Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ELEF.TO ·

Prophecy Discovers Multiple Vanadium Surface Mineralization At Gibellini

Drill Results Sampling & Geoscience Results

Prophecy Discovers Multiple Vanadium Surface

Mineralization At Gibellini

Vancouver, British Columbia, March 26, 2019 – Prophecy Development Corp.

(“Prophecy” or the “Company”) (TSX:PCY, OTCQX:PRPCF, Frankfurt:1P2N) is pleased to

announce vanadium assay results from its Fall 2018 exploration reconnaissance program on its

Gibellini vanadium project, located in Eureka County, Nevada, USA. The 155 assays are taken

from three prospective exploration areas all within 5km to existing Gibellini vanadium NI43 -101

compliant resource pit outline whereat 49.9 million lbs measured and 81.5 million lbs indicated

vanadium resource have already been identified (see Company’s press release dated May 29 th,

2018).

Surface grab samples assay as high as 2% vanadium pentoxide (V2O5) and 75 samples (48%

of total 155) have V2O5 grades greater than the Gibellini deposit’s cut-off grade of 0.101% V2O5

at $12.5/lb V2O5; V2O5 currently trades at approximately $16/lb.

The high vanadium assay results along the 5-kilometer northeast-southwest trend which line-up

the Northeast Prospect, through Gibellini Hill, Louie Hill, Middle Earth Prospect, and Big Sky

Prospect providing an indication of potential and possibly significant future expansion of vanadium

mineralization along this corridor.

“From a geological perspective, the rocks at all three of these prospects have the same visual

hallmarks as what we see in the oxidized and transition zones at Gibellini Hill deposit which are

amenable to heap leach recovery” states Danniel Oosterman, Prophecy’s VP Exploration.

“Assay results demonstrate extensive vanadium mineralization with nearly half of the samples

well above the cut -off grades adopted at Gibellini. This confirms that any occurrence of t he

Woodruff Formation in this region is prospective from an exploration standpoint.”

Detailed maps are available at www.prophecydev.com

BIG SKY PROSPECT (300m by 50m)

The Big Sky prospect occurs 3.1 km southwest o f the Gibellini Hill measured and indicated

resource and 1.8 km southwest of Louie Hill inferred resource (NI -43-101 compliant; see

Company’s news release dated May 29th, 2018). A total of 62 samples were taken, of which 40%

(n=25) returned assays greater than Gibellini cut-off grade. Sixteen (16) samples returned assays

>0.200 V2O5. The distribution of samples occur along a 300 meter exposure of the Woodruff

Formation. Assays showing >0.200 V2O5 are shown in Table 1.

Table 1. V2O5% grab sample assay results at Big Sky prospect for samples with >0.200%

SAMPLE

ID

Prospect V2O5

%

301910 Big Sky 0.261

301913 Big Sky 0.223

301915 Big Sky 0.346

301916 Big Sky 0.400

301918 Big Sky 0.712

301920 Big Sky 0.264

301926 Big Sky 0.580

301927 Big Sky 2.008

301928 Big Sky 0.848

301944 Big Sky 0.264

301946 Big Sky 0.280

301947 Big Sky 0.218

301950 Big Sky 0.261

302050 Big Sky 0.214

302054 Big Sky 0.787

302055 Big Sky 1.982

MIDDLE EARTH PROSPECT (200m by 70m)

The Middle Earth prospect occurs 1.7 km southeast of the Gibellini Hill deposit and 300 meters

south of the Louie Hill deposit. A total of 50 samples were collected of which 68% (n=34) returned

assays >0.101% V2O5 or the Gibellini cut-off grade. Twenty-seven (27) samples returned assays

>0.200 V2O5. The samples are distributed over 3 road cuts of exposed Woodruff Formation

making up a 200 meter by 70-meter areal footprint. Assays showing >0.200 V2O5 are shown in

Table 2.

Table 2. V2O5% grab sample assay results at Middle Earth prospect for samples with >0.200%

SAMPLE Prospect V2O5

%

301951 Middle Earth 0.350

301952 Middle Earth 0.482

301968 Middle Earth 0.628

301969 Middle Earth 0.605

301970 Middle Earth 0.634

301972 Middle Earth 0.252

301973 Middle Earth 0.687

301974 Middle Earth 0.470

301975 Middle Earth 0.612

301976 Middle Earth 0.637

301978 Middle Earth 0.559

301979 Middle Earth 0.557

301980 Middle Earth 0.259

301981 Middle Earth 0.405

301983 Middle Earth 0.255

301984 Middle Earth 0.303

301985 Middle Earth 0.434

301987 Middle Earth 0.291

301988 Middle Earth 1.294

301989 Middle Earth 0.261

301991 Middle Earth 0.314

301992 Middle Earth 0.457

301993 Middle Earth 0.380

301995 Middle Earth 0.302

301998 Middle Earth 0.539

301999 Middle Earth 0.618

302000 Middle Earth 0.532

NORTHEAST TRENCH PROSPECT (500m by 300m)

The Northeast Trench prospect occurs 1.2 km northeast of the Gibellini Hill deposit and 2.5 km

northeast of the Louie Hill deposit. A total of 43 samples were collected of which 37% ( n=16)

returned assays >0.101% V2O5 or the Gibellini cut-off grade. Three (3) samples returned assays

>0.200 V2O5. The samples are distributed through road cuts (“trench es”) and dry gulches of

exposed Woodruff Formation making up a 500 meter by 350-meter areal footprint. The exposure

at the Northeast Trench is greatly obscured by colluvium material however the extent where it is

exposed might indicate a large volume of Woodruff Formation yet to be explored. Assays showing

>0.200 V2O5 are shown in Table 2.

Table 3. V2O5% grab sample assay results at Northeast Trench prospect for samples with >0.200%

SAMPLE

ID

Prospect V2O5

%

302004 NE

Trench

0.239

302005 NE

Trench

0.380

302016 NE

Trench

0.303

John Lee, Prophecy’s Chairman states, “We are excited at not only in developing Gibellini to

become America’s first primary vanadium mine, but also expanding Gibellini into a large district

vanadium discovery. Our permitting efforts are well underway, and further project milestones will

be announced throughout 2019.”

Gibellini is considered a highly strategic deposit given that;

1. In December 2017, the U.S. Geological Survey listed vanadium as one of 23 critical

mineral resources of the United States; yet there is not a primary vanadium producing

mine currently in the country;

2. Gibellini is the only known primary vanadium deposit in the US that is under going

permitting progress, the project’s annual production profile of 9.75 million lbs of V2O5

outlined in the independent preliminary economic assessment (see news release dated

May 29, 2018) is sufficient to supply United States current annual vanadium consumption

requirement.

Qualified Persons and QA/QC

The technical contents of this news release have been prepared under the supervision of Danniel

Oosterman, VP Exploration. Mr. Oosterman is not independent of the Company in that he is

employed by the Company. Mr. Oosterman is a Qualified Person (“QP”) as defined by the

guidelines in NI 43-101. Samples were prepared at analyzed at ALS Limited labs in Elko, Nevada,

USA where they were dried , crushed, split and pulverized and then shipped to the ALS lab in

Vancouver, Canada, where they were assayed (minimum 30 g) using the ME -ICP61a

(Conventional ICP-AES) analytical package.

About Prophecy

Prophecy is developing the Gibellini project – the only large-scale, open-pit, heap-leach vanadium

project of its kind in North America. Located in Nevada, Gibellini is currently undergoing EPCM

and permit development. Further information on Prophecy can be found at

www.prophecydev.com.

PROPHECY DEVELOPMENT CORP.

ON BEHALF OF THE BOARD

“John Lee”

Chairman

For more information about Prophecy, please contact Investor Relations:

+1.888.513.6286

[email protected]

www.prophecydev.com

Neither the Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the Toronto Stock Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Cautionary Note Regarding Forward-Looking Statements

Forward-looking statements in this news release relate to future events or future performance and

reflect current estimates, predictions, expectations or beliefs regarding future events and include, but

are not limited to, statements with respect to: (i) the PEA representing a viable development option for

the project; (ii) construction of a mine at the project and related ac tions; (iii) estimates of the capital

costs of constructing mine facilities and bringing a mine into production, of sustaining capital and the

duration of financing payback periods; (iv) the estimated amount of future production, both produced

and metal recovered; and (vi) life of mine estimates and estimates of operating costs and total costs,

cash flow, net present value and economic returns including internal rate of return estimates from an

operating mine constructed at the project. All forward-looking statements are based on Prophecy’s or

its consultants' current beliefs as well as various assumptions made by them and information currently

available to them. The most significant assumptions are set forth above, but generally these

assumptions include: (i) the presence of and continuity of vanadium mineralization at the project at

estimated grades; (ii) the geotechnical and metallurgical characteristics of rock conforming to sampled

results; (iii) infrastructure construction costs and schedule; (iv) the availability of personnel, machinery

and equipment at estimated prices and within the estimated delivery times; (v) currency exchange

rates; (vi) vanadium sale prices; (vii) appropriate discount rates applied to the cash flows in the

economic analysis; (viii) tax rates applicable to the proposed mining operation; (ix) the availability of

acceptable financing on reasonable terms; (x) projected recovery rates and use of a process method,

that although well-known and proven on other commodity types like copper, has not been previously

brought into production for a vanadium project; (xi) reasonable contingency requirements; (xii) success

in realizing proposed operations; and (xiii) assumptions that project environmental approval and

permitting will be forthcomi ng from county, state and federal authorities. The economic analysis is

partly based on Inferred Mineral Resources that are considered too speculative geologically to have

the economic considerations applied to them that would enable them to be categorize d as Mineral

Reserves, and there is no certainty that the PEA based on these Mineral Resources will be

realized. Currently there are no Mineral Reserves on the Gibellini property. Although the Company’s

management and its consultants consider these assumptions to be reasonable based on information

currently available to it, they may prove to be incorrect. Many forward-looking statements are made

assuming the correctness of other forward -looking statements, such as statements of net present

value and internal rates of return, which are based on most of the other forward -looking statements

and assumptions herein. The cost information is also prepared using current values, but the time for

incurring the costs will be in the future and it is assumed costs wil l remain stable over the relevant

period.

These factors should be considered carefully, and readers should not place undue reliance on

Prophecy’s or its consultant’s forward-looking statements. Prophecy or its consultants believe that the

expectations reflected in the forward -looking statements contained in this news release and the

documents incorporated by reference herein are reasonable, but no assurance can be given that these

expectations will prove to be correct. In addition, althoug h Prophecy and its consultants have

attempted to identify important factors that could cause actual actions, events or results to differ

materially from those described in forward-looking statements, there may be other factors that cause

actions, events or results not to be as anticipated, estimated or intended. Prophecy or its consultants

undertake no obligation to release publicly any future revisions to forward-looking statements to reflect

events or circumstances after the date of this news or to reflect the occurrence of unanticipated events,

except as expressly required by law.