9.39g Ag/t, 2.96% Zn and 0.35% Pb) over 49.87m (DSB-51)

 123.28g Ag eq/t (7.46g Ag/t, 0.14 g Au/t, 1.85% Zn and 0.26% Pb) over 119.77m including

306.28 g Ag eq/t (18.03g Ag/t, 0.45g Au/t, 4.55% Zn and 0.47% Pb) over 28.79m (DSB-

52)

Drill holes in the south-southeastern extension of the Santa Barbara Deposit are notably Zn-rich

returning some of the highest Zn values intersected thus far. These three holes expand the strike

extent of the Santa Barbara High-Grade Zone to more than 1,100m significantly expanding the

3 | P a g e

potential open pittable resource. The High-Grade z one is now 800m across and is open along

strike to the south-southeast .

In addition to the results cited above, all six holes drilled in the southeasternmost part of the target

area returned numerous additional reportable intersections which are listed in detail in Table 2.

Figure 1 – Geological Plan Map showing Drilling in Santa Barbara Area with Holes referred

to in this release highlighted.

4 | P a g e

Table 1: Significant Results, Fill-in Surface Diamond Drilling Santa Barbara Deposit as at

April 12, 2023.

Ag Au Zn Pb Cu Sn Bi Cd Ag eq

g/t g/t % % % % % % g/t

DSB-47 14.12 20.13 6.01 3.00 0.18 0.02 0.42 0.07 0.01 0.001 0.001 45. 31

35.10 38.13 3.03 5.02 0.16 0.06 0.77 0.02 0.04 0.001 0.001 63. 85

59.40 380.37 320.97 9.90 0.12 0.96 0.68 0.06 0.04 0.007 0.006 114.00

Incl. 60.90 92.92 32.02 29.86 0.22 0.63 2.18 0.30 0.10 0.037 0.008 2 32.30

Incl. 133.89 144.55 10.66 5.41 0.02 1.90 0.90 0.02 0.04 0.002 0.008 147.06

Incl. 170.30 194.12 23.82 36.83 0.02 1.81 1.13 0.02 0.04 0.007 0.00 9 184.83

Incl. 218.45 232.13 13.68 4.48 0.95 2.02 0.81 0.03 0.05 0.012 0.021 243.09

Incl. 285.25 309.55 24.30 18.48 0.10 2.34 1.74 0.03 0.11 0.012 0.01 1 249.06

407.54 443.53 35.99 60.46 0.04 0.17 0.04 0.03 0.06 0.016 0.00 1 102.52

449.57 502.90 53.33 19.32 0.03 0.12 0.02 0.02 0.05 0.004 0.00 1 48.36

523.78 544.27 20.49 46.60 0.33 0.18 0.03 0.05 0.06 0.038 0.00 1 122.11

552.01 553.45 1.44 49.00 0.11 0.08 0.02 0.04 0.04 0.025 0.001 89.83

558.01 565.49 7.48 5.57 0.03 0.11 0.02 0.02 0.05 0.010 0.001 4 0.35

570.00 571.54 1.54 22.00 0.03 0.03 0.01 0.04 0.06 0.010 0.001 56.27

577.49 579.02 1.53 65.00 0.53 0.08 0.14 0.07 0.15 0.136 0.001 217.80

589.56 595.70 6.14 16.63 0.12 0.04 0.03 0.02 0.05 0.029 0.001 57.26

602.08 603.62 1.54 1.00 0.01 0.05 0.02 0.00 0.13 0.001 0.001 5 6.14

606.71 609.71 3.00 5.47 0.18 0.03 0.03 0.02 0.04 0.034 0.001 4 8.22

612.72 615.73 3.01 0.75 0.01 0.02 0.01 0.01 0.11 0.001 0.001 4 5.72

618.73 620.27 1.54 0.50 0.01 0.02 0.01 0.01 0.12 0.001 0.001 5 0.24

626.26 627.77 1.51 2.00 0.01 0.01 0.01 0.01 0.11 0.001 0.001 4 8.49

639.90 641.45 1.55 1.00 0.01 0.60 0.01 0.00 0.04 0.001 0.002 4 6.31

654.89 656.38 1.49 7.00 0.16 0.12 0.01 0.06 0.08 0.009 0.001 6 6.86

669.92 671.43 1.51 1.00 0.03 0.07 0.01 0.01 0.11 0.001 0.001 5 2.02

701.66 704.66 3.00 5.93 0.11 0.26 0.03 0.03 0.29 0.005 0.001 1 45.91

719.59 721.09 1.50 3.00 0.16 0.21 0.03 0.07 0.09 0.036 0.001 7 7.56

773.78 778.30 4.52 1.33 0.13 0.06 0.05 0.00 0.08 0.047 0.001 6 0.85

839.96 841.43 1.47 16.00 0.09 0.04 0.02 0.08 0.08 0.007 0.001 68.49

853.45 859.50 6.05 6.95 0.19 0.19 0.02 0.04 0.02 0.012 0.001 4 7.65

872.88 874.40 1.52 6.00 0.03 0.02 0.00 0.32 0.04 0.021 0.001 6 5.14

888.02 892.58 4.56 5.97 0.22 0.16 0.02 0.09 0.02 0.022 0.001 5 8.69

934.63 936.15 1.52 1.00 0.27 0.00 0.00 0.02 0.01 0.092 0.001 5 0.88

966.19 967.73 1.54 1.00 0.65 0.01 0.00 0.01 0.01 0.002 0.001 6 4.93

973.69 982.69 9.00 1.74 0.29 0.01 0.00 0.08 0.01 0.050 0.001 5 3.07

Hole No. From (m) To (m) Length (m)

5 | P a g e

Table 1 (con’t) -

Note: True width of the mineralization is not known at th e present time, but based on the current

understanding of the relationship between drill ori entation/inclination and the mineralization within

the breccia pipes and the host rocks such as sandstones and dacites, it is estimated that true width

ranges between 70% and 90% of the down hole interval length but this will be confirmed by further

drilling and geological modelling.

Chemical symbols: Ag= silver, Au = gold, Zn = zinc, Pb = lead, Cu = copper, Sn = tin, Bi = bismuth,

Cd = cadmium and g Ag eq/t = grams silver equivalent per tonne. Quantities are given in percent (%)

for Zn, Pb Cu, Sn, Bi and Cd and in grams per tonne (g/t) for Ag, Au and Ag eq.

Metal prices and conversion factors used for calcul ation of g Ag eq/t (grams Ag per grams x metal

ratio) are as follows: (Prices updated as of July 2 1, 2022, to more accurately reflect current metal

prices):

Element Price $US (per kg) Ratio to Ag

Ag $607.00 1.0000

Sn $23.55 0.0589

Zn $2.98 0.0046

Pb $1.92 0.0032

Au $54,932.80 79.7221

Cu $7.00 0.0134

Bi $12.76 0.0177

Cd $5.50 0.0076

Ag Au Zn Pb Cu Sn Bi Cd Ag eq

g/t g/t % % % % % % g/t

DSB-45 14.40 15.75 1.35 14.00 0.04 0.00 0.38 0.01 0.13 0.011 0.001 82 .58

57.15 58.65 1.50 27.00 0.03 0.00 0.29 0.01 0.02 0.014 0.001 49 .73

69.30 84.57 15.27 11.72 0.01 0.00 0.22 0.01 0.05 0.003 0.001 4 0.33

92.45 95.63 3.18 20.09 0.05 0.01 0.60 0.03 0.21 0.036 0.001 13 5.39

104.68 124.58 19.90 24.67 0.06 0.00 0.21 0.02 0.03 0.001 0.00 1 48.28

139.70 157.37 17.67 21.74 0.10 0.01 0.33 0.01 0.01 0.001 0.00 1 46.54

161.89 164.98 3.09 8.49 0.28 0.00 0.42 0.01 0.00 0.001 0.001 4 9.54

172.53 177.26 4.73 31.95 0.18 0.01 0.17 0.01 0.03 0.066 0.001 80.33

197.00 206.45 9.45 18.86 0.04 0.00 0.04 0.01 0.05 0.001 0.001 43.57

230.67 239.67 9.00 2.12 0.02 0.51 0.06 0.01 0.02 0.001 0.004 4 0.74

280.28 305.84 25.56 10.17 0.07 0.02 0.03 0.08 0.09 0.008 0.00 1 64.68

Incl. 298.27 302.82 4.55 21.75 0.20 0.03 0.03 0.27 0.27 0.037 0.001 186.19

316.46 339.21 22.75 30.04 0.01 0.01 0.01 0.05 0.06 0.010 0.00 1 62.73

354.21 360.31 6.10 6.76 0.04 0.05 0.02 0.12 0.19 0.001 0.001 1 03.32

413.20 417.70 4.50 21.33 0.03 0.03 0.00 0.06 0.09 0.005 0.001 67.39

443.40 444.91 1.51 2.00 0.01 0.31 0.03 0.06 0.05 0.001 0.001 4 7.17

450.90 455.40 4.50 10.86 0.03 0.01 0.01 0.01 0.13 0.007 0.001 69.23

464.42 465.97 1.55 5.00 0.02 0.02 0.01 0.06 0.10 0.008 0.001 5 6.18

506.84 509.86 3.02 15.00 0.39 0.20 0.05 0.29 0.27 0.003 0.001 201.22

517.45 519.01 1.56 7.00 0.39 0.11 0.04 0.01 0.02 0.003 0.001 5 6.84

526.47 531.00 4.53 7.00 0.17 0.19 0.05 0.01 0.03 0.003 0.001 4 7.20

578.10 592.40 14.30 15.88 0.11 0.21 0.02 0.14 0.13 0.031 0.00 2 107.89

Incl. 584.05 589.35 5.30 19.23 0.08 0.33 0.02 0.32 0.30 0.013 0.002 198.35

608.89 622.54 13.65 4.83 0.09 0.14 0.01 0.06 0.04 0.010 0.001 43.15

672.53 674.06 1.53 11.00 0.13 0.88 0.04 0.03 0.03 0.003 0.005 82.53

686.18 687.65 1.47 15.00 0.13 0.03 0.08 0.09 0.10 0.007 0.001 80.58

693.70 695.20 1.50 0.50 0.66 0.03 0.02 0.04 0.00 0.001 0.001 6 7.92

716.50 724.05 7.55 4.78 1.10 0.24 0.02 0.04 0.04 0.169 0.001 1 71.18

790.55 799.68 9.13 7.14 0.06 0.01 0.01 0.14 0.12 0.079 0.001 9 0.87

805.78 807.25 1.47 5.00 3.40 0.36 0.01 0.01 0.01 0.151 0.001 3 66.52

817.74 819.26 1.52 1.00 1.95 0.04 0.00 0.02 0.03 0.091 0.001 2 10.52

Hole No. From (m) To (m) Length (m)

6 | P a g e

In calculating the intersections reported in this p ress release a sample cutoff of 30 g Ag eq/t was

used with generally a maximum dilution of 3 continu ous samples below cutoff included within a

mineralized section unless more dilution is justified geologically.

The equivalent grade calculations are based on the stated metal prices and are provided for

comparative purposes only, due to the polymetallic nature of the deposit. Metallurgical tests are in

progress by Blue Coast Research to establish levels of recovery for each element reported. The

preliminary phase of Ag, Zn and Pb testwork is complete but additional development and optimization

will be required. Metallurgical testing is in prog ress to establish Sn recovery. Future geo-

metallurgical programs will also include studies to understand the deportment of other potential

metals such as gold, copper, bismuth and indium. While there is no assurance that all or any of the

reported concentrations of metals will be recoverab le, Bolivia has a long history of successfully

mining and processing similar polymetallic deposits which is well documented in the landmark volume

“Yacimientos Metaliferos de Bolivia ” by Dr. Osvaldo R. Arce Burgoa, P.Geo.

7 | P a g e

Table 2: Significant Results, Definition Surface Diamond Drilling South-Southeastern

Extension Santa Barbara Deposit as at April 11, 2023.

Ag Au Zn Pb Cu Sn Bi Cd Ag eq

g/t g/t % % % % % % g/t

DSB-44 30.72 32.20 1.48 0.50 0.51 0.02 0.02 0.01 0.01 0.001 0.001 54. 61

74.27 77.22 2.95 3.10 0.01 1.11 0.15 0.01 0.02 0.001 0.002 70. 58

116.55 118.02 1.47 3.00 0.01 1.24 0.17 0.01 0.01 0.001 0.004 7 5.40

122.53 125.54 3.01 6.01 0.01 1.82 0.22 0.04 0.01 0.001 0.006 1 14.11

136.08 137.57 1.49 7.00 0.02 1.77 0.48 0.01 0.00 0.001 0.005 1 13.23

216.26 241.83 25.57 5.95 0.03 1.42 0.24 0.02 0.01 0.002 0.005 92.71

256.90 264.36 7.46 0.89 0.03 1.99 0.43 0.01 0.01 0.001 0.006 1 19.73

271.92 276.43 4.51 1.51 0.06 0.47 0.08 0.07 0.01 0.011 0.002 4 5.10

291.52 300.53 9.01 5.67 0.04 1.13 0.27 0.02 0.01 0.001 0.004 7 8.77

332.08 336.60 4.52 3.99 0.01 0.59 0.27 0.01 0.01 0.001 0.003 4 6.16

347.09 389.20 42.11 5.85 0.17 1.10 0.26 0.02 0.01 0.005 0.005 90.53

Incl. 380.25 389.20 8.95 10.59 0.56 1.67 0.62 0.03 0.01 0.020 0.007 175.29

416.30 425.40 9.10 5.16 0.02 0.96 0.12 0.01 0.01 0.001 0.004 6 3.12

436.06 472.20 36.14 7.01 0.03 1.22 0.14 0.01 0.01 0.001 0.007 80.71

Incl. 439.06 445.15 6.09 12.07 0.11 2.75 0.27 0.01 0.01 0.001 0.018 171.92

Incl. 464.62 469.13 4.51 7.53 0.01 1.45 0.24 0.02 0.03 0.001 0 .004 102.66

478.46 487.40 8.94 8.98 0.08 0.99 0.16 0.01 0.01 0.001 0.005 7 6.33

499.49 525.13 25.64 11.41 0.03 1.04 0.29 0.01 0.03 0.001 0.00 4 87.00

Incl. 499.49 508.52 9.03 22.37 0.06 1.71 0.60 0.02 0.03 0.001 0.009 144.05

534.16 544.69 10.53 5.45 0.02 0.56 0.10 0.01 0.02 0.001 0.002 48.25

547.80 567.30 19.50 6.54 0.12 0.72 0.07 0.02 0.04 0.001 0.003 72.23

574.84 576.34 1.50 18.00 0.22 2.49 0.42 0.03 0.07 0.001 0.010 204.13

583.86 586.82 2.96 6.52 0.01 1.21 0.12 0.01 0.03 0.001 0.004 8 3.80

598.90 603.39 4.49 24.73 0.25 0.51 0.18 0.03 0.09 0.001 0.001 117.24

619.93 630.64 10.71 12.39 0.12 0.88 0.03 0.02 0.03 0.004 0.00 1 80.09

634.94 636.44 1.50 11.00 0.09 0.30 0.03 0.02 0.04 0.001 0.001 52.06

706.11 709.22 3.11 4.68 0.09 1.57 0.04 0.02 0.05 0.001 0.006 1 14.27

730.20 736.28 6.08 4.51 0.08 0.21 0.00 0.03 0.06 0.001 0.001 4 9.75

748.30 769.47 21.17 7.34 0.04 0.52 0.02 0.01 0.03 0.001 0.002 50.23

787.70 833.13 45.43 10.17 0.14 0.36 0.13 0.01 0.10 0.001 0.00 2 83.94

Incl. 824.04 830.07 6.03 26.60 0.09 0.53 0.23 0.01 0.22 0.001 0.003 155.60

869.40 870.90 1.50 47.00 0.03 0.08 0.03 0.16 0.16 0.023 0.001 140.96

931.33 932.83 1.50 2.00 1.57 0.02 0.01 0.01 0.00 0.001 0.001 1 47.71

944.92 946.46 1.54 3.00 0.40 0.33 0.00 0.02 0.01 0.001 0.002 59.87

Hole No. From (m) To (m) Length (m)

8 | P a g e

Table 2 (con’t) –

Ag Au Zn Pb Cu Sn Bi Cd Ag eq

g/t g/t % % % % % % g/t

DSB-48 0.00 1.59 1.59 3.50 0.01 0.01 0.02 0.00 0.12 0.001 0.001 52.48

76.14 79.13 2.99 36.17 0.32 0.09 0.81 1.10 0.01 0.127 0.003 25 1.50

132.07 133.54 1.47 1.10 0.50 0.55 0.07 0.18 0.00 0.005 0.001 9 8.73

151.55 154.57 3.02 1.05 0.05 1.14 0.05 0.03 0.00 0.001 0.003 6 8.53

210.44 217.93 7.49 7.88 0.11 2.38 0.22 0.21 0.00 0.001 0.012 1 68.86

287.40 306.97 19.57 18.21 0.07 1.15 0.19 0.19 0.00 0.020 0.00 4 114.11

342.90 345.90 3.00 8.30 0.05 1.47 0.21 0.06 0.00 0.001 0.005 9 9.52

386.60 443.60 57.00 10.62 0.59 0.88 0.14 0.19 0.00 0.026 0.00 5 141.41

Incl. 415.04 425.66 10.62 27.98 1.54 1.82 0.32 0.57 0.01 0.06 6 0.010 348.43

Incl. 437.58 443.60 6.02 33.43 2.40 2.07 0.40 0.43 0.01 0.112 0.012 442.47

452.63 454.14 1.51 4.40 0.35 1.05 0.11 0.03 0.00 0.002 0.005 9 6.55

457.22 458.71 1.49 8.20 0.46 1.57 0.22 0.15 0.00 0.004 0.007 1 53.17

479.83 481.33 1.50 5.60 0.33 1.06 0.12 0.04 0.01 0.004 0.005 1 01.35

506.93 508.48 1.55 15.10 0.55 2.42 0.12 0.53 0.01 0.003 0.015 252.37

515.99 522.05 6.06 9.43 0.24 2.52 0.17 0.15 0.01 0.002 0.014 1 81.04

537.10 543.18 6.08 8.01 0.17 1.87 0.23 0.26 0.01 0.001 0.013 1 58.64

586.64 588.15 1.51 6.40 0.10 1.46 0.22 0.02 0.01 0.001 0.008 1 00.15

627.50 628.97 1.47 3.60 0.52 0.44 0.04 0.01 0.00 0.025 0.001 8 1.27

642.38 643.95 1.57 15.20 0.01 1.65 0.34 0.01 0.01 0.001 0.008 114.00

693.78 695.33 1.55 6.10 0.01 0.91 0.06 0.00 0.00 0.001 0.004 5 5.62

705.88 708.90 3.02 5.28 0.01 0.93 0.11 0.00 0.01 0.001 0.004 5 8.81

730.00 731.53 1.53 6.60 0.02 0.96 0.04 0.00 0.01 0.001 0.005 5 9.97

745.12 746.68 1.56 5.50 0.01 1.21 0.05 0.01 0.04 0.001 0.007 8 4.11

Hole No. From (m) To (m) Length (m)

Ag Au Zn Pb Cu Sn Bi Cd Ag eq

g/t g/t % % % % % % g/t

DSB-49 3.08 74.40 71.32 6.94 0.04 0.09 0.21 0.01 0.05 0.002 0.001 43. 87

99.68 106.67 6.99 5.27 0.01 0.52 0.84 0.02 0.00 0.001 0.052 65 .29

143.83 151.60 7.77 17.41 0.01 1.34 0.43 0.01 0.00 0.001 0.004 100.11

162.20 163.74 1.54 4.00 0.01 0.70 0.13 0.00 0.01 0.001 0.001 4 5.97

174.48 175.99 1.51 4.00 0.01 1.23 0.10 0.00 0.00 0.001 0.004 6 9.90

200.34 201.86 1.52 0.50 0.88 0.23 0.01 0.00 0.00 0.007 0.001 9 4.27

253.30 263.93 10.63 21.02 0.03 1.23 0.49 0.02 0.00 0.025 0.00 5 109.66

285.32 291.28 5.96 10.90 0.06 0.54 0.10 0.01 0.00 0.023 0.002 54.11

313.95 338.13 24.18 6.21 0.02 0.43 0.15 0.01 0.01 0.003 0.002 37.62

348.76 419.28 70.52 15.57 0.22 1.28 0.22 0.01 0.01 0.113 0.00 5 134.92

Incl. 353.33 363.92 10.59 32.75 0.10 1.88 0.26 0.02 0.05 0.04 0 0.008 171.67

Incl. 382.22 393.11 10.89 2.61 0.67 0.15 0.04 0.00 0.00 0.410 0.001 159.09

Incl. 402.24 414.78 12.54 31.80 0.05 4.16 0.78 0.03 0.01 0.04 5 0.018 281.40

449.50 450.94 1.44 3.00 0.01 0.85 0.12 0.01 0.01 0.001 0.003 5 4.87

465.96 469.07 3.11 71.05 0.17 1.68 0.86 0.02 0.01 0.117 0.004 228.13

497.83 502.27 4.44 3.64 0.02 0.81 0.13 0.01 0.01 0.003 0.002 5 5.57

570.16 571.62 1.46 3.00 0.01 0.72 0.24 0.00 0.00 0.001 0.001 4 7.62

595.75 664.63 68.88 10.26 0.04 1.07 0.30 0.01 0.01 0.003 0.00 5 81.61

Incl. 622.87 628.85 5.98 20.43 0.17 2.39 0.37 0.01 0.01 0.006 0.010 172.19

669.26 670.67 1.41 3.00 0.04 0.89 0.18 0.01 0.01 0.004 0.003 6 1.62

684.31 695.53 11.22 12.10 0.04 0.84 0.37 0.01 0.01 0.001 0.00 2 73.56

716.79 738.00 21.21 4.41 0.08 0.63 0.11 0.01 0.01 0.001 0.001 50.56

756.12 759.14 3.02 6.50 0.02 1.74 0.15 0.01 0.01 0.001 0.005 1 05.26

766.69 769.81 3.12 6.39 0.01 0.65 0.17 0.01 0.01 0.001 0.002 4 9.87

Hole No. From (m) To (m) Length (m)