Eldorado Announces 15 Year Mine Life at Kisladag; Provides 2020 Guidance and Long-term Outlook
1
NEWS RELEASE
TSX: ELD NYSE: EGO February 20, 2020
Eldorado Announces 15 Year Mine Life at Kisladag;
Provides 2020 Guidance and Long-term Outlook
VANCOUVER, BC – Eldorado Gold Corporation, (“Eldorado” or the “Company”) is pleased to announce a
15-year mine life at Kisladag based on the completed long-cycle heap leach testwork and the replacement
of the tertiary crushing circuit with a high-pressure grinding roll (“HPGR”) circuit. A National Instrument 43-
101 compliant technical report detailing the updates to the Kisladag project will be filed on SEDAR prior to
the end of Q1 2020.
The Company is also providing detailed production guidance for 2020, along with a five-year outlook for the
Company’s business.
“Kisladag has been the cornerstone asset of Eldorado for over a decade, producing over three million ounces
of gold and generating significant value for all stakeholders during that period. Following the resumption of
full operations last spring , and the significant work and testing undertaken by the Eldorado team over the
past 18 months, we are pleased to announce a mine life extension at Kisladag that puts this asset back in
the core of our portfolio”, said George Burns, President and CEO.
“Based on these positive developments , we are providing a five -year outlook for the business , which
demonstrates a steady production profile that we expect will allow us to continue to de -lever the balance
sheet and provide a solid foundation for future growth.”
Kisladag Update
Results of the testwork indicate that increased leach time at Kisladag, in conjunction with HPGR, increases
heap leach life of mine recovery to approximately 56% and extends mine life through 2034. A new mineral
reserve has been developed for Kisladag; highlights include:
• Updated Proven and Probable Mineral Reserves of 173.2 million tonnes of ore at 0.72 grams per
tonne, containing 4.0 million ounces of gold (table shown at the end of the release).
• 15 year mine life, with operations continuing through 2034.
• Average annual production of approximately 160,000 ounces per year at an average cash cost of
$675 – 725 per ounce of gold sold and an average all-in sustaining costs (“AISC”) of $800 – 850 per
ounce of gold sold.
• The project self-funds all development capital for waste stripping and the HPGR circuit. The cost for
the HPGR circuit (approximately $35 million) is spread over 2020 and 2021, while the cost of
capitalized waste stripping (approximately $260 million) is spread over the life of the project , with
heavier stripping in the first several years.
• The Company believes there is potential for further increases in recovery with optimization of the
HPGR circuit, which could lead to higher gold production.
• An average strip ratio over the remaining life of the mine of 1.1 to 1.
Five-Year Outlook
The Company is providing detailed 2020 production and cost guidance as well as a five -year production
outlook. Detailed tables are shown at the end of this release. The Company continues to remain focused on:
• Operating all our assets in a safe and responsible manner.
2
• Transforming Olympias into a stable and profitable mine through productivity, efficiency and cost
reduction improvements as well as an expansion of mill capacity.
• Optimizing production at Lamaque in an efficient manner. The five-year outlook includes an increase
in annual production to approximately 150,000 ounces.
• Reducing debt and maintaining gross debt to EBITDA below 2.0x.
• Prudently developing our suite of high-quality development projects.
For 2020, the Company is forecasting a third consecutive year of increasing gold production. 2020 gold
production guidance is 520,000-550,000 ounces of gold (versus 395,331 ounces produced in 2019). The
Company expects average cash operating costs to decline from $6 08 per ounce of gold sold in 201 9, to
$550-600 per ounce of gold sold in 2020. AISC for 2020 is forecast to be $850-$950 per ounce of gold sold,
compared to $1,033 per ounce of gold sold in 2019.
With the extension of Kisladag’s mine life and continued operations at Lamaque, Efemcukuru and Olympias,
Eldorado is forecasting five-year production from its four current operations to average over 450,000 ounces
of gold per year. In addition to the updated Kisladag technical report , the Company is in the process of
updating technical reports for Olympias and Efemcukuru, which will be published by the end of Q1 2020.
These reports, whose effective dates will be December 31, 2019, will provide a timely update to the current
Technical Reports by describing each assets operations and long term production profile. In the case of
Efemcukuru, this will result in a slight, non-material change to the existing mineral resources and reserves.
The Company remains on track to repay the $200 million Term Loan owing on its Senior Secured Credit
Facility over the next three year s. Eldorado will also look to reduce its cost of capital as market conditions
allow.
Eldorado has several high quality development projects, which it will consider advancing in a prudent fashion.
These projects have the potential to increase the Company’s production profile and cash flow. Skouries and
Perama Hill, both in Greece, are currently on care and maintenance. The Company is working with the Greek
government to advance these projects into construction. At Lamaque, the recent discovery of the Ormaque
zone offers further upside potential, particularly given its proximity to the proposed decline from Triangle to
the Sigma Mill. The Company has planned additional drilling at Ormaque in 2020 and will continue to study
the long-term potential at this project.
Five-Year Operational Outlook
TURKEY
Kisladag
For 2020, approximately 12 million tonnes of new ore at an average grade of 1.0 grams per tonne is expected
to be placed on the leach pad at Kisladag. Production is forecast to be 240,000-260,000 ounces of gold .
Cash operating costs are estimated to be $450-550 per ounce of gold sold. Gold produced in 2020 is
expected to come from ore stacked in 2019 as well as ore stacked in 2020, consistent with the longer leach
cycle.
Sustaining capital expenditures for 2020 are forecast to be approximately $25-30 million, spent primarily on
inter-lift liner, mobile equipment rebuilds and process infrastructure.
Growth capital of $70-80 million includes waste stripping, engineering and costs associated with the HPGR
circuit.
As part of the increase to the mine life at Kisladag, waste stripping (capitalized and operating) is required
and is expected to total approximately 193 million tonnes (LOM strip ratio of 1.1 to 1) . Waste stripping is
underway and is forecast to continue over the life of mine, the bulk of which will be completed from 2020-
2025.
Efemcukuru
3
In 2020, Efemcukuru is expected to mine and process over 510,000 tonnes of ore at an average grade of 6.9
grams per tonne gold , producing 90,000-100,000 ounces of gold at cash operating costs of $650-700 per
ounce of gold sold. Operating costs are forecast to be inline with 2019 actual operating costs.
The global market for concentrate has tightened recently, which has led to an increase in treatment charges.
Efemcukuru is installing two flotation columns in 2020, which are expected to be operational by H2 2020.
Concentrate grade and quality is expected to increase once these columns are operational, which is expected
to decrease total concentrate treatment charges.
Sustaining capital expenditures for 2020 are forecast to be approximately $15-20 million, spent primarily on
capitalized underground mine development, equipment rebuilds, column flotation and resource expansion
drilling.
CANADA
Lamaque
In 2020, Lamaque is expected to mine and process over 615,000 tonnes of ore at an average grade of 7.0
grams per tonne gold. Production is expected to be 125,000-135,000 ounces of gold at cash operating costs
of $575-625 per ounce of gold sold.
Sustaining capital expenditures for 2020 are forecast to be approximately $35-40 million, spent primarily on
capitalized underground mine development and mine and process facilities.
Growth capital of $5-10 million includes equipment purchases and construction of a larger dome stockpile to
replace the existing ore bins to support ramp-up of production.
Exploration drilling of nearly 50,000 metres is planned. This includes 29,000 metres of resource expansion
drilling in the lower Triangle Deposit, 10,000 metres further exploration drilling at the new Ormaque zone and
10,000 metres testing other targets on the Lamaque property.
The recent exploration success at the Triangle deposit has provided the opportunity to review options for
increasing throughput at the Sigma Mill, which has a current capacity of 2,200 tonnes per day. The Company
is in the process of permitting Triangle beyond the current permit limit of 1,800 tonnes per day. Once permits
are received, production at Triangle is expected to increase to 2,200 tonnes per day and gold production is
expected to increase to approximately 150,000 ounces per year by 2022.
The Company continues to evaluate other growth options to optimize Lamaque, including the underground
decline from the Triangle deposit to the Sigma Mill and options which would take advantage of this
infrastructure, including development of the recently discovered Ormaque zone.
GREECE
Olympias
In 2020, Olympias is expected to mine 415,000 tonnes of ore at an average grade of 7.4 grams per tonne of
gold, 104 grams per tonne of silver, 3% lead and 4% zinc. Payable production is expected to be 50,000-
60,000 ounces of gold, 950,000-1,000,000 ounces of silver, 9,500-10,000 tonnes of lead metal and 12,000-
12,500 tonnes of zinc metal. Cash operating costs, net of by -products, are expected to be $800-900 per
ounce of gold sold.
Global market conditions for base metal concentrates tightened in the second half of 2019 and are expected
to remain soft for 2020. This has led to an increase in treatment charges for the lead/silver and zinc
concentrates produced at Olympias and an increase to cash operating costs of approximately $150 per ounce
of gold.
4
Sustaining capital expenditures are expected to be $30-35 million on underground development, an infill
diamond drill program, mobile machinery and equipment rebuilds. In addition, 8,000 metres of drilling are
planned to test new exploration targets in the mine area.
Growth capital is expected to be $ 10-15 million for 2020, including underground maintenance facilities,
underground development relating to supporting increased mine production , and work on an expanded
substation.
The first two years of operations at Olympias have been challenging. Low rates of underground development
and backfilling led to lower than forecast production and higher than forecast costs per ounce. A contractor
was engaged in mid-2019 to focus on underground development and improvements have been made to the
paste backfill system. Production rates have increased quarter over quarter and progress is expected to
continue over the course of 2020 and into 2021.
The five -year outlook provided assumes that the Company proceeds with an expansion of Olympias to
650,000 tonnes per year. Further details of this expansion will be provided in the upcoming Olympias
technical report.
Skouries
Costs for 2020 are forecast to be $15-20 million, including costs associated with maintaining the site as well
as erecting the mill building, placing concrete , engineering, and permitting costs associated with dry-stack
tailings.
Skouries will remain on care and maintenance until the Company has reached an agreement with the Greek
government to establish the necessary investment framework.
Stratoni
For 2020, Stratoni is expected to process 230,000 tonnes of ore at grades of 6% lead, 8% zinc and 157
grams per tonne silver . Capital expenditures at Stratoni are expected to be $ 5-10 million including mine
mobile equipment purchases and overhauls , mine facility upgrades and upgrades to some of the process
facilities.
10,000 m of resource expansion drilling is planned for the year.
Five-Year Gold Production Outlook
February 2020 Outlook
Production (oz) 2020E 2021E 2022E 2023E 2024E
Kisladag 240,000 - 260,000 140,000 - 150,000 140,000 - 150,000 165,000 - 175,000 170,000 - 180,000
Lamaque 125,000 - 135,000 130,000 - 140,000 140,000 - 150,000 145,000 - 155,000 145,000 - 155,000
Efemcukuru 90,000 - 100,000 90,000 - 100,000 85,000 - 95,000 85,000 - 95,000 85,000 - 95,000
Olympias 50,000 - 60,000 55,000 - 65,000 60,000 - 70,000 75,000 - 85,000 75,000 - 85,000
Total 520,000 - 550,000 420,000 - 450,000 430,000 - 460,000 480,000 - 510,000 485,000 - 515,000
January 2019 Outlook
Production (oz) 2020E 2021E
Kisladag 240,000 - 260,000 75,000 - 95,000
Lamaque 125,000 - 135,000 125,000 - 135,000
Efemcukuru 90,000 - 100,000 90,000 - 100,000
Olympias 55,000 - 65,000 55,000 - 65,000
Total 520,000 - 550,000 350,000 - 380,000
5
2020 Cost and Capital Expenditure Guidance
2019A 2020E 2019A 2020E
Consolidated Costs Olympias
Cash Operating Cost – C1 ($/oz sold) 608 550 - 600 Cash Operating Cost – C1 ($/oz sold) 1,286 800 - 900
Total Operating Cost – C2 ($/oz sold) 645 600 - 650 Total Operating Cost – C2 ($/oz sold) 1,337 850 - 950
AISC ($/oz sold) 1,034 850 - 950 Sustaining Capital ($ millions) 20.1 30 - 35
Kisladag Corporate ($ millions)
Cash Operating Cost – C1 ($/oz sold) 435 450 - 500 General and Administrative 29.2 30
Total Operating Cost – C2 ($/oz sold) 469 490 - 530 Exploration1 21.9 20 - 25
Sustaining Capex ($ millions) 14.7 25 - 30
Growth Capital ($ millions)
Lamaque Kisladag 12.5 70-80
Cash Operating Cost – C1 ($/oz sold) 556 575 - 625 Olympias 6.1 10 - 15
Total Operating Cost – C2 ($/oz sold) 579 600 - 650 Lamaque 31.5 5 - 10
Sustaining Capex ($ millions) 38.2 35 - 40
Other Project Spending ($ millions)
Efemcukuru Skouries 7.9 15 - 20
Cash Operating Cost – C1 ($/oz sold) 599 650 - 700 Stratoni 9.3 5 - 10
Total Operating Cost – C2 ($/oz sold) 644 700 - 750 Tocantinzinho 3.5 3 - 5
Sustaining Capex ($ millions) 24.5 15 - 20 Certej 4.9 3 - 5
1 67% expensed and 33% capitalized.
2020 Commodity and Currency Price
Assumptions
Gold ($/oz) $1,400
Silver ($/oz) $18
Lead ($/mt) $2,100
Zinc ($/mt) $2,400
C$/US$ 1.3:1
EURO$/US$ 1:1.15
US$/TRY 6.2:1
Kisladag Minerals Reserves (effective January 17, 2020)
Reserve Classification Ore
(t x 1,000)
Grade Au
(g/t)
Contained Au
(oz x 1,000 )
Proven 164,531 0.73 3,851
Probable 8,644 0.57 159
Proven & Probable 173,175 0.72 4,010
Notes:
CIM Definition Standards (2014) were used for reporting the Mineral Reserves.
Mineral Reserves are estimated based on the following assumptions: metal prices of $1,250/oz Au; cut -off of 0.19 g/t recoverable Au (equivalent to a NSR
cut-off of $7.29/t); recovery is variable throughout the block model with average life of mine metallurgical recovery being 56% for all ore; and no dilution and
mining recovery of 100% (both already accounted for in the resource block model).
The Mineral Reserve is derived from the Measured and Indicated Mineral Resources. The block model supporting these resources has not changed since
March 2018 (other than depletion). The Mineral Reserve estimation is constrained by the December 31, 2019 topo surface.
About Eldorado Gold
Eldorado is a gold and base metals producer with mining, development and exploration operations in Turkey,
Canada, Greece, Romania, and Brazil. The Company has a highly skilled and dedicated workforce, safe and
responsible operations, a portfolio of high -quality assets, and long -term partnerships with local
communities. Eldorado's common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New
York Stock Exchange (NYSE: EGO).
Contacts
Investor Relations
Peter Lekich, Manager Investor Relations
604.687.4018 or 1.888.353.8166 [email protected]
Media
Louise Burgess, Director Communications & Government Relations
604.687.4018 or 1.888.353.8166 [email protected]
6
Cautionary Note about Forward-looking Statements and Information
Certain of the statements made and information provided in this press release are forward -looking statements or information within the meaning of the
United States Private Secu rities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward -looking statements and
forward-looking information can be identified by the use of words such as "plans", "expects", "is expected", "budget", “continue”, “ projected”, "scheduled",
"estimates", "forecasts", "intends", "anticipates", or "believes" or the negatives thereof or variations of such words and ph rases or statements that certain
actions, events or results "may", "could", "would", "might" or "will" be t aken, occur or be achieved.
Forward-looking statements or information contained in this release include, but are not limited to, statements or information with r espect to: our guidance
and outlook, including expected production, cost guidance and recoveries of gold, including increased heap leach recoveries through increased leach time
in conjunction with a high pressure grinding roll at Kisladag, favourable economics for our heap leaching plan and the abilit y to extend mine life at our
projects, including at Kisladag, improved production at Olympias, completion and results of the PEA at Lamaque and expanded production, completion of
construction at Skouries, expectations regarding repayment of outstanding debt, planned capital and exploration expen ditures; our expectation as to our
future financial and operating performance, expected metallurgical recoveries, improved concentrate grade and quality, gold p rice outlook and the global
concentrate market; and our strategy, plans and goals, including our proposed exploration, development, construction, permitting and operating plans and
priorities and related timelines and schedules and results of litigation and arbitration proceedings.
Forward-looking statements and forward -looking information by their n ature are based on assumptions and involve known and unknown risks, market
uncertainties and other factors, which may cause the actual results, performance or achievements of the Company to be materially different from any future
results, performance or achievements expressed or implied by such forward-looking statements or information.
We have made certain assumptions about the forward -looking statements and information, including assumptions about the geopolitical, economic,
permitting and legal climate that we operate in; the future price of gold and other commodities; the global concentrate market; exchange rates; anticipated
costs and expenses; production, mineral reserves and resources and metallurgical recoveries, the impact of acquisitions, disp ositions, suspensions or
delays on our business and the ability to achieve our goals. In particular, except where otherwise stated, we have assumed a continuation of existing
business operations on substantially the same basis as exists at the time of this rele ase.
Even though our management believes that the assumptions made and the expectations represented by such statements or informat ion are reasonable,
there can be no assurance that the forward -looking statement or information will prove to be accurate. Man y assumptions may be difficult to predict and
are beyond our control.
Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions pr ove incorrect, actual results
may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others,
the following: results of further testwork, recoveries of gold and other metals; geopolitical and economic climate (global an d local), risks related to mineral
tenure and permits; gold and other commodity price volatility; continued softening of the global concentrate market; risks re garding potential and pending
litigation and arbitration proceedings relating to the Company’s, busines s, properties and operations; expected impact on reserves and the carrying value;
the updating of the reserve and resource models and life of mine plans; mining operational and development risk; financing risks, foreign country operational
risks; risks of sovereign investment; regulatory risks and liabilities including, environmental regulatory restrictions and liability; discrepancies between actual
and estimated production, mineral reserves and resources and metallurgical testing and recoveries; additional funding requirements; currency fluctuations;
community and non-governmental organization actions; speculative nature of gold exploration; dilution; share price volatility and the price of the common
shares of the Company; competition; loss of key employe es; and defective title to mineral claims or properties, as well as those risk factors discussed in
the sections titled “Forward-Looking Statements” and "Risk factors in our business" in the Company's most recent Annual Information Form & Form 40 -F.
The reader is directed to carefully review the detailed risk discussion in our most recent Annual Information Form and other regulatory filings filed on SEDAR
under our Company name, which discussion is incorporated by reference in this release, for a fuller un derstanding of the risks and uncertainties that affect
the Company’s business and operations.
Forward-looking statements and information is designed to help you understand management’s current views of our near and longer term prospects, and
it may not be appropriate for other purposes.
There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially
from those anticipated in such statements. Accordingly, you shou ld not place undue reliance on the forward -looking statements or information contained
herein. Except as required by law, we do not expect to update forward -looking statements and information continually as conditions change.
Financial Information and condensed statements contained herein or attached hereto may not be suitable for readers that are unfamiliar with the Company
and is not a substitute for reading the Company’s financial statements and related MD&A available on our website and on SEDAR under our Company
name. The reader is directed to carefully review such document for a full understanding of the financial information summariz ed herein.
Except as otherwise noted, scientific and technical information contained in this press release was reviewed a nd approved by Paul Skayman, FAusIMM,
Special Advisor to the Chief Operating Officer, a "qualified person" under NI 43-101.