Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ELD.TO ·

Eldorado Gold Provides Exploration Update Highlighting Increased Confidence on Ormaque; Announces Executive Management Appointments

Management Changes Exploration Programs

NEWS RELEASE

TSX: ELD NYSE: EGO December 13, 2023

Eldorado Gold Provides Exploration Update Highlighting Increased

Confidence on Ormaque; Announces Executive Management

Appointments

VANCOUVER, BC – Eldorado Gold Corporation (“Eldorado”, the “Company” or “We”) is

pleased to provide an update on exploration results from the Ormaque deposit, part of the

Lamaque Complex, in Quebec, Canada.

“We are excited to see Ormaque resources continuing to grow, adding ounces to both Indicated

and Inferred Resources, as reported in our September 30, 2023 Mineral Reserve and Mineral

Resource statement, published on December 13, 2023," said George Burns, President and CEO

of Eldorado Gold Corporation. “In addition to this, we are encouraged by the results of our 2023

exploration program that increase our confidence and demonstrate opportunity for expansion

beyond the current Mineral Resource.”

“Supporting our development strategy in Quebec , p lans are being advanced to declare initial

Reserves for Ormaque in late 2024 with completion of a pre -feasibility study, and exploration

drilling will continue to test resource expansion opportunities . We will also drive a drift off the

decline next year into one of the lenses for a bulk sample to test our geological assumptions,

mining method and for metallurgical test work . Additionally, our Exploration team continues to

explore other near mine opportunities in the Val-d’Or district, capitalizing on our strategic footprint

in the prolific Abitibi region.”

Interactive VRIFY 3D Model

To view an interactive 3D model that includes the results announced today use the following link

or visit Eldorado Gold's website:

https://vrify.com/decks/14810?auth=c09dea7a-da6f-487c-8237-1c2834c65c65

Ormaque Resource Expansion Drilling Highlights

Resource expansion drilling at Ormaque totals over 11,500 metres in 2023. This drilling has

identified new zones characterised by high-grade veins similar in style and geometry to those

hosting the Ormaque deposit. Key mineralised intercepts are present both below and south of the

current Mineral Resources for at least 350 metres. Notable results since the March 2023

exploration update news release include:

• 10.15 metres at 8.28 g/t gold (9.94 g/t gold uncapped) in drillhole FOR-22-027,

approximately 350 metres southeast of the current Resource;

• 11.55 metres at 9.95 g/t gold in drillhole LS-23-095, approximately 30 metres south of the

current Resource;

• 5.70 metres at 16.61 g/t gold (17.31 g/t gold uncapped) in drillhole LS-23-096,

approximately 50 metres east of the current Resource;

• 11.50 metres at 3.97 g/t gold, including 4.00 metres at 9.81 g/t gold, in drillhole LS-23-

098, approximately 120 metres northeast of the current Resource;

• 2.00 metres at 15.13 g/t gold in drillhole LS-23-100, approximately 150 metres west of the

current Resource;

• 20.15 metres at 4.93 g/t gold, including 5.00 metres at 7.59 g/t gold, and 18.00 metres at

3.15 g/t gold, including 3.40 metres at 8.31 g/t gold, in drillhole LS-23-101 at approximately

30 and 80 metres below the current Resource; and

• 14.20 metres at 8.36 g/t gold (14.00 g/t gold uncapped), including 3.30 metres at 20.40 g/t

gold (44.68 g/t gold uncapped), in drillhole LS-23-102, approximately 140 metres south of

the current Resource.

Note: Gold grades for drillhole intervals listed in this release are based on capping individual assays

at 70 g/t gold. Drillhole intercepts are drillhole lengths.

Figure 1: Map of the Ormaque deposit area, showing surface projection of Mineral Resource

(pink shaded area) on simplified surface geology, with collar locations and surface traces of new

drillholes presented in this news release and with reference section lines for Figure 2.

Figure 2: North-south cross sections illustrating western, central and eastern views of the

Ormaque deposit, showing section projection limits of reported September 2023 Mineral

Resource (pink shaded areas) and simplified geology, with traces of new drillholes presented in

this news release.

Qualified Persons

Jacques Simoneau P.Geo. (OGQ No. 737 ), a member in good standing of the Ordre des

Géologues du Québec, is the qualified person as defined in NI 43-101, and is responsible for and

has verified and approved the scientific and technical disclosure contained in this press release

(including verification of the sampling, analytical and test data underlying the information

disclosed), with respect to the exploration program at Ormaque . Eldorado Gold operates its

exploration programs according to industry best practices and employs rigorous quality assurance

and quality control procedures. All results are based on half -core samples of diamond drill

core. The data including in this press release was verifie d as follows: Drill core samples for the

Ormaque deposit exploration drilling were prepared and analyzed at Bourlamaque Laboratories

in Val d’Or, Quebec. All gold assays are based on fire assay analysis of a 30 g charge, followed

by an atomic adsorption finish. Samples with gold grades above 5.0 g/t were re -assayed and

completed with a gravimetric finish. Certified standard reference materials, field duplicates and

blank samples were inserted regularly and were closely monitored to ensure the quality of the

data.

Strengthening the Executive Management Team

The Company announces that Joe Dick, Executive Vice President and Chief Operating Officer,

will retire in 2024. Joe has had a successful 40-year career, the last four of which have been with

Eldorado. He will remain as an advisor to Eldorado after his retirement to provide continued

support to the company as required.

“Joe has been an integral part of our senior leadership team and has provided invaluable guidance

on our operations while overseeing considerable progress made at our Skouries project over the

last few years,” said George Burns. “In addition, he has championed a culture of safety excellence

and continuous improvement. I am grateful for his support and many contributions he has made

as a key member of the team. On behalf of everyone at Eldorado, we wish him all the best in his

well-deserved retirement and his future endeavours.”

With the retirement of Joe Dick a number of changes in the senior management team have been

implemented to support our growth and set us up for continued success. These changes include:

Louw Smith has been appointed Executive Vice President, Development, Greece , effective

January 1, 2024. Louw brings to the role over 30 years of experience in the Industry, and most

recently held the position of Managing Director at TEX overseeing a full range of technical

solutions for gold mining companies. Prior to that, Louw was Chief Operating Officer at Nord Gold

Plc for eight years . Louw was also Chief Operating Officer at Alacer Gold Corp. Louw will be

based in Greece and responsible for the development of our Greek assets, including Skouries

and Perama Hill, overseeing operations, and corporate functions.

Paul Ferneyhough has been appointed Executive Vice President, Chief Strategy & Commercial

Officer. Paul’s accountabilities include Country Management (Canada and Turkiye), Investor

Relations, Sales & Marketing, Business Improvement, and Supply Chain & Procurement. Paul

joined the Company in May, 2021 as Senior Vice President, Chief Growth and Integration

Officer. Prior to joining Eldorado Gold, Paul spent nearly two decades with Repsol SA (and

Talisman Energy), most recently as Executive Director leading Repsol's North American

upstream oil and gas division. He also held progressively senior leadership roles in corporate, line

and functional areas including finance, investor relations, strategy, commercial, planning and

business performance management.

Simon Hille has been appointed Executive Vice President, Technical Services & Operations.

Simon will be accountable for Operations in Turkiye and Canada along with the Global functions:

Technical Services, Project Engineering, Exploration and Safety & Sustainability. Simon joined

the Company in November, 2020 as Vice President, Technical Services. Prior to joining Eldorado,

Simon was with Newmont (Goldcorp), as Group Executive, Technical Engineering and Global

Projects. Ahead of the Newmont merger, Simon was Vice -President, Global Innovation,

Metallurgy and Processing at Goldcorp. He also held progressively senior leadership roles in

metallurgy and process development with Barrick Gold and Newcrest Mining. Simon has over 30

years of experience in gold and base metals specializing in leading high -performance, cross-

functional technical and operational teams to maximize value from complex ore bodies.

Niklas Frank has been appointed Senior Vice President, Operations. Niklas recently joined the

Company as Vice President, Operations in August, 2023. Niklas is based in Europe and will be

responsible for Operational Support and the primary lead for our site General Managers in

Quebec and Türkiye and operations support needs in Greece. With a career spanning over 25

years, Niklas brings a strong background in operations management and a proven track record

of driving efficiency and excellence. His experience in world -class, highly productive mining

operations, safe and sustainable development, life of mine and strategy development, application

of LEAN mining, M&A and stakeholder management.

About Eldorado Gold

Eldorado is a gold and base metals producer with mining, development and exploration

operations in Turkiye, Canada, Greece and Romania. The Company has a highly skilled and

dedicated workforce, safe and responsible operations, a portfolio of high-quality assets, and long-

term partnerships with local communities. Eldorado's common shares trade on the Toronto Stock

Exchange (TSX: ELD) and the New York Stock Exchange (NYSE: EGO).

Contact

Investor Relations

Lynette Gould, VP, Investor Relations

647 271 2827 or 1 888 353 8166

[email protected]

Media

Chad Pederson, Director, Communications

236 885 6251 or 1 888 353 8166

[email protected]

Cautionary Note about Forward-looking Statements and Information

Certain of the statements made and information provided in this press release are forward -looking statements or information within

the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Of ten,

these forward-looking statements and forward-looking information can be identified by the use of words such as "plans", "expects", 

"is expected", "budget", “continue”, “projected”, "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believ es" or th e

negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would",

"might" or "will" be taken, occur or be achieved.

Forward-looking statements or information contained in this release include, but are not limited to, statements or information with

respect to: opportunities to expand current resources at Ormaque; plans to declare initial reserves at Ormaque , including the

completion of a pre-feasibility study, and the expected timing thereof; planned future drilling and exploration work, and the timing and

anticipated benefits thereof; our expectations regarding establishment of reserves and resources through our continued exploration

programs; mineral reserves and resources; the timing of changes in the executive management team, including the retirement of Joe

Dick; plans to retain our Chief Operating Officer as a consultant after retirement; expected and new management portfolios; our

guidance and outlook; and our strategy, plans and goals, including our proposed exploration, development, construction, permitting

and operating plans and priorities, including timelines and schedules.

Forward-looking statements and forward -looking information by their nature are based on assumptions and involve known and

unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to

be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements

or information. 

We have made certain assumptions about the forward -looking statements and information, including assumptions about : the future

price of gold and other commodities, the results of our exploration programs; the need for additional financing to explore and develop

properties; mineral reserves and resources and metallurgical recoveries, uncertainties involved in the interpretation of drill results and

geological tests, the geopolitical, economic, permitting and legal climate that we operate in; ability to obtain all required approvals and

permits in a timely manner and our ability to comply with all the conditions that are imposed in such approvals and permits; how the

world-wide economic and social impact of COVID-19 is managed and the duration and extent of the impact of the COVID-19 pandemic

on our operations the future price of gold and other commodities; the global concentrate market; exchange rates; anticipated costs

and expenses; production, the impact of acquisitions, dispositions, suspensions or delays on our business and the ability to achieve

our goals. In particular, except where otherwise stated, we have assumed a continuation of existing business operations on

substantially the same basis as exists at the time of this release.

Even though our management believes that the assumptions made and the expectations represented by such statements or

information are reasonable, there can be no assurance that the forward -looking statement or information will prove to be accurate.

Many assumptions may be difficult to predict and are beyond our control.  

Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions pr ove

incorrect, actual results may vary materially from those described in forward -looking statements or information. These risks,

uncertainties and other factors include, among others:; timing and cost of exploration, drilling, work programs, construction, geopolitical

and economic climate (global and local), uncertainties involved in the interpretation of drill results and geologica l tests; the need to

obtain additional permits and governmental approvals, risks related to the updating of our resource and reserve models and life of

mine plans; mineral tenure and permits; gold and other commodity price volatility; information technology systems risks; continued

softening of the global concentrate market, recoveries of gold and other metals; results of test work; revised guidance; risks regarding

potential and pending litigation and arbitration proceedings relating to the Company’s, business, properties and operations; expected

impact on reserves and the carrying value; mining operational and development risk; financing risks; foreign country operational risks;

global outbreaks of infectious diseases, including COVID -19; risks of sovereign investment; regulatory risks and liabilities including,

regulatory environment and restrictions, and environmental regulatory restrictions and liability; discrepancies between actua l and

estimated production, mineral reserves and resourc es and metallurg ical testing and recoveries; additional funding requirements;

currency fluctuations; community and non-governmental organization actions; speculative nature of gold exploration; dilution; share

price volatility and the price of our common shares; competition; loss of key employees; and defective title to mineral claims or

properties, as well as those risk factors discussed in the sections titled “Forward -Looking Statements” and "Risk factors in our

business" in the Company's most recent Annual Information Form & Form 40-F. The reader is directed to carefully review the detailed

risk discussion in our most recent Annual Information Form filed on SEDAR and EDGAR under our Company name, which discussion

is incorporated by reference in this release, for a fuller understanding of the risks and uncertainties that affect the Company’s business

and operations.

Forward-looking statements and information are designed to help you understand management’s current views of our near and longer-

term prospects, and it may not be appropriate for other purposes.

There can be no assurance that forward -looking statements or information will prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements.  Accordingly, you should not place undue reliance o n the

forward-looking statements or information contained herein.  Except as required by law, we do not expect to update forward -looking

statements and information continually as conditions change and you are referred to the full discussion of the Company's business

contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.

Appendix 1: Tables of Assay Results

Table 1: Summary of drillhole assay results from the Ormaque Deposit. Intercepts are only reported for

those intervals above a 10 gram x metre cut -off. Drillhole collar locations, collar orientations, and total

lengths are listed in Appendix 2.

Drillhole From

(m) To (m) Interval Au (g/t) Au capped

at 70 g/t Zone

FOR-22-025

624.5 625 0.5 22.53 Step-out intercept, ~300 m SE to current Resource

646.5 648.5 2 5.26 Step-out intercept, ~300 m SE to current Resource

686.75 687.75 1 10.3 Step-out intercept, ~300 m SE to current Resource

FOR-22-027 704.2 714.35 10.15 9.94 8.28 Step-out intercept, ~350 m SE to current Resource

FOR-22-032

319.9 320.5 0.6 19.62 Step-out intercept, ~100 m east to current Resource

367 372.25 5.25 5.95 Step-out intercept, ~90 m east to current Resource

FOR-22-033 175.5 176.5 1 17.98 E030, step-out 30 m east to current Resource

FOR-23-035 819.4 823.8 4.4 3.57 Step-out intercept, ~200 m east to current Resource

FOR-23-036

203.2 204.8 1.6 12.96 Step-out intercept, ~70 m east to current Resource

366.3 367.3 1 22.27 Step-out intercept, ~70 m east to current Resource

488.2 489.75 1.55 6.69 Step-out intercept, ~60 m east to current Resource

FOR-23-037

28.2 31.4 3.2 3.88 E006

37 42.2 5.2 4.97 Intercept between E006 and E008

358.1 364 5.9 2.11 East step-out intercept, 200 m below current

Resource

LS-23-095

494.35 495 0.65 81.77 70 Step-out intercept, ~30 m south to current Resource

500.7 512.25 11.55 9.95

Including 500.7 503.1 2.4 19.94 E150, step-out ~30 m south to current Resource

510.65 512.25 1.6 33.86 24.21 Intercept 7m below E150

LS-23-095

608.55 613.2 4.65 3.68 Step-out intercept ~100m below E150

735.65 736.15 0.5 24.84 Step-out intercept, ~50 m south to current Resource

LS-23-096

382.6 383.1 0.5 38.87 Step-out intercept, ~50 m east to current Resource

623.4 624.4 1 29.2 Step-out intercept, ~50 m east to current Resource

631.6 632.6 1 14.15 Step-out intercept, ~50 m east to current Resource

635.8 637.6 1.8 13.39 Step-out intercept, ~50 m east to current Resource

650 651.1 1.1 37.34 Step-out intercept, ~50 m east to current Resource

665.8 666.4 0.6 35.17 Step-out intercept, ~50 m east to current Resource

667.6 668.1 0.5 22.42 Step-out intercept, ~50 m east to current Resource

672.7 678.4 5.7 17.31 16.61 Step-out intercept, ~50 m east to current Resource

685 686.5 1.5 8.46 Step-out intercept, ~50 m east to current Resource

708.1 711.7 3.6 9.29 Step-out intercept, ~50 m east to current Resource

741.5 742 0.5 27.86 Step-out intercept, ~50 m east to current Resource

LS-23-097

397.7 401.9 4.2 3.16 E120, step-out ~50 m south to current Resource

678 679.24 1.24 10.82 E235, step-out ~140 m south to current Resource

789.3 790 0.7 17.66 Step-out intercept, ~70 m below current Resource

818.3 818.8 0.5 55.34 Step-out intercept, ~80 m below current Resource

LS-23-098

66.5 67.1 0.6 140.59 70 Intercept 28m below E009

352.4 353.4 1 21.39 Step-out intercept, ~40 m NE to current Resource

398 399 1 10.03 Step-out intercept, ~40 m NE to current Resource

525 536.5 11.5 3.97

Including 525 529 4 9.81 Step-out intercept, ~ 120 m NE to current Resource

LS-23-100

232.5 233 0.5 63.28 E020

252 253.5 1.5 7.88 E030

268.3 269.9 1.6 19.85 E040

297 298.7 1.7 18.48 E050, step-out ~10 m east to current Resource

321.7 322.2 0.5 24.33 E075

336.5 337.5 1 32.94 E080

685.9 687.9 2 15.13 Step-out intercept, ~150 m west to current Resource

809.6 811.1 1.5 6.8 Step-out intercept, ~100 m below current Resource

888.4 888.9 0.5 28 Step-out intercept, ~150 m below current Resource

LS-23-101

357 357.5 0.5 107.39 70 E100

431.65 451.8 20.15 4.93

Including

431.65 434.47 2.82 6.94 Intercept 28m above E140

435.6 437 1.4 12.7 E140, step-out ~30 m south to current Resource

440.2 445.2 5 7.59 E145, step-out ~30 m south to current Resource

447.25 448 0.75 15.01 Intercept 28m below E145

LS-23-101

457 459.85 2.85 3.51 Step-out intercept, ~50 m south to current Resource

579.3 580 0.7 15.6 Step-out intercept, ~90 m south to current Resource

751.6 769.6 18 3.15 Blow-out intercept with different vein types

751.6 755 3.4 8.31 Step-out intercept, ~80 m below current Resource

762.71 763.8 1.09 13.16 Step-out intercept, ~90 m below current Resource

818.4 819 0.6 28 Step-out intercept, ~120 m below current Resource

LS-23-102 562 576.2 14.2 14 8.36

Including

568.35 569.35 1 19.76 Step-out intercept, ~140 m south to current

Resource

569.9 571.8 1.9 9.95 Step-out intercept, ~140 m south to current

Resource

572.9 576.2 3.3 44.68 20.4 Step-out intercept, ~140 m south to current

Resource

LS-23-102 836.65 840.7 4.05 3.84 Step-out intercept, ~160 m south to current

Resource

FOR-23-034 No significant intercepts

LS-23-099 No significant intercepts