Eloro Resources’ drill hole DSB-47 intersects 114g Ag eq/t (9.90g Ag/t, 0.12 g Au/t, 0.96% Zn, and 0.68% Pb) over 320.97m in the Santa Barbara High-Grade Zone, at the Iska Iska Silver- Tin Polymetallic Project, Potosi Department, Bolivia
Eloro Resources’ drill hole DSB-47 intersects 114g Ag eq/t (9.90g Ag/t, 0.12 g Au/t, 0.96% Zn,
and 0.68% Pb) over 320.97m in the Santa Barbara High-Grade Zone, at the Iska Iska Silver-
Tin Polymetallic Project, Potosi Department, Bolivia
Holes DSB-50, DSB-51 and DSB-52, the southernmost holes that tested the potential south-
southeastern extension of the High-Grade Zone at Sa nta Barbara, each returned well
mineralized intersections over 100m core length as follows:
o 86.67g Ag eq/t (13.57g Ag/t, 0.99% Zn and 0.41% Pb) over 105.42m including
193.50 g Ag eq/t (15.34g Ag/t, 3.22% Zn and 0.17% Pb) over 10.57m (DSB-50)
o 103.03g Ag eq/t (5.18g Ag/t, 1.72% Zn and 0.21% Pb) over 143.06m including
175.06 g Ag eq/t (9.39g Ag/t, 2.96% Zn and 0.35% Pb) over 49.87m (DSB-51)
o 123.28g Ag eq/t (7.46g Ag/t, 0.14 g Au/t, 1.85% Zn and 0.26% Pb) over 119.77m
including 306.28 g Ag eq/t (18.03g Ag/t, 0.45g Au/t, 4.55% Zn and 0.47% Pb) over
28.79m (DSB-52)
o Drill holes in the south-southeastern extension of the Santa Barbara Deposit are
notably Zn-rich returning some of the highest Zn values intersected thus far.
o These three holes expand the strike extent of the Santa Barbara High-Grade Zone
to more than 1,100m significantly expanding the potential open pittable resource.
The High-Grade zone is now 800m across and is open along strike to the south-
southeast.
Toronto, Canada, April 12, 2023 – Eloro Resources L td. (TSX: ELO; OTCQX: ELRRF; FSE:
P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from the last eight (8)
diamond drill holes from the definition drill progr am at Santa Barbara in the Iska Iska silver-tin
polymetallic project in the Potosi Department, southern Bolivia. Two (2) of these drill holes (DSB-45
and DSB-47) filled in gaps in previous drilling of the High-Grade Zone . The remaining six (6) holes
(DSB-44. DSB-48, DSB-49, DSB-50, DSB-51 and DSB-52) tested the potential south-southeastern
extension of the High-Grade Zone at Santa Barbara.
As previously reported in Eloro’s press release dated November 27, 2022, the Company completed
84,495m of drilling in 122 holes to complete the definition drill program in the Santa Barbara target
area, as shown in Figure 1. Tables 1 and 2 list si gnificant assay results for the reported drill holes.
Prices used for calculating Ag equivalent grades are as outlined in Eloro’s July 21, 2022 press release
to maintain consistency with Ag equivalent calculations in previous releases.
Tom Larsen, CEO of Eloro, said: “These latest results, which complete the Santa Barbara definition
diamond drill program, have significantly expanded the potential open pittable resource across the
valley of the Iska Iska Caldera. Micon International Limited (”Micon”) will be updating the deposit’s
inaugural mineral resource model to incorporate the se new results. Our geological technical team
led by Dr. Bill Pearson, P.Geo. and Dr. Osvaldo Arce, P.Geo., is working closely with Micon to ensure
all required information is completed. As recently reported (see Eloro’s press release dated April 4,
2023) additional metallurgical testing is being car ried out under the direction of Mike Hallewell,
C.Eng., Eloro’s Senior Strategic Metallurgist.”
20 Adelaide Street East, Suite 200, Toronto, Ontari o CANADA M5C 2T6 Tel.: (416) 868-9168
TSX Symbol: ELO www.elororesources.com
2 | P a g e
Dr. Bill Pearson, P.Geo., Eloro’s Executive Vice Pr esident, Exploration commented: “Drilling is
advancing in the Casiterita area as previously outl ined to test for the potential tin porphyry (see
Eloro’s February 14, 2023 press release). To date, a total of 3,302 metres of diamond drilling has
been completed in 9 holes, including two in progress. Assay results from these holes are pending.
We have also completed additional surface induced polarization/resistivity (“IP/Res”) surveys on the
western side of Santa Barbara. Bore hole IP/Res (“BHIP”) surveys continue to be carried out on drill
holes as holes are completed. Regional geological, prospecting and sampling, along with ground
magnetic surveys, are being carried out on Eloro’s large land package in the Iska Iska area (see
Eloro press release dated November 22, 2022).”
Santa Barbara Definition Drilling
Hole DSB-47 was drilled to test the area immediately southwest of the Santa Barbara Breccia Pipe
(“SBBP”) (Figure 1) and returned a 321m long inters ection with a number of higher-grade intervals
as follows:
114g Ag eq/t (9.90g Ag/t, 0.12 g Au/t, 0.96% Zn, and 0.68% Pb) over 320.97m from 59.40m
to 380.37m, including higher-grade portions of:
o 232.30 g Ag eq/t (29.86g Ag/t, 0.22 g Au/t, 0.63% Z n, 2.18% Pb, 0.30% Cu and
0.10%Sn) over 32.02m from 60.90m to 92.92m
o 147.06 g Ag eq/t (5.41g Ag/t, 1.90% Zn and 0.90% Pb) over 10.66m from 133.89m
to 144.55m
o 184.83 g Ag eq/t (36.83g Ag/t, 1.81% Zn and 1.13% Pb) over 23.82m from 170.30m
to 194.12m
o 243.09 g Ag eq/t (4.48g Ag/t, 0.95 g Au/t, 2.02% Z n and 0.81% Pb) over 13.68m
from 218.45m to 232.13m and
o 249.06g Ag eq/t (18.48g Ag/t, 0.10 g Au/t, 2.34% Zn, 1.74% Pb and 0.11% Sn) over
24.30m from 285.25m to 309.55m
Six (6) holes (DSB-44. DSB-48, DSB-49, DSB-50, DSB- 51 and DSB-52) tested the potential
south-southeastern extension of the High-Grade Zone at Santa Barbara. All these holes, which
were drilled at an azimuth of 225 0 with a dip of -60 0, tested and confirmed an additional 300m of
potential strike length to the south-southeast. Co llectively, these holes intersected many
significant intersections within altered and mineralized dacite porphyry, dacite and dacitic breccia.
The most significant holes are the most southernmost three, DSB-50, DSB-51 and DSB-52, which
each returned well mineralized intersections over 100m in core length as follows:
86.67g Ag eq/t (13.57g Ag/t, 0.99% Zn and 0.41% Pb) over 105.42m including 193.50 g
Ag eq/t (15.34g Ag/t, 3.22% Zn and 0.17% Pb) over 10.57m (DSB-50)
103.03g Ag eq/t (5.18g Ag/t, 1.72% Zn and 0.21% Pb) over 143.06m including 175.06 g
Ag eq/t (9.39g Ag/t, 2.96% Zn and 0.35% Pb) over 49.87m (DSB-51)
123.28g Ag eq/t (7.46g Ag/t, 0.14 g Au/t, 1.85% Zn and 0.26% Pb) over 119.77m including
306.28 g Ag eq/t (18.03g Ag/t, 0.45g Au/t, 4.55% Zn and 0.47% Pb) over 28.79m (DSB-
52)
Drill holes in the south-southeastern extension of the Santa Barbara Deposit are notably Zn-rich
returning some of the highest Zn values intersected thus far. These three holes expand the strike
extent of the Santa Barbara High-Grade Zone to more than 1,100m significantly expanding the
3 | P a g e
potential open pittable resource. The High-Grade z one is now 800m across and is open along
strike to the south-southeast .
In addition to the results cited above, all six holes drilled in the southeasternmost part of the target
area returned numerous additional reportable intersections which are listed in detail in Table 2.
Figure 1 – Geological Plan Map showing Drilling in Santa Barbara Area with Holes referred
to in this release highlighted.
4 | P a g e
Table 1: Significant Results, Fill-in Surface Diamond Drilling Santa Barbara Deposit as at
April 12, 2023.
Ag Au Zn Pb Cu Sn Bi Cd Ag eq
g/t g/t % % % % % % g/t
DSB-47 14.12 20.13 6.01 3.00 0.18 0.02 0.42 0.07 0.01 0.001 0.001 45. 31
35.10 38.13 3.03 5.02 0.16 0.06 0.77 0.02 0.04 0.001 0.001 63. 85
59.40 380.37 320.97 9.90 0.12 0.96 0.68 0.06 0.04 0.007 0.006 114.00
Incl. 60.90 92.92 32.02 29.86 0.22 0.63 2.18 0.30 0.10 0.037 0.008 2 32.30
Incl. 133.89 144.55 10.66 5.41 0.02 1.90 0.90 0.02 0.04 0.002 0.008 147.06
Incl. 170.30 194.12 23.82 36.83 0.02 1.81 1.13 0.02 0.04 0.007 0.00 9 184.83
Incl. 218.45 232.13 13.68 4.48 0.95 2.02 0.81 0.03 0.05 0.012 0.021 243.09
Incl. 285.25 309.55 24.30 18.48 0.10 2.34 1.74 0.03 0.11 0.012 0.01 1 249.06
407.54 443.53 35.99 60.46 0.04 0.17 0.04 0.03 0.06 0.016 0.00 1 102.52
449.57 502.90 53.33 19.32 0.03 0.12 0.02 0.02 0.05 0.004 0.00 1 48.36
523.78 544.27 20.49 46.60 0.33 0.18 0.03 0.05 0.06 0.038 0.00 1 122.11
552.01 553.45 1.44 49.00 0.11 0.08 0.02 0.04 0.04 0.025 0.001 89.83
558.01 565.49 7.48 5.57 0.03 0.11 0.02 0.02 0.05 0.010 0.001 4 0.35
570.00 571.54 1.54 22.00 0.03 0.03 0.01 0.04 0.06 0.010 0.001 56.27
577.49 579.02 1.53 65.00 0.53 0.08 0.14 0.07 0.15 0.136 0.001 217.80
589.56 595.70 6.14 16.63 0.12 0.04 0.03 0.02 0.05 0.029 0.001 57.26
602.08 603.62 1.54 1.00 0.01 0.05 0.02 0.00 0.13 0.001 0.001 5 6.14
606.71 609.71 3.00 5.47 0.18 0.03 0.03 0.02 0.04 0.034 0.001 4 8.22
612.72 615.73 3.01 0.75 0.01 0.02 0.01 0.01 0.11 0.001 0.001 4 5.72
618.73 620.27 1.54 0.50 0.01 0.02 0.01 0.01 0.12 0.001 0.001 5 0.24
626.26 627.77 1.51 2.00 0.01 0.01 0.01 0.01 0.11 0.001 0.001 4 8.49
639.90 641.45 1.55 1.00 0.01 0.60 0.01 0.00 0.04 0.001 0.002 4 6.31
654.89 656.38 1.49 7.00 0.16 0.12 0.01 0.06 0.08 0.009 0.001 6 6.86
669.92 671.43 1.51 1.00 0.03 0.07 0.01 0.01 0.11 0.001 0.001 5 2.02
701.66 704.66 3.00 5.93 0.11 0.26 0.03 0.03 0.29 0.005 0.001 1 45.91
719.59 721.09 1.50 3.00 0.16 0.21 0.03 0.07 0.09 0.036 0.001 7 7.56
773.78 778.30 4.52 1.33 0.13 0.06 0.05 0.00 0.08 0.047 0.001 6 0.85
839.96 841.43 1.47 16.00 0.09 0.04 0.02 0.08 0.08 0.007 0.001 68.49
853.45 859.50 6.05 6.95 0.19 0.19 0.02 0.04 0.02 0.012 0.001 4 7.65
872.88 874.40 1.52 6.00 0.03 0.02 0.00 0.32 0.04 0.021 0.001 6 5.14
888.02 892.58 4.56 5.97 0.22 0.16 0.02 0.09 0.02 0.022 0.001 5 8.69
934.63 936.15 1.52 1.00 0.27 0.00 0.00 0.02 0.01 0.092 0.001 5 0.88
966.19 967.73 1.54 1.00 0.65 0.01 0.00 0.01 0.01 0.002 0.001 6 4.93
973.69 982.69 9.00 1.74 0.29 0.01 0.00 0.08 0.01 0.050 0.001 5 3.07
Hole No. From (m) To (m) Length (m)
5 | P a g e
Table 1 (con’t) -
Note: True width of the mineralization is not known at th e present time, but based on the current
understanding of the relationship between drill ori entation/inclination and the mineralization within
the breccia pipes and the host rocks such as sandstones and dacites, it is estimated that true width
ranges between 70% and 90% of the down hole interval length but this will be confirmed by further
drilling and geological modelling.
Chemical symbols: Ag= silver, Au = gold, Zn = zinc, Pb = lead, Cu = copper, Sn = tin, Bi = bismuth,
Cd = cadmium and g Ag eq/t = grams silver equivalent per tonne. Quantities are given in percent (%)
for Zn, Pb Cu, Sn, Bi and Cd and in grams per tonne (g/t) for Ag, Au and Ag eq.
Metal prices and conversion factors used for calcul ation of g Ag eq/t (grams Ag per grams x metal
ratio) are as follows: (Prices updated as of July 2 1, 2022, to more accurately reflect current metal
prices):
Element Price $US (per kg) Ratio to Ag
Ag $607.00 1.0000
Sn $23.55 0.0589
Zn $2.98 0.0046
Pb $1.92 0.0032
Au $54,932.80 79.7221
Cu $7.00 0.0134
Bi $12.76 0.0177
Cd $5.50 0.0076
Ag Au Zn Pb Cu Sn Bi Cd Ag eq
g/t g/t % % % % % % g/t
DSB-45 14.40 15.75 1.35 14.00 0.04 0.00 0.38 0.01 0.13 0.011 0.001 82 .58
57.15 58.65 1.50 27.00 0.03 0.00 0.29 0.01 0.02 0.014 0.001 49 .73
69.30 84.57 15.27 11.72 0.01 0.00 0.22 0.01 0.05 0.003 0.001 4 0.33
92.45 95.63 3.18 20.09 0.05 0.01 0.60 0.03 0.21 0.036 0.001 13 5.39
104.68 124.58 19.90 24.67 0.06 0.00 0.21 0.02 0.03 0.001 0.00 1 48.28
139.70 157.37 17.67 21.74 0.10 0.01 0.33 0.01 0.01 0.001 0.00 1 46.54
161.89 164.98 3.09 8.49 0.28 0.00 0.42 0.01 0.00 0.001 0.001 4 9.54
172.53 177.26 4.73 31.95 0.18 0.01 0.17 0.01 0.03 0.066 0.001 80.33
197.00 206.45 9.45 18.86 0.04 0.00 0.04 0.01 0.05 0.001 0.001 43.57
230.67 239.67 9.00 2.12 0.02 0.51 0.06 0.01 0.02 0.001 0.004 4 0.74
280.28 305.84 25.56 10.17 0.07 0.02 0.03 0.08 0.09 0.008 0.00 1 64.68
Incl. 298.27 302.82 4.55 21.75 0.20 0.03 0.03 0.27 0.27 0.037 0.001 186.19
316.46 339.21 22.75 30.04 0.01 0.01 0.01 0.05 0.06 0.010 0.00 1 62.73
354.21 360.31 6.10 6.76 0.04 0.05 0.02 0.12 0.19 0.001 0.001 1 03.32
413.20 417.70 4.50 21.33 0.03 0.03 0.00 0.06 0.09 0.005 0.001 67.39
443.40 444.91 1.51 2.00 0.01 0.31 0.03 0.06 0.05 0.001 0.001 4 7.17
450.90 455.40 4.50 10.86 0.03 0.01 0.01 0.01 0.13 0.007 0.001 69.23
464.42 465.97 1.55 5.00 0.02 0.02 0.01 0.06 0.10 0.008 0.001 5 6.18
506.84 509.86 3.02 15.00 0.39 0.20 0.05 0.29 0.27 0.003 0.001 201.22
517.45 519.01 1.56 7.00 0.39 0.11 0.04 0.01 0.02 0.003 0.001 5 6.84
526.47 531.00 4.53 7.00 0.17 0.19 0.05 0.01 0.03 0.003 0.001 4 7.20
578.10 592.40 14.30 15.88 0.11 0.21 0.02 0.14 0.13 0.031 0.00 2 107.89
Incl. 584.05 589.35 5.30 19.23 0.08 0.33 0.02 0.32 0.30 0.013 0.002 198.35
608.89 622.54 13.65 4.83 0.09 0.14 0.01 0.06 0.04 0.010 0.001 43.15
672.53 674.06 1.53 11.00 0.13 0.88 0.04 0.03 0.03 0.003 0.005 82.53
686.18 687.65 1.47 15.00 0.13 0.03 0.08 0.09 0.10 0.007 0.001 80.58
693.70 695.20 1.50 0.50 0.66 0.03 0.02 0.04 0.00 0.001 0.001 6 7.92
716.50 724.05 7.55 4.78 1.10 0.24 0.02 0.04 0.04 0.169 0.001 1 71.18
790.55 799.68 9.13 7.14 0.06 0.01 0.01 0.14 0.12 0.079 0.001 9 0.87
805.78 807.25 1.47 5.00 3.40 0.36 0.01 0.01 0.01 0.151 0.001 3 66.52
817.74 819.26 1.52 1.00 1.95 0.04 0.00 0.02 0.03 0.091 0.001 2 10.52
Hole No. From (m) To (m) Length (m)
6 | P a g e
In calculating the intersections reported in this p ress release a sample cutoff of 30 g Ag eq/t was
used with generally a maximum dilution of 3 continu ous samples below cutoff included within a
mineralized section unless more dilution is justified geologically.
The equivalent grade calculations are based on the stated metal prices and are provided for
comparative purposes only, due to the polymetallic nature of the deposit. Metallurgical tests are in
progress by Blue Coast Research to establish levels of recovery for each element reported. The
preliminary phase of Ag, Zn and Pb testwork is complete but additional development and optimization
will be required. Metallurgical testing is in prog ress to establish Sn recovery. Future geo-
metallurgical programs will also include studies to understand the deportment of other potential
metals such as gold, copper, bismuth and indium. While there is no assurance that all or any of the
reported concentrations of metals will be recoverab le, Bolivia has a long history of successfully
mining and processing similar polymetallic deposits which is well documented in the landmark volume
“Yacimientos Metaliferos de Bolivia ” by Dr. Osvaldo R. Arce Burgoa, P.Geo.
7 | P a g e
Table 2: Significant Results, Definition Surface Diamond Drilling South-Southeastern
Extension Santa Barbara Deposit as at April 11, 2023.
Ag Au Zn Pb Cu Sn Bi Cd Ag eq
g/t g/t % % % % % % g/t
DSB-44 30.72 32.20 1.48 0.50 0.51 0.02 0.02 0.01 0.01 0.001 0.001 54. 61
74.27 77.22 2.95 3.10 0.01 1.11 0.15 0.01 0.02 0.001 0.002 70. 58
116.55 118.02 1.47 3.00 0.01 1.24 0.17 0.01 0.01 0.001 0.004 7 5.40
122.53 125.54 3.01 6.01 0.01 1.82 0.22 0.04 0.01 0.001 0.006 1 14.11
136.08 137.57 1.49 7.00 0.02 1.77 0.48 0.01 0.00 0.001 0.005 1 13.23
216.26 241.83 25.57 5.95 0.03 1.42 0.24 0.02 0.01 0.002 0.005 92.71
256.90 264.36 7.46 0.89 0.03 1.99 0.43 0.01 0.01 0.001 0.006 1 19.73
271.92 276.43 4.51 1.51 0.06 0.47 0.08 0.07 0.01 0.011 0.002 4 5.10
291.52 300.53 9.01 5.67 0.04 1.13 0.27 0.02 0.01 0.001 0.004 7 8.77
332.08 336.60 4.52 3.99 0.01 0.59 0.27 0.01 0.01 0.001 0.003 4 6.16
347.09 389.20 42.11 5.85 0.17 1.10 0.26 0.02 0.01 0.005 0.005 90.53
Incl. 380.25 389.20 8.95 10.59 0.56 1.67 0.62 0.03 0.01 0.020 0.007 175.29
416.30 425.40 9.10 5.16 0.02 0.96 0.12 0.01 0.01 0.001 0.004 6 3.12
436.06 472.20 36.14 7.01 0.03 1.22 0.14 0.01 0.01 0.001 0.007 80.71
Incl. 439.06 445.15 6.09 12.07 0.11 2.75 0.27 0.01 0.01 0.001 0.018 171.92
Incl. 464.62 469.13 4.51 7.53 0.01 1.45 0.24 0.02 0.03 0.001 0 .004 102.66
478.46 487.40 8.94 8.98 0.08 0.99 0.16 0.01 0.01 0.001 0.005 7 6.33
499.49 525.13 25.64 11.41 0.03 1.04 0.29 0.01 0.03 0.001 0.00 4 87.00
Incl. 499.49 508.52 9.03 22.37 0.06 1.71 0.60 0.02 0.03 0.001 0.009 144.05
534.16 544.69 10.53 5.45 0.02 0.56 0.10 0.01 0.02 0.001 0.002 48.25
547.80 567.30 19.50 6.54 0.12 0.72 0.07 0.02 0.04 0.001 0.003 72.23
574.84 576.34 1.50 18.00 0.22 2.49 0.42 0.03 0.07 0.001 0.010 204.13
583.86 586.82 2.96 6.52 0.01 1.21 0.12 0.01 0.03 0.001 0.004 8 3.80
598.90 603.39 4.49 24.73 0.25 0.51 0.18 0.03 0.09 0.001 0.001 117.24
619.93 630.64 10.71 12.39 0.12 0.88 0.03 0.02 0.03 0.004 0.00 1 80.09
634.94 636.44 1.50 11.00 0.09 0.30 0.03 0.02 0.04 0.001 0.001 52.06
706.11 709.22 3.11 4.68 0.09 1.57 0.04 0.02 0.05 0.001 0.006 1 14.27
730.20 736.28 6.08 4.51 0.08 0.21 0.00 0.03 0.06 0.001 0.001 4 9.75
748.30 769.47 21.17 7.34 0.04 0.52 0.02 0.01 0.03 0.001 0.002 50.23
787.70 833.13 45.43 10.17 0.14 0.36 0.13 0.01 0.10 0.001 0.00 2 83.94
Incl. 824.04 830.07 6.03 26.60 0.09 0.53 0.23 0.01 0.22 0.001 0.003 155.60
869.40 870.90 1.50 47.00 0.03 0.08 0.03 0.16 0.16 0.023 0.001 140.96
931.33 932.83 1.50 2.00 1.57 0.02 0.01 0.01 0.00 0.001 0.001 1 47.71
944.92 946.46 1.54 3.00 0.40 0.33 0.00 0.02 0.01 0.001 0.002 59.87
Hole No. From (m) To (m) Length (m)
8 | P a g e
Table 2 (con’t) –
Ag Au Zn Pb Cu Sn Bi Cd Ag eq
g/t g/t % % % % % % g/t
DSB-48 0.00 1.59 1.59 3.50 0.01 0.01 0.02 0.00 0.12 0.001 0.001 52.48
76.14 79.13 2.99 36.17 0.32 0.09 0.81 1.10 0.01 0.127 0.003 25 1.50
132.07 133.54 1.47 1.10 0.50 0.55 0.07 0.18 0.00 0.005 0.001 9 8.73
151.55 154.57 3.02 1.05 0.05 1.14 0.05 0.03 0.00 0.001 0.003 6 8.53
210.44 217.93 7.49 7.88 0.11 2.38 0.22 0.21 0.00 0.001 0.012 1 68.86
287.40 306.97 19.57 18.21 0.07 1.15 0.19 0.19 0.00 0.020 0.00 4 114.11
342.90 345.90 3.00 8.30 0.05 1.47 0.21 0.06 0.00 0.001 0.005 9 9.52
386.60 443.60 57.00 10.62 0.59 0.88 0.14 0.19 0.00 0.026 0.00 5 141.41
Incl. 415.04 425.66 10.62 27.98 1.54 1.82 0.32 0.57 0.01 0.06 6 0.010 348.43
Incl. 437.58 443.60 6.02 33.43 2.40 2.07 0.40 0.43 0.01 0.112 0.012 442.47
452.63 454.14 1.51 4.40 0.35 1.05 0.11 0.03 0.00 0.002 0.005 9 6.55
457.22 458.71 1.49 8.20 0.46 1.57 0.22 0.15 0.00 0.004 0.007 1 53.17
479.83 481.33 1.50 5.60 0.33 1.06 0.12 0.04 0.01 0.004 0.005 1 01.35
506.93 508.48 1.55 15.10 0.55 2.42 0.12 0.53 0.01 0.003 0.015 252.37
515.99 522.05 6.06 9.43 0.24 2.52 0.17 0.15 0.01 0.002 0.014 1 81.04
537.10 543.18 6.08 8.01 0.17 1.87 0.23 0.26 0.01 0.001 0.013 1 58.64
586.64 588.15 1.51 6.40 0.10 1.46 0.22 0.02 0.01 0.001 0.008 1 00.15
627.50 628.97 1.47 3.60 0.52 0.44 0.04 0.01 0.00 0.025 0.001 8 1.27
642.38 643.95 1.57 15.20 0.01 1.65 0.34 0.01 0.01 0.001 0.008 114.00
693.78 695.33 1.55 6.10 0.01 0.91 0.06 0.00 0.00 0.001 0.004 5 5.62
705.88 708.90 3.02 5.28 0.01 0.93 0.11 0.00 0.01 0.001 0.004 5 8.81
730.00 731.53 1.53 6.60 0.02 0.96 0.04 0.00 0.01 0.001 0.005 5 9.97
745.12 746.68 1.56 5.50 0.01 1.21 0.05 0.01 0.04 0.001 0.007 8 4.11
Hole No. From (m) To (m) Length (m)
Ag Au Zn Pb Cu Sn Bi Cd Ag eq
g/t g/t % % % % % % g/t
DSB-49 3.08 74.40 71.32 6.94 0.04 0.09 0.21 0.01 0.05 0.002 0.001 43. 87
99.68 106.67 6.99 5.27 0.01 0.52 0.84 0.02 0.00 0.001 0.052 65 .29
143.83 151.60 7.77 17.41 0.01 1.34 0.43 0.01 0.00 0.001 0.004 100.11
162.20 163.74 1.54 4.00 0.01 0.70 0.13 0.00 0.01 0.001 0.001 4 5.97
174.48 175.99 1.51 4.00 0.01 1.23 0.10 0.00 0.00 0.001 0.004 6 9.90
200.34 201.86 1.52 0.50 0.88 0.23 0.01 0.00 0.00 0.007 0.001 9 4.27
253.30 263.93 10.63 21.02 0.03 1.23 0.49 0.02 0.00 0.025 0.00 5 109.66
285.32 291.28 5.96 10.90 0.06 0.54 0.10 0.01 0.00 0.023 0.002 54.11
313.95 338.13 24.18 6.21 0.02 0.43 0.15 0.01 0.01 0.003 0.002 37.62
348.76 419.28 70.52 15.57 0.22 1.28 0.22 0.01 0.01 0.113 0.00 5 134.92
Incl. 353.33 363.92 10.59 32.75 0.10 1.88 0.26 0.02 0.05 0.04 0 0.008 171.67
Incl. 382.22 393.11 10.89 2.61 0.67 0.15 0.04 0.00 0.00 0.410 0.001 159.09
Incl. 402.24 414.78 12.54 31.80 0.05 4.16 0.78 0.03 0.01 0.04 5 0.018 281.40
449.50 450.94 1.44 3.00 0.01 0.85 0.12 0.01 0.01 0.001 0.003 5 4.87
465.96 469.07 3.11 71.05 0.17 1.68 0.86 0.02 0.01 0.117 0.004 228.13
497.83 502.27 4.44 3.64 0.02 0.81 0.13 0.01 0.01 0.003 0.002 5 5.57
570.16 571.62 1.46 3.00 0.01 0.72 0.24 0.00 0.00 0.001 0.001 4 7.62
595.75 664.63 68.88 10.26 0.04 1.07 0.30 0.01 0.01 0.003 0.00 5 81.61
Incl. 622.87 628.85 5.98 20.43 0.17 2.39 0.37 0.01 0.01 0.006 0.010 172.19
669.26 670.67 1.41 3.00 0.04 0.89 0.18 0.01 0.01 0.004 0.003 6 1.62
684.31 695.53 11.22 12.10 0.04 0.84 0.37 0.01 0.01 0.001 0.00 2 73.56
716.79 738.00 21.21 4.41 0.08 0.63 0.11 0.01 0.01 0.001 0.001 50.56
756.12 759.14 3.02 6.50 0.02 1.74 0.15 0.01 0.01 0.001 0.005 1 05.26
766.69 769.81 3.12 6.39 0.01 0.65 0.17 0.01 0.01 0.001 0.002 4 9.87
Hole No. From (m) To (m) Length (m)