Element79 Gold Engages Rangefront Mining Services to Prepare NI 43-101 Technical Report on Gold Mountain Project
Element79 Gold Engages Rangefront Mining Services to Prepare NI 43-101 Technical Report on
Gold Mountain Project; Site Visit Completed
Vancouver, BC – August 6, 2025 – Element79 Gold Corp (CSE: ELEM | FSE: 7YS0 | OTC: ELMGF)
(“Element79 Gold” or the “Company” ) is pleased to announce that it has formally engaged
Rangefront Mining Services of Elko, Nevada to prepare a National Instrument 43 -101 Technical
Report (“NI 43-101 Report”) for the Company’s Gold Mountain Project located in Lander County,
Nevada.
As part of this engagement, Rangefront Principal Geologist and Qualified Person, Mr. Steven L.
McMillin, MSc, CPG #11301, conducted a comprehensive site visit to the Gold Mountain
property during the week of July 28, 2025. The fieldwork included inspection of historic adits,
surface sampling zones, geological structures, and claim boundaries in and around the Long
Peak Stock intrusion that underlies the project. The site visit is a critical step in validating data
integrity and supports the development of the pending NI 43-101 Property of Merit report.
Photos from the site visit are included below, capturing key outcrops, alteration zones, and
terrain features that demonstrate the potential of the property.
Site Visit Photo 1 – View Across Project Area
Site Visit Photo 2 – Altered Outcrop (Gossan)
Site Visit Photo 3 – Historic Workings Along Structural Trend
"We are excited to be working with Rangefront’s expert team to build a strong technical
foundation for the Gold Mountain project," stated James Tworek, CEO of Element79 Gold Corp.
"This report is a significant step forward in advancing Gold Mountain into a drill- ready stage and
further validating its strategic potential within the prolific Battle Mountain mining district.”
About the Gold Mountain Project
The Gold Mountain Project was acquired by Element79 Gold Corp on August 1, 2025 and
comprises 34 unpatented lode claims covering approximately 702 acres, strategically situated 13
kilometers southwest of Battle Mountain, Nevada. The area is historically known for producing
both porphyry and structurally controlled high-grade gold-silver mineralization. The site visit and
ongoing technical work are intended to compile and digitize historical exploration data
alongside 2023 surface sampling results.
The Company expects to file the completed NI 43- 101 Technical Report during Q3 2025 and will
provide further updates as the work progresses.
Qualified Person
The technical information in this release has been reviewed and approved by Kim Kirkland,
Fellow of AusIMM #309585, Chief Operating Officer of Element79 Gold Corp, and a "qualified
person" as defined by National Instrument 43-101.
About Rangefront
Based in Elko County, Nevada, Rangefront is a premiere geological services company serving the
U.S. and Canada in geological needs for mining, exploration, and mineralogy, providing a full
range of geological mining services ; Since 2008 the Rangefront team of technical personnel,
laborers, and administrators has provided industry -leading mining and geological services in a
safe, responsible, and expert manner. More information about Rangefront can be found at
www.rangefront.com
About Element79 Gold Corp
Element79 Gold Corp is a mining company focused on gold and silver exploration, with a
portfolio of assets in Nevada and Peru. The Company is actively advancing its Elephant project in
the Battle Mountain trend of Nevada, and has recently acquired the drill -ready Gold Mountain
project in Battle Mountain, Nevada. The Company also holds an option to purchase the high -
grade Lucero mine in southern Peru. Element79 Gold has completed the transfer of its Dale
Property in Ontario to its wholly owned subsidiary, Synergy Metals Corp., and is progressing
through the Plan of Arrangement spin- out process. Element79 Gold is listed on the Canadian
Securities Exchange (CSE: ELEM), the Frankfurt Stock Exchange (FSE: 7YS0), and the OTC QB
market (OTC: ELMGF).
For more information, please visit the Company’s website at www.element79.gold
ON BEHALF OF THE BOARD
James C. Tworek
Chief Executive Officer, Director
Element79 Gold Corp
E-mail: [email protected]
Investor Relations Contact:
E-mail: [email protected]
Phone: +1.604.319.6953
Cautionary Note Regarding Forward Looking Statements
This press release contains forward-looking statements within the meaning of applicable
securities laws. The use of any of the words "anticipate," "plan," "continue," "expect,"
"estimate," "objective," "may," "will," "project," "should," "predict," "potential" and similar
expressions are intended to identify forward-looking statements. In particular, this press release
contains forward-looking statements concerning the Company’s exploration plans, development
plans and the Force Majeure Event. Although the Company believes that the expectations and
assumptions on which the forward-looking statements are based are reasonable, undue reliance
should not be placed on these statements because the Company cannot provide assurance that
they will prove correct. Forward -looking statements involve inherent risks and uncertainties,
and actual results may differ materially from those anticipated. Factors that could cause actual
results to differ include conditions in the duration of the Force Majeure Event, and receipt of
regulatory and shareholder approvals. These forward -looking statements are made as of the
date of this press release, and, except as required by law, the Company disclaims any intent or
obligation to update publicly any forward-looking statements.
Neither the Canadian Securities Exchange nor the Market Regulator (as that term is defined in
the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or
accuracy of this release.