Saturday, October 17, 2026
MiningNewsTerminal
Saturday, October 17, 2026 Admin

ELEF.TO ·

Prophecy: Paca Returns Chip Sample Results Up to 1500 g/t Silver, 2.49% Zinc and 6.72% Lead

Exploration Programs Sampling & Geoscience Results

Vancouver, British Columbia, August 15, 2016 – Prophecy Development Corp. (“Prophecy” or the “Company”) (TSX:PCY, OTC:PRPCD, Frankfurt:1P2N) is pleased to announce, further to its press release dated June 16, 2016, the assay results for the first group of 40 samples collected from the Paca exploration program at its Pulacayo project. During the sampling program, 233 samples were collected. However, due to a backlog at the testing laboratory, Prophecy prioritized the 40 most prospective samples for assay. Thus, the assayed samples are not representative of the sample population. These results are taken from the first group of samples Prophecy delivered. Samples were obtained by continuous chip channel sampling across the width of the vein mineralization at locations one meter apart.

SampleSampling MethodAg g/tZn %Pb %Ag Eq. g/t
P225Chip Channel Sampling>15000.822.84>1617
P224Chip Channel Sampling8381.852.18965.3
P233Chip Channel Sampling8660.320.88902.0
P206Chip Channel Sampling7210.102.78802.6
P229Chip Channel Sampling6740.661.19731.1
P232Chip Channel Sampling6390.391.42692.9
P192Chip Channel Sampling5990.070.50615.5
P228Chip Channel Sampling5650.551.04613.7
P231Chip Channel Sampling5020.531.58565.1
P230Chip Channel Sampling4930.601.49556.4
P210Chip Channel Sampling5180.280.69547.4
P227Chip Channel Sampling4690.970.66522.1
P186Chip Channel Sampling2710.836.72489.5
P226Chip Channel Sampling3562.271.37475.5
P201Chip Channel Sampling3730.103.35470.7
P184Chip Channel Sampling3510.762.53449.3
P213Chip Channel Sampling2732.491.74410.6
P223Chip Channel Sampling2891.671.71396.5
P180Chip Channel Sampling2500.844.15396.6
P211Chip Channel Sampling2950.311.43346.3
P183Chip Channel Sampling2500.732.39343.1
P222Chip Channel Sampling1741.783.24328.4
P187Chip Channel Sampling2310.242.20301.4
P199Chip Channel Sampling2420.121.84297.9
P185Chip Channel Sampling1490.803.53276.7
P207Chip Channel Sampling1940.401.78258.3
P196Chip Channel Sampling1280.162.97217.1
P190Chip Channel Sampling1870.100.64208.5
P189Chip Channel Sampling1210.292.38198.2
P191Chip Channel Sampling1410.080.73164.5
P208Chip Channel Sampling970.541.33153.0
P188Chip Channel Sampling570.202.56135.8
P176Chip Channel Sampling890.590.88135.0
P197Chip Channel Sampling830.081.46126.8
P198Chip Channel Sampling470.172.44122.0
P179Chip Channel Sampling530.551.89125.2
P193Chip Channel Sampling790.180.93112.1
P182Chip Channel Sampling460.591.40106.6
P181Chip Channel Sampling220.531.0069.2
P177Chip Channel Sampling150.390.6145.7

Silver equivalent (Ag Eq.) calculations are based on the following closing prices as of August 9, 2016: USD$19.79/oz for Ag (www.kitco.com), USD$1.03/lb for Zn and USD$0.81/lb for Pb (London Metals Exchange spot prices). Metal recoveries are assumed to be 100%.

The samples were delivered to ALS Geochemistry Laboratory in Oruro, Bolivia (“ALS”) for assayand included QA/QC samples. Standard reference, duplicate and blank samples were used – all of which, produced acceptable results. ALS is an independent laboratory and was qualified and accredited by the Colombian Institute of Technical Standards and Certification (ICONTEC) and the Standards Council of Canada for the methods used during the time the samples were prepared and assayed. Records were maintained to document the secure handling of the samples and to verify their identities were maintained.

Chip channel sample P225 returned a silver grade that is greater than the 1,500 g/t detection limit. This sample will now undergo another assay for precious metals content using methods having a greater upper detection limit. Results are expected to be received in approximately three weeks.

Samples were obtained from shallow depth drifts within the Paca mine which appear to have limited historic development. The area of sampled drifts has an estimated dimension of 90 metres length (east to west) and 75 metres width (north to south) and occurs at an average depth of 100 metres. Mineralization mainly consists of silver sulphides (mostly tennantite), galena and sphalerite in the pores of the sedimentary rocks and in breccias. The sampled area is within the Paca resource boundary, but was not included in the block model used to estimate the resources* recently disclosed according to National Instrument 43-101 (“NI 43-101”).

*Paca Mineral Resource Statement – Effective September 9, 2015

Ag Eq. Cut-Off (g/t) Category Tonnes** Ag (g/t) Zn (%) Pb (%) Ag Eq. (g/t)

200Inferred2,540,000 2561.101.03342
300***Inferred1,260,000 3630.981.02444
400Inferred650,0004620.901.00538
500Inferred330,0005580.791.04631

**Tonnes are rounded to nearest 10,000 ***Base case resources are those reported at the 300 g/t Ag Eq. cut-off

Inferred resources do not have demonstrated economic viability and are speculative.

The mineral resource estimate was prepared by Mercator Geological Services Limited (“Mercator”) under the supervision of Michael Cullen, P.Geo., who is an independent Qualified Person as set out in NI 43-101. The Paca mineralization starts from surface, with approximately 95% of the resource existing at the cut-off value of 300 g/t Ag Eq. occurring within 100 metres of surface (please refer to the Company’s news release dated September 21, 2015).

Map 1. Esmeralda Adit Area and Paca Drill Holes Intercepts

Map 2 (a). Cross Section View of Esmeralda Adit North to South Map 2 (b). Cross Section View of Esmeralda Adit West to East The above sampling maps (both plan and cross section) are also available at: www.prophecydev.com along with high resolution, close-up pictures of selected assayed samples.

Qualified Persons

The technical content of this news release, sampling maps and pictures were reviewed and approved by Christopher M. Kravits, CPG, LPG, who is a Qualified Person within the meaning of NI 43-101. Mr. Kravits is a consultant to the Company and serves as its Qualified Person and General Mining Manager.

About Prophecy

Prophecy Development Corp. is a Canadian public company listed on the Toronto Stock Exchange that is engaged in developing mining and energy projects in Mongolia, Bolivia and Canada. Further information on Prophecy can be found at www.prophecydev.com.

PROPHECY DEVELOPMENT CORP.

ON BEHALF OF THE BOARD

“JOHN LEE”

Executive Chairman

For more information about Prophecy, please contact Investor Relations:

+1.888.513.6286 [email protected] www.prophecydev.com

Neither the Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Toronto Stock Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

Certain statements contained in this news release, including statements which may contain words such as “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, or similar expressions, and statements related to matters which are not historical facts, are forward-looking information within the meaning of applicable securities laws. Such forward-looking statements, which reflect management’s expectations regarding Prophecy’s future growth, results of operations, performance, business prospects and opportunities, are based on certain factors and assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements to be materially different from future results, performance, or achievements expressed or implied by such forward-looking statements. These estimates and assumptions are inherently subject to significant business, economic, competitive and other uncertainties and contingencies, many of which, with respect to future events, are subject to change and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by Prophecy. In making forward-looking statements as may be included in this news release, Prophecy has made several assumptions that it believes are appropriate, including, but not limited to assumptions that: there being no significant disruptions affecting operations, such as due to labour disruptions; currency exchange rates being approximately consistent with current levels; certain price assumptions for coal, prices for and availability of fuel, parts and equipment and other key supplies remain consistent with current levels; production forecasts meeting expectations; the accuracy of Prophecy’s current mineral resource estimates; labour and materials costs increasing on a basis consistent with Prophecy’s current expectations; and that any additional required financing will be available on reasonable terms. Prophecy cannot assure you that any of these assumptions will prove to be correct.

Numerous factors could cause Prophecy’s actual results to differ materially from those expressed or implied in the forward-looking statements, including the following risks and uncertainties, which are discussed in greater detail under the heading “Risk Factors” in Prophecy’s most recent Management Discussion and Analysis and Annual Information Form as filed on SEDAR and posted on Prophecy’s website: Prophecy’s history of net losses and lack of foreseeable cash flow; exploration, development and production risks, including risks related to the development of Prophecy’s mineral properties; Prophecy not having a history of profitable mineral production; the uncertainty of mineral resource and mineral reserve estimates; the capital and operating costs required to bring Prophecy’s projects into production and the resulting economic returns from its projects; foreign operations and political conditions, including the legal and political risks of operating in Bolivia, which is a developing jurisdiction; amendments to local Bolivian laws which may have an adverse impact on the Company’s operations; title to Prophecy’s mineral properties; environmental risks; the competitive nature of the mining business; lack of infrastructure; Prophecy’s reliance on key personnel; uninsured risks; commodity price fluctuations; reliance on contractors; Prophecy’s need for substantial additional funding and the risk of not securing such funding on reasonable terms or at all; foreign exchange risks; anti-corruption legislation; recent global financial conditions; the payment of dividends; and conflicts of interest.

These factors should be considered carefully, and readers should not place undue reliance on Prophecy’s forward-looking statements. Prophecy believes that the expectations reflected in the forward-looking statements contained in this news release and the documents incorporated by reference herein are reasonable, but no assurance can be given that these expectations will prove to be correct. In addition, although Prophecy has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Prophecy undertakes no obligation to release publicly any future revisions to forward-looking statements to reflect events or circumstances after the date of this news or to reflect the occurrence of unanticipated events, except as expressly required by law.