Eloro Resources Intersects 169.11 g Ag eq/t (64.30g Ag/t, 0.96% Zn, 0.37% Pb and 0.07% Sn) over 235.55m to further Expand Higher Grade area to the North in the Eastern Part of the Santa Barbara Target at the Iska Iska Silver-Tin Polymetallic Project, Potosi
Eloro Resources Intersects 169.11 g Ag eq/t (64.30g Ag/t, 0.96% Zn, 0.37% Pb and 0.07%
Sn) over 235.55m to further Expand Higher Grade area to the North in the Eastern Part of
the Santa Barbara Target at the Iska Iska Silver-Tin Polymetallic Project, Potosi
Department, Bolivia
Includes a higher-grade section in this underground hole DSBU-06 (Azimuth 00 and dip -
650) of 314.52 g Ag eq/t (192.18g Ag/t, 0.22 g Au/t, 0.07% Zn, 0.41% Pb, and 0.11%
Sn) over 50.68m and an additional intersection of 110.57 g Ag eq/t (17.38 g Ag/t, 0.09
g Au/t, 0.30% Zn, 0.21% Pb and 0.11%Sn) over 128.44m further down the hole.
Overall, for DSBU-06, 86% of this 599.8m long hole had reportable intersections,
which collectively average 129.70 g Ag eq/t.
Underground hole DSBU-05 on the same due north section as DSBU-06, but shallower
at -400, intersected 141.05 g Ag eq/t (22.99g Ag/t, 0.07g Au/t, 0.18% Zn, 0.16% Pb,
0.21% Cu and 0.12% Sn) over 153.25m
Hole DSBU-05 has a second major intersection lower in the hole from 348.08m to
526.17m of 92.47 g Ag eq/t (23.86g Ag/t, 0.96% Zn, 0.21% Pb) over 178.09m. Overall,
65% of this 641.9m long hole had reportable intersections which collectively
average 107.73 g Ag eq/t.
Toronto, Canada, April 27, 2022 – Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF;
FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional
six (6) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic
project in the Potosi Department, southern Bolivia. Holes DSBU-05 and DSBU-06 are
underground holes drilled from the Santa Barbara adit to test the northern extension of the higher-
grade mineralized zone. Hole DSBS-01 was collared in the southern part of the Santa Barbara
target zone and drilled at an azimuth of 30 0 and dip of -300 to test the same target. Holes DSB-
24, DSB-14 and DSB-22 were drilled at azimuths of 225 0 to test the northwest extension of the
Santa Barbara mineralized zone approximately 100m, 200m, and 1,000m, respectively,
northwest of the Santa Barbara adit underground drill bay. Drilling is continuing in the Porco area
to test for a potential Sn porphyry as suggested by the 3D inverse magnetic model (see Eloro
press release March 1, 2022). Thus far, 4,870 m in five (5) holes have been completed in the
Porco target area with assays pending.
Overall, the Company has completed 52,384m in 89 drill holes to-date, including four holes in
progress, as shown in Figures 1 and 2. Currently there are three (3) surface drills and one (1)
underground drill operating at Iska Iska. Tables 1, 2 and 3 list significant assay results for the drill
holes in the major target areas. Prices used for calculating Ag equivalent grades are as outlined
in Eloro’s February 1, 2022, press release. Table 4 summarizes drill holes with assays pending.
Highlights are as follows:
20 Adelaide Street East, Suite 200, Toronto, Ontario CANADA M5C 2T6 Tel.: (416) 868-9168
TSX.V Symbol: ELO www.elororesources.com
2 | Page
Santa Barbara Mineral Resource Definition Target Area – Underground Drilling
Underground holes DSBU-06 and DSBU-05 were both drilled on azimuth 00 and dips of -650 and
-400, respectively, from the Santa Barbara adit to test the northern extent of higher-grade
mineralization in the eastern part of the Santa Barbara target area.
Hole DSBU-06 intersected 169.11 g Ag eq/t (64.30 g Ag/t, 0.96% Zn, 0.37% Pb and
0.07% Sn) over 235.55m from 0.00m to 235.55m, including a higher-grade section of
314.52 g Ag eq/t (192.18 g Ag/t, 0.22 g Au/t, 0.07% Zn, 0.41% Pb, and 0.11% Sn) over
50.68m from 24.40m to 75.08m.
o This hole had a second major intersection of 110.57 g Ag eq/t (17.38 g Ag/t, 0.09
g Au/t, 0.30% Zn, 0.21% Pb and 0.11%Sn) over 128.44m from 264.14m to
392.58m.
o Overall, 86% of this 599.8m long hole had reportable intersections which
collectively average 129.70 g Ag eq/t.
Hole DSBU-05 intersected 141.05 g Ag eq/t (22.99 g Ag/t, 0.07 g Au/t, 0.18% Zn,
0.16% Pb, 0.21% Cu and 0.12% Sn) over 153.25m from 0.00m to 153.25m which
included high grade sections of:
o 201.23 g Ag eq/t (21.77 g Ag/t, 0.06 g Au/t, 0.36% Zn, 0.30 %Pb, 0.63 %Cu and
0.12% Sn) over 34.97m from 0.00m to 34.97m,
o 206.03 g Ag eq/t (24.52 g Ag/t, 0.18 g Au/t, 0.14% Zn, 0.16 %Pb, 0.11% Cu and
0.23% Sn) over 9.05m from 76.94m to 85.99m, and
o 242.83 g Ag eq/t (31.67 g Ag/t, 0.04 g Au/t, 0.23% Zn, 0.19% Pb, 0.17% Cu and
0.28% Sn) over 25.60m from 109.93m to 135.53m.
o Hole DSBU-05 has a second major intersection lower in the hole from
348.08m to 526.17m of 92.47 g Ag eq/t (23.86 g Ag/t, 0.96% Zn, 0.21% Pb) over
178.09m.
o Overall, 65% of this 641.9m long hole had reportable intersections which
collectively average 107.73 g Ag eq/t.
Dr. Bill Pearson, P.Geo. Executive Vice President, Exploration commented: “As shown in Figure
3, a N-S cross section looking east, holes DSBU-06 and DSBU-05 define a significant extension
to the north of the major high grade mineralized area in the southern part of Santa Barbara.
Further drilling, especially deeper, is in progress to define the full extent of this important high-
grade zone. Analysis of borehole IP data and the 3D inverse magnetic model by Eloro’s
geophysicists Dr. Chris Hale, P.Geo. and John Gilliatt, P.Geo. shows that the Mx Chargeability
indicates stronger mineralization at greater depth as shown in Figure 4. The spatial agreement
between the interpolated chargeability and the mineralization intersected in these holes also
suggests that the mineralized zone may dip steeply to the south. Further deeper drilling will be
carried out to test this highly prospective target. Drilling will also be carried out from the southwest
to test the Northwest Extension target as the best mineralization intersected thus far is in the
southern part of this target zone.”
Dr. Pearson continued, “The addition of a fourth drill and the more rapid turnaround from both
our assay laboratories at ALS and AHK has allowed us to increase the pace of the exploration
drill program considerably. In the next 2-3 weeks we expect to have the GeologicAI core scanner
on site. We have worked closely with GeologicAI to build the database for the scanner from all
our available geological and geochemical information. The scanner will allow us to better outline
3 | Page
and track the mineral and metal zonation at Iska Iska, which is critical to efficiently explore this
remarkable mineralizing system which remains open in all directions.”
Dr. Osvaldo Arce, P.Geo., General Manager of Eloro’s Bolivian subsidiary Minera Tupiza S.R.L.
(“Minera Tupiza”), further commented: “The dacitic volcanic domes and breccia pipes at Iska
Iska, which are the primary hosts of the epithermal polymetallic Ag-Zn-Pb-Sn mineralization,
appear to extend to a depth of at least 1km. These intrude altered granodiorite and intrusion
breccias that are the primary hosts of xenothermal tin and other higher temperature metals such
as bismuth and tungsten. The mineralization is quite complex in detail with extensive breccias,
veins, veinlets, stockworks and disseminations. The likely primary distribution of both epithermal
and xenothermal mineralization is indicated by the metal zonation, alteration zonation and
geophysical responses. This data indicates that the mineralized system strengthens with depth
and may be much more extensive than indicated in shallower drill holes.”
Santa Barbara Mineral Resource Definition Target Area – Surface Drilling
Hole DSBS-01 was collared in the southern part of the Santa Barbara target zone as shown in
Figure 2. This hole was drilled at an azimuth of 300 with a dip of 300 to a length of 700.8m.
163.23 g Ag eq/t (2.07 g Ag/t and 0.27% Sn) over 33.23m from 58.66m to 90.94m
including 560.74 g Ag eq/t (2.07 g Ag/t and 0.94% Sn) over 7.61m from 63.15m to
70.76m,
54.95 g Ag eq/t (2.94 g Ag/t, 0.14% Pb, and 0.30% Cu) over 22.58m from 225.36m to
247.94m including 129.69 g Ag eq/t (3.00 g Ag/t and 0.88% Cu) over 3.04m from
225.36m to 228.40m.
90.79 g Ag eq/t (5.36 g Ag/t, 0.85% Zn and 0.44% Pb) over 43.60m from 285.56m to
329.16m including 146.04 g Ag eq/t (2.01 g Ag/t, 1.36% Zn, 0.49% Pb and 0.09% Sn)
over 4.59m from 294.43m to 299.02m and 200.55 g Ag eq/t (12.68 g Ag/t, 1.95% Zn,
0.93% Pb and 0.11% Sn) over 8.97m from 320.19m to 329.16m
110.40 g Ag eq/t (6.66 g Ag/t, 1.80% Zn and 0.40% Pb) over 55.63m from 414.88m to
470.51m including 351.80 g Ag eq/t (28.05 g Ag/t, 0.19 g Au/t, 4.99% Zn, 1.26% Pb and
0.22% Cu) over 4.45m from 416.39m to 40.84m and 153.44 g Ag eq/t (4.34 g Ag/t,
2.95% Zn and 0.32% Pb) over 9.04m from 437.41m to 446.45m.
108.55 g Ag eq/t (12.96 g Ag/t, 0.11 g Au/t, 1.43 % Zn and 0.43% Pb) over 31.71m
from 491.56 to 523.27m including 192.64 g Ag eq/t (27.91 g Ag/t, 0.25 g Au/t, 2.29% Zn
and 0.89% Pb) over 10.63m from 509.62m to 520.25m.
68.66 g Ag eq/t (8.94 g Ag/t, 1.02% Zn and 0.20% Pb) over 25.49m from 611.34m to
636.83m including 114.99 g Ag eq/t (19.98 g Ag/t, 1.65% Zn and 0.35% Pb) over 8.93m
from 627.90 to 636.83m
with further intervals of reportable mineralization continuing to near the terminus of the
hole representing the furthest east and some of the deepest mineralization yet
encountered at Santa Barbara.
Further drilling is planned south-southeast of this area to continue to trace the full extent of the
Ag-Au-Zn-Pb-Cu-Sn polymetallic epithermal system.
Northwest Extension, Santa Barbara Mineral Resource Definition Target Area
Results for three (3) additional drillholes all drilled at an azimuth of 225 0 in the Northwest
Extension Target Area of Santa Barbara (see Figure 2) have been received. Holes DSB-24 (-
4 | Page
650), DSB-14 (-65 0) and DSB-22 (65 0) were collared 100m, 200m and 1000m, respectively
northwest of the Santa Barbara adit drill bay.
Hole DSB-24 intersected 22 reportable intersections as shown in Table 2 of which the best
results were deeper in the hole as follows:
120.18 g Ag eq/t (41.22 g Ag/t, 0.34% Zn, 0.23% Pb, and 0.09% Sn) over 33.23m from
371.50m to 386.58m,
132.43 g Ag eq/t (16.72 g Ag/t, 0.30% Zn, 0.10% Pb, and 0.16% Sn) over 25.36m from
398.61m to 423.97m, and,
197.26 g Ag eq/t (5.25 g Ag/t, 0.73% Zn, 0.08% Pb, and 0.26% Sn) over 23.63m from
483.64m to 507.27m.
Hole DHK-14, which was collared 100m northwest of Hole DSB-24, intersected 29 reportable
intersections of which the best results were as follows:
87.26 g Ag eq/t (17.05 g Ag/t, 0.06 g Au/t, 0.51% Pb and 0.28% Cu) over 37.57m from
120.36m to 157.93m
58.63 g Ag eq/t (5.26 g Ag/t, 0.31%Zn and 0.21% Pb) over 33.11m from 314.33m to
347.44m, including a higher-grade section with 96.83 g Ag eq/t (7.83 g Ag/t, 0.57%Zn,
0.25% Pb and 0.09% Sn) over 10.54m from 314.33m to 324.87m
87.26 g Ag eq/t (17.05 g Ag/t, 0.06 g Au/t, 0.51% Pb and 0.28% Cu) over 37.57m from
120.36m to 157.93m
185.94 g Ag eq/t (10.38 g Ag/t, 0.09 g Au/t, 1.43% Zn, 0.20% Pb, 0.09% Cu and 0.14%
Sn) over 16.86m from 597.64m to 614.50m
Hole DHK-22 is the most northwesterly drill hole completed thus far, approximately 1,000m (1km)
northwest of the Santa Barbara Drill Bay (see Figure 2). There were 10 reportable intersections
returned from this hole with the best results as follows:
70.09 g Ag eq/t (2.99 g Ag/t and 0.42% Cu over 28.73m from 38.77m to 67.50m
including 110.81 g Ag eq/t (2.75 g Ag/t and 0.75% Cu) over 12.15m from 52.33m to
64.48m
107.19 g Ag eq/t (11.81 g Ag/t, 0.12 g Au/t, 0.23% Zn, 0.13% Cu and 0.10 %Sn) over
46.38m from 479.32m to 525.70m including 398.55 g Ag eq/t (39.32 g Ag/t, 0.18% Zn.
0.50% Cu and 0.46% Sn) over 7.50m from 479.32m to 486.82m
5 | Page
Table 1: Significant Results, Underground Diamond Drilling, Santa Barbara Resource
Definition Target Area as at April 27, 2022.
Note: True width of the mineralization is not known at the present time, but based on the current
understanding of the relationship between drill orientation/inclination and the mineralization within
the breccia pipes and the host rocks such as sandstones and dacites, it is estimated that true
width ranges between 70% and 90% of the down hole interval length but this will be confirmed
by further drilling and geological modelling.
Chemical symbols: Ag= silver, Au = gold, Zn = zinc, Pb = lead, Cu = copper, Sn = tin, Bi =
bismuth, Cd = cadmium and g Ag eq/t = grams silv er equivalent per tonne. Quantities are given
in percent (%) for Zn, Pb Cu, Sn, Bi and Cd and in grams per tonne (g/t) for Ag, Au and Ag eq.
Metal prices and conversion factors used for calculation of g Ag eq/t (grams Ag per grams x metal
ratio) are as follows (Prices updated as of February 1, 2022, to more accurately reflect current
metal prices):
Ag Au Zn Pb Cu Sn Bi Cd Ag eq
g / t g / t %%%%%% g / t
DSBU‐06 0.00 235.55 235.55 64.30 0.09 0.69 0.37 0.06 0.07 0.016 0.007 169.11
Incl. 24.40 75.08 50.68 192.18 0.22 0.07 0.41 0.09 0.11 0.059 0.005 314.52
264.14 392.58 128.44 17.38 0.09 0.30 0.21 0.01 0.11 0.002 0.001 110.57
Incl. 274.69 292.86 18.17 11.62 0.01 0.45 0.32 0.01 0.25 0.001 0.002 190.81
Incl. 319.04 331.03 11.99 14.87 0.01 0.28 0.25 0.02 0.26 0.001 0.001 193.82
401.61 415.13 13.52 47.18 0.09 0.58 0.09 0.01 0.03 0.003 0.002 101.67
421.19 434.67 13.48 12.23 0.01 0.40 0.11 0.01 0.02 0.002 0.002 50.62
445.18 482.80 37.62 19.38 0.04 0.84 0.16 0.01 0.06 0.002 0.002 104.11
497.86 520.48 22.62 22.32 0.04 0.51 0.11 0.01 0.03 0.013 0.001 71.31
528.92 592.30 63.38 9.91 0.21 0.54 0.14 0.01 0.04 0.002 0.002 80.81
DSBU‐05 0.00 153.25 153.25 22.99 0.07 0.18 0.16 0.21 0.12 0.010 0.003 141.05
Incl. 0.00 34.97 34.97 21.77 0.06 0.36 0.30 0.63 0.11 0.007 0.003 201.23
Incl. 76.94 85.99 9.05 24.52 0.18 0.14 0.16 0.11 0.23 0.013 0.004 206.03
Incl. 109.93 135.53 25.60 31.67 0.04 0.23 0.19 0.17 0.28 0.014 0.001 242.83
190.40 212.94 22.54 6.06 0.04 0.42 0.41 0.02 0.04 0.013 0.012 73.74
229.48 235.54 6.06 6.19 0.02 0.43 0.10 0.05 0.05 0.004 0.003 67.75
249.08 261.10 12.02 18.11 0.27 0.07 0.23 0.02 0.01 0.005 0.011 62.92
285.03 306.00 20.97 57.04 0.06 0.06 0.14 0.04 0.03 0.008 0.007 94.58
249.08 261.10 12.02 18.11 0.27 0.07 0.23 0.02 0.01 0.005 0.011 62.92
348.08 526.17 178.09 23.86 0.03 0.96 0.21 0.01 0.02 0.013 0.004 92.47
535.29 541.40 6.11 6.68 0.09 0.84 0.12 0.00 0.05 0.004 0.002 85.49
551.91 553.44 1.53 26.00 0.09 2.56 0.08 0.01 0.05 0.038 0.007 189.67
583.55 585.04 1.49 2.00 0.03 1.44 0.01 0.01 0.02 0.001 0.004 84.03
605.90 610.32 4.42 4.61 0.05 2.00 0.04 0.01 0.01 0.001 0.007 111.87
SANTA BARBARA RESOURCE DEFINITION TARGET ZONE
UNDERGROUND DRILL HOLES ‐ SANTA BARBARA ADIT
Hole No. From (m) To (m) Length (m)
6 | Page
Element Price $US
(per kg)
Ratio to
Ag
Ag $722.56 1.0000
Sn $42.56 0.0589
Zn $3.30 0.0046
Pb $2.33 0.0032
Au $57,604.00 79.7221
Cu $9.68 0.0134
Bi $12.76 0.0177
Cd $5.50 0.0076
In calculating the intersections reported in this press release a sample cutoff of 30 g Ag eq/t was
used with generally a maximum dilution of 3 continuous samples below cutoff included within a
mineralized section unless more dilution is justified geologically.
The equivalent grade calculations are based on the stated metal prices and are provided for
comparative purposes only, due to the polymetallic nature of the deposit. Metallurgical tests are
in progress by Blue Coast Ltd. to establish levels of recovery for each element reported but
currently the potential recovery for each element has not yet been established. While there is no
assurance that all or any of the reported concentrations of metals will be recoverable, Bolivia has
a long history of successfully mining and processing similar polymetallic deposits which is well
documented in the landmark volume “Yacimientos Metaliferos de Bolivia” by Dr. Osvaldo R. Arce
Burgoa, P.Geo.
7 | Page
Table 2: Significant Results, Surface Diamond Drilling, Santa Barbara Resource
Definition Target Area as at April 27, 2022.
See Note Table 1.
Ag Au Zn Pb Cu Sn Bi Cd Ag eq
g / t g / t %%%%%% g / t
DSBS‐01 13.42 30.29 16.87 0.91 0.01 0.00 0.01 0.00 0.09 0.001 0.001 52.59
58.66 90.94 32.28 2.07 0.01 0.00 0.03 0.00 0.27 0.001 0.001 163.23
Incl. 63.15 70.76 7.61 3.73 0.02 0.00 0.04 0.01 0.94 0.001 0.001 560.74
98.94 100.45 1.51 4.00 0.01 0.00 0.03 0.01 0.09 0.001 0.001 61.61
225.36 247.94 22.58 2.94 0.01 0.03 0.14 0.30 0.01 0.001 0.001 54.95
Incl. 225.36 228.40 3.04 3.00 0.01 0.07 0.07 0.88 0.00 0.001 0.001 129.69
270.52 271.95 1.43 5.00 0.02 0.04 1.41 0.02 0.02 0.001 0.001 64.90
285.56 329.16 43.60 5.36 0.03 0.85 0.44 0.02 0.05 0.002 0.010 90.79
Incl. 294.43 299.02 4.59 2.01 0.07 1.36 0.49 0.05 0.09 0.004 0.012 146.04
Incl. 320.19 329.16 8.97 12.68 0.03 1.95 0.93 0.01 0.11 0.001 0.012 200.55
344.23 345.57 1.34 1.00 0.01 1.10 0.26 0.00 0.01 0.001 0.006 67.32
357.63 359.19 1.56 3.00 0.01 1.31 0.27 0.00 0.01 0.001 0.002 75.16
374.14 375.69 1.55 2.00 0.02 1.35 0.28 0.01 0.00 0.001 0.004 76.69
414.88 470.51 55.63 6.66 0.03 1.80 0.40 0.03 0.00 0.003 0.005 110.40
Incl. 416.39 420.84 4.45 28.05 0.19 4.99 1.26 0.22 0.01 0.032 0.019 351.80
Incl. 437.41 446.45 9.04 4.34 0.01 2.95 0.32 0.01 0.00 0.001 0.008 153.44
484.02 485.54 1.52 3.00 0.01 1.27 0.14 0.01 0.00 0.001 0.003 68.15
491.56 523.27 31.71 12.96 0.11 1.43 0.43 0.02 0.01 0.004 0.005 108.55
Incl. 509.62 520.25 10.63 27.91 0.25 2.29 0.89 0.03 0.01 0.008 0.009 192.64
541.79 549.58 7.79 2.69 0.01 1.38 0.10 0.00 0.00 0.001 0.005 72.22
591.69 594.70 3.01 3.51 0.02 1.24 0.13 0.01 0.00 0.001 0.003 68.82
599.26 600.79 1.53 13.00 0.13 4.03 0.32 0.01 0.01 0.003 0.018 224.85
611.34 636.83 25.49 8.94 0.03 1.02 0.20 0.01 0.00 0.001 0.003 68.66
Incl. 627.90 636.83 8.93 19.98 0.04 1.65 0.35 0.01 0.00 0.003 0.006 114.99
668.88 670.41 1.53 111.00 0.01 0.27 3.64 0.00 0.00 0.001 0.001 242.99
683.93 689.86 5.93 9.73 0.11 2.69 0.35 0.02 0.00 0.003 0.013 157.74
SANTA BARBARA RESOURCE DEFINITION TARGET ZONE
SURFACE DIAMOND DRILLING ‐ SOUTH SANTA BARBARA AREA
Hole No. From (m) To (m) Length (m)
8 | Page
Table 3: Significant Results, Surface Diamond Drilling, Santa Barbara Resource
Definition Target Area – Northwest Extension as at April 27, 2022.
See Note Table 1.
Ag Au Zn Pb Cu Sn Bi Cd Ag eq
g / t g / t %%%%%% g / t
DSB‐14 60.17 61.69 1.52 9.00 2.08 0.00 0.03 0.04 0.00 0.001 0.001 182.35
82.80 84.44 1.64 27.00 0.39 0.00 0.02 0.04 0.00 0.001 0.001 65.49
97.86 100.83 2.97 68.63 0.01 0.00 0.13 0.16 0.00 0.001 0.001 97.15
120.36 157.93 37.57 17.15 0.06 0.01 0.51 0.28 0.02 0.004 0.001 87.26
180.45 196.91 16.46 7.95 0.04 0.01 0.19 0.26 0.01 0.001 0.001 58.44
202.91 213.55 10.64 8.75 0.01 0.01 0.21 0.15 0.04 0.001 0.001 62.48
231.57 236.38 4.81 2.01 0.01 0.04 0.17 0.29 0.01 0.001 0.005 54.82
267.76 293.36 25.60 1.57 0.01 0.71 0.19 0.01 0.02 0.001 0.003 54.95
314.33 347.44 33.11 5.26 0.01 0.31 0.21 0.01 0.05 0.001 0.004 58.63
Incl. 314.33 324.87 10.54 7.83 0.02 0.57 0.25 0.01 0.09 0.001 0.003 96.83
367.01 368.54 1.53 8.00 0.01 0.26 0.58 0.01 0.09 0.004 0.005 91.01
382.18 389.59 7.41 23.89 0.01 0.32 0.12 0.01 0.07 0.003 0.001 87.18
398.65 410.68 12.03 26.58 0.06 0.14 0.05 0.01 0.04 0.003 0.001 65.02
430.28 431.78 1.50 6.00 0.60 0.15 0.19 0.02 0.03 0.008 0.001 85.91
448.25 454.20 5.95 3.98 0.03 0.68 0.20 0.02 0.02 0.001 0.002 58.96
464.72 467.78 3.06 18.83 0.01 1.24 0.99 0.02 0.04 0.001 0.006 137.60
475.27 478.20 2.93 5.47 0.01 0.58 1.12 0.00 0.01 0.001 0.041 76.07
481.22 482.72 1.50 9.00 0.02 0.01 0.19 0.00 0.02 0.001 0.010 77.26
518.20 521.07 2.87 29.09 0.10 0.40 1.19 0.01 0.45 0.003 0.008 360.91
528.61 530.10 1.49 8.00 0.03 0.16 0.25 0.02 0.10 0.001 0.011 89.86
549.27 555.12 5.85 6.62 0.01 0.27 0.21 0.02 0.06 0.001 0.001 67.81
567.11 570.11 3.00 7.82 0.02 0.64 0.16 0.02 0.07 0.001 0.003 86.20
597.64 614.50 16.86 10.38 0.09 1.43 0.20 0.09 0.14 0.007 0.005 185.94
632.50 633.92 1.42 7.00 0.05 1.27 0.08 0.07 0.06 0.002 0.001 118.00
650.26 654.83 4.57 4.90 0.05 1.41 0.09 0.11 0.03 0.002 0.001 112.37
841.10 842.60 1.50 4.00 0.02 0.18 0.04 0.45 0.02 0.002 0.001 85.19
884.56 886.05 1.49 1.00 0.05 0.49 0.03 0.14 0.02 0.023 0.002 64.76
889.06 890.56 1.50 4.00 0.02 0.76 0.14 0.15 0.03 0.007 0.002 81.53
893.59 895.06 1.47 5.00 0.02 0.73 0.19 0.23 0.02 0.005 0.003 89.45
955.14 959.62 4.48 2.33 0.06 0.09 0.02 0.17 0.00 0.153 0.001 63.84
SANTA BARBARA RESOURCE DEFINITION TARGET ZONE
SURFACE DIAMOND DRILLING ‐ NORTHWEST EXTENSION
Hole No. From (m) To (m) Length (m)