Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ELEM.CN ·

Elem en t 79 Gold Corp Files NI 43-101 Technical Report for Elephant Project in Nevada Battle Mountain District

Resource Estimates Technical Reports (NI 43-101)

Elem en t 79 Gold Corp Files NI 43-101 Tech nical Report f or Elephant Project in

Nevada Battle Mountain District

Da t a su pport ska rn /porph yry pot en t ia l; dr ill-rea dy pro gra m ou t lined

VANCOUVER, BC - DECEMBER 16, 2025 – Element79 Gold Corp. (CSE: ELEM) (OTC: ELMGF) (FSE: 7YS0)

("Element79", the " Company") today announced the filing of an independent technical report (the

“Report”) prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral

Projects (“NI 43-101”) for its Elephant Project, located in the prolific Battle Mountain Mining District,

Nevada.

The Report, authored by Steven L. McMillin, MSc, CPG, of Rangefront Mining Services, provides an

integrated assessment of geology, geophysics, and the compilation and analysis of historical exploration

data. Historical exploration on the property has identi fied multiple gold-bearing structures, surface

sampling anomalies, and drill intercepts that indicate strong potential for both high -grade and bulk-

tonnage gold mineralization. Previous work identified scattered mineralization in widely spaced holes that,

when mineralized, suggest the presence of a larger system at depth. The current report outlines that

additional drilling is warranted to evaluate skarn- and porphyry-style gold-copper mineralization.

Key Highlights from the Report:

• The Elephant Project sits on the east-central flank of the Battle Mountain District, with year-

round access and established infrastructure.

• Approximately 3,740 acres (1,514 ha) across 187 unpatented lode claims

• Historical Work:

o 32 drill holes totaling 11,868 m (38,937 ft) with 27 holes reaching bedrock

o Widespread base- metals anomalism and localized high -grade Au within skarn/hornfels

near intrusive dikes.

• Notable Intervals (historic):

o EL04-P3: 1.5 m @ 14.5 g/t Au, plus 1.5 m @ 1.735 g/t Au.

o P-3C: 6.2 ft @ 7.70 g/t Au, plus multiple intervals between 0.59–1.60 g/t Au over 1–20 m.

o These intercepts occur within broader halos of base-metal enrichment (Cu, Pb, Zn),

consistent with skarn/porphyry systems.

(True widths unknown; all intercepts are historical and reported in the Report.)

• Geophysics-Driven Targets:

o IP–Resistivity survey defines coherent chargeability anomalies interpreted as sulfides at

depth, aligned with intrusive trends.

o Airborne magnetics show magnetite- destructive alteration consistent with porphyry

systems.

o Priority drill intervals are outlined along four IP lines.

2 of 3

“This Report further highlights the potential of the Elephant Project, supporting the Company’s intention

to advance a Systematic exploration program aimed at expanding on past work and unlocking the

project’s full potential in a district that already hosts tier-one operations,” commented Michael Smith,

CEO of Element79 Gold Corp. “With high-grade gold intervals reported in historical core and geophysical

signatures consistent with sulfide mineralization, our focus is on smart meters that test the heart of this

system.”

Figure 1: Proposed drill targets

Next Steps:

1. Legacy Core Program: Re-log, photograph, and digitize historical core; implement QA/QC check

assays and petrography.

2. Geophysics Integration: Complete a property-wide ground/drone magnetics survey and extend IP

coverage over remaining claims; merge historical gravity data with public datasets.

3. 3D Geologic Model: Build an integrated model combining structural, geochemical, and geophysical

data to rank targets.

4. Drilling: Test IP chargeability corridors and the interpreted north-northeast intrusive trend,

stepping into Section 12 where multi-element grades are highest.

Qualified Person

The technical information in this release has been reviewed and approved by Kim Kirkland, Director of

Element79 Gold Corp, Fellow of AusIMM #309585, and a "qualified person" as defined by National

Instrument 43-101.

3 of 3

About Element79 Gold Corp.

Element79 Gold Corp is a mining company focused on the exploration and development of its portfolio of

high-potential gold projects. The Company’s focus is its Nevada portfolio, anchored by the Gold Mountain

and Elephant Projects, both located in the world -class Battle Mountain Trend. In addition, Element79

continues to advance its high -grade Lucero Project in southern Peru, positioning the Company for long -

term exploration growth.

For further details on this announcement and the Company’s projects, please visit www.element79.gold

Contact Information

For corporate matters, please contact:

Michael Smith, Chief Executive Officer

E-mail: [email protected]

For investor relations inquiries, please contact:

Investor Relations Department

Phone: +1. (855) 535-3679

E-mail: [email protected]

Cautionary Note Regarding Forward Looking Statements

This press contains "forward-looking information" and "forward -looking statements" under applicable

securities laws (collectively, "forward-looking statements"). These statements relate to future events or

the Company's future performance, business prospec ts or opportunities that are based on forecasts of

future results, estimates of amounts not yet determinable and assumptions of management made

considering management's experience and perception of historical trends, current conditions and

expected future developments. Forward-looking statements include, but are not limited to, statements

with respect to: the Company’s plans and intentions for further exploration at the Elephant Project,

including proposed drilling programs, geophysical surveys, and geologic modeling; the timing, scope, and

objectives of such programs; and the potential for mineralization and project development. Assumptions

may prove to be incorrect and actual results may differ materially from those anticipated. Consequently,

forward-looking statements cannot be guaranteed. As such, investors are cautioned not to place undue

reliance upon forward-looking statements as there can be no assurance that the plans, assumptions or

expectations upon which they are placed will occur. All statements other than statements of historical fact

may be forward-looking statements. Any statements that express or involve discussions with respect to

predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often,

but no t always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate",

"expect", "may", "will", "project", "predict", "forecast", "potential", "target", "intend", "could", "might",

"should", "believe" and similar expressions) are no t statements of historical fact and may be "forward-

looking statements".

Neither the Canadian Securities Exchange nor the Market Regulator (as that term is defined in the policies

of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.