Energy Fuels Announces Q2‐2016 Results

Financials

Lakewood, Colorado – August 5, 2016 

Energy Fuels Inc. (NYSE MKT:UUUU; TSX:EFR) (“Energy Fuels” or the “Company”), today reported its financial results for the quarter ended June 30, 2016.  The Company’s quarterly report on Form 10‐Q has been  filed  with  the  U.S.  Securities  and  Exchange  Commission  (“SEC”),  and  may  be  viewed  on  the Electronic Document Gathering and  Retrieval System (“EDGAR”) at www.sec.gov/edgar.shtml, on  the System  for  Electronic  Document  Analysis  and  Retrieval  (“SEDAR”)  at  www.sedar.com,  and  on  the Company’s  website  at  www.energyfuels.com.    Unless  noted  otherwise,  all  dollar  amounts  are  in  US dollars.

Financial and Operational Highlights for the Quarter‐Ended June 30, 2016: 

  • $7.0 million of total revenue was realized by the Company.
  • Gross  Profit  of  $1.3  million  from  mining  and  milling  operations  was  realized  by  the  Company, resulting in an 18% Gross Profit margin.
  • 100,000 pounds of U3O8 sales were completed by the Company pursuant to a long‐term contract at an average realized price of $70.00 per pound.
  • The Company recovered 80,000 pounds of U3O8 from Nichols Ranch and 108,000 pounds of U3O8 from conventional sources.
  • At  June  30,  2016,  the  Company  had  $24.6  million  of  working  capital,  including  cash  and  cash equivalents of $14.4 million and approximately 360,000 pounds of uranium concentrate inventory.
  • A  net  loss  of  $10.4  million  was  realized  by  the  Company,  including  $3.5  million  of  development, permitting, and land holding costs primarily related to wellfield construction and continued shaft‐ sinking at the Canyon Project.
  • Shaft‐sinking  operations  continue  at  the  Canyon  Project.    The  shaft,  which  is  expected  to  be constructed to a total depth of 1,470 feet, is currently at a depth of approximately 1,100 feet.  An underground drilling program to further evaluate the Canyon deposit has commenced.

Acquisition Highlights for the Quarter‐Ended June 30, 2016: 

  • On  June  16,  2016,  the  Company  completed  the  acquisition  of  EFR  Alta  Mesa  LLC  (“Alta  Mesa”) (formerly named Mesteña Uranium, LLC), and the Alta Mesa Project through the issuance of 4.55 million shares.  The acquisition of the Alta Mesa Project is expected to expand Energy Fuels’ lower‐ cost uranium recovery operations.  The Alta Mesa Project includes a fully‐licensed and existing ISR processing plant currently on care and maintenance.  With certain capital expenditures and wellfield development,  the  project  is  expected  to  resume  uranium  recovery  operations  upon  sufficient improvement in uranium prices.
  • On  May  27,  the  Company  completed  the  acquisition  of  the  remaining  40%  interest  in  the  Roca Honda Project from Sumitomo Corporation through the issuance of 1.21 million shares as well as an additional $4.5 million of cash payable upon first commercial mining extraction from the property. The Company now owns 100% of the Roca Honda Project, which is one of the largest and highest‐ grade uranium projects in the U.S. and is in an advanced stage of permitting.

Stephen P. Antony, Energy Fuels’ President and CEO stated:  “During the last quarter, Energy Fuels continued  to  execute  its  business  plan  and  meet  guidance.    We  made  excellent  progress  in strengthening our lower‐cost uranium production portfolio, as we acquired the Alta Mesa ISR Project, extracted  80,000  pounds  of  uranium  from  eight  header‐houses  at  the  Nichols  Ranch  ISR  Project, packaged  108,000  pounds  from  conventional  sources,  and  continued  shaft‐sinking  and  resource evaluation at our Canyon Project.  In addition, we affirm our previously announced 2016 guidance of 550,000 pounds of contract sales and 950,000 pounds of uranium recovery.

“Unfortunately, the price of uranium continues to disappoint in 2016.  Put simply, the world is over‐ supplied with uranium today and end‐user demand is not yet sufficient to catalyze an uplift in prices. Amid this market uncertainty, we continue to deliver into our above‐market long‐term contracts, control costs,  rationalize  our  asset  portfolio,  and  preserve  Energy  Fuels’  optionality  to  significantly  increase production when prices improve.  As an example, while we expect to recover just under one million pounds of uranium in 2016, we currently have over 11.5 million pounds of uranium recovery capacity, and an industry‐leading U.S.‐based uranium resource portfolio to feed into that capacity.  I would argue that no other uranium mining company can claim these levels of scalability.”

Selected Summary Financial Information: 

Three months ended Six months ended $000, except per share data June 30, 2016 June 30, 2016

Results of Operations:

Total revenues$ 7,006 $25,002
Gross profit1,2888,760
Net loss attributable to the company(10,408)(19,216)
Basic and diluted earnings (loss) per share(0.20)(0.38)

As at June 30, As at December 31, 2016 2015 $000's

Financial Position:

Working capital$ 24,600 $34,869
Property, plant and equipment40,31429,069
Mineral properties93,63091,031
Total assets201,469192,280
Total long-term liabilities41,54238,675

Overview: 

The Company expects to recover approximately 950,000 pounds of U3O8 for the year ending December 31, 2016, as further described below.

The Company currently has finished goods inventory and uranium extraction and recovery capabilities that  exceed  the  commitments  contained  in  its  existing  sales  contracts.    As  a  result,  both  ISR  and conventional  uranium  extraction  and/or  recovery  have  been,  and  are  expected  to  continue  to  be, maintained at conservative levels until such time as market conditions improve sufficiently and/or the Company requires cash to meet its business needs.

ISR Uranium Segment: 

In response to market conditions, we currently plan to recover approximately 300,000 pounds of U3O8 from our ISR segment for the year ending December 31, 2016.

At  June  30,  2016,  the  Nichols  Ranch  wellfields  had  eight  header  houses  extracting  uranium.    The Company plans to complete a ninth header house by the end of 2016.  Further header houses will be completed as production needs and market conditions warrant.

Permitting  of  the  adjacent  Jane  Dough  Property  is  continuing  and  is  expected  to  be  completed  in advance  of  our  need  to  begin  wellfield  construction  at  this  location.    Also,  the  Hank  Project  is  fully permitted to be constructed as a satellite facility to the Nichols Ranch Plant.

Conventional Uranium Segment: 

The Company expects the White Mesa Mill to recover approximately 650,000 pounds of U3O8 for the year ending December 31, 2016.

The Company is planning to recover approximately 425,000 pounds of U3O8 extracted from its Pinenut Project.  During 2016, the Company also expects to recover approximately 225,000 pounds of U3O8 from alternate feed materials during the corresponding period.

The  White  Mesa  Mill  has  historically  operated  on  a  campaign  basis,  whereby  uranium  recovery  is scheduled  as  mill  feed,  cash  needs,  contract  requirements,  and/or  market  conditions  may  warrant. Once the Pinenut ore processing for 2016 concludes (expected to be in late 2016), the Company expects to recover uranium from certain alternate feed sources and process certain uranium bearing solutions into mid‐2017.  Once these processes are completed the Company expects to place uranium recovery activities  at  the  Mill  on  standby  until  additional  mill  feed  becomes  available.    The  Mill  will  dry  and package  material  from  the  Nichols  Ranch  Plant  and  continue  to  receive  and  stockpile  alternate  feed materials for future milling campaigns.

The  Company  is  continuing  shaft‐sinking  activities  at  the  Canyon  Project  and  has  completed  the installation of new equipment and infrastructure to optimize shaft sinking rates and realize construction cost savings.  We have also commenced additional underground drilling to further evaluate the deposit. The timing of our plans to extract and process mineralized materials from this project will be based on the  results  of  this  additional  evaluation  work,  along  with  market  conditions,  available  financing,  and sales requirements.

The Company expects to continue to pursue permitting activities at certain of its conventional projects, including the Roca Honda Project and the Sheep Mountain Project.  The Company will also continue to evaluate the Bullfrog Property at its Henry Mountains Project.  Expenditures for certain of these projects have been adjusted to coincide with expected dates of price recoveries based on our forecasts.

Sales: 

For  2016,  the  Company  forecasts  sales  under  its  existing  long‐term  contracts  to  total  approximately 550,000 pounds of U3O8.  Of this total, 400,000 pounds were delivered in the first half of the year with the remaining amount  to be delivered in the  third  quarter of the year.  The  prices for material sold under the existing long‐term contracts are either fixed or at floors.  The average sales price under the Company’s long‐term contracts is expected to be higher in 2016 than 2015 levels.

The  Company  also  sold  50,000  pounds  of  U3O8  to  a  utility  based  on  spot  prices  at  the  time  of  the contract.    The  Company  is  currently  monitoring  market  conditions  for  additional  sales  opportunities. The  Company  expects  to  sell  an  additional  200,000  pounds  of  U3O8  in  the  second  half  of  the  year. Selective  additional  spot  sales  may  be  made  as  necessary  to  generate  cash  for  operations  and development activities.

In  2017,  the  Company  expects  to  have  existing  inventory  or  expected  production  to  meet  all  of  its commitments to sell 620,000 pounds of uranium under its existing long‐term contracts at average sales prices higher than 2016 levels.

The Company is actively focused on its forward looking liquidity needs, especially in light of the current depressed  uranium  markets.   The  Company  is  evaluating  its  ongoing  fixed  cost  structure  as  well  as decisions  related  to  project  retention,  advancement  and  development.   Significant  development activities, if warranted, will require that we arrange for financing in advance of planned expenditures.

About Energy Fuels:  Energy Fuels is a leading integrated US‐based uranium mining company, supplying  U3O8 to major nuclear utilities.  Energy Fuels holds three of America’s key uranium production centers,  the  White  Mesa  Mill  in  Utah,  the  Nichols  Ranch  Processing  Facility  in  Wyoming,  and  the  Alta  Mesa  Project in Texas.  The White Mesa Mill is the only conventional uranium mill operating in the U.S. today  and has a licensed capacity of over 8 million pounds of U3O8 per year.  The Nichols Ranch Processing  Facility is an ISR production center with a licensed capacity of 2 million pounds of U3O8 per year.  Alta  Mesa is an ISR production center currently on care and maintenance.  Energy Fuels also has the largest  NI  43‐101  compliant  uranium  resource  portfolio  in  the  U.S.  among  producers,  and  uranium  mining  projects  located  in  a  number  of  Western  U.S.  states,  including  one  producing  ISR  project,  mines  on  standby,  and  mineral  properties  in  various  stages  of  permitting  and  development.    The  Company’s  common shares are listed on the NYSE MKT under the trading symbol “UUUU”, and on the Toronto Stock  Exchange under the trading symbol “EFR”.  The Company’s Debentures are listed on the Toronto Stock  Exchange under the trading symbol “EFR.DB.” 

CONVERSION FROM IFRS TO U.S. GAAP 

As previously announced, effective January 1, 2016, the Company became a ‘U.S. domestic issuer’ for SEC  reporting  purposes  and  is  therefore  required  to  prepare  its  financial  statements  in  accordance  with  United States Generally Accepted Accounting Principles (“U.S. GAAP”).  All prior financial statements and  selected financial data have been converted from International Financial Reporting Standards (“IFRS”)  into U.S. GAAP for all periods required to be presented in the financial statements and selected financial  data. 

ADDITIONAL NON‐US GAAP FINANCIAL PERFORMANCE MEASURES 

The  Company  has  included  the  additional  non‐US  GAAP  measure  “Gross  Profit”  in  the  financial  statements and in this news release.  Management noted that “Gross Profit” provides useful information  to investors as an indication of the Company’s principal business activities before consideration of how  those activities are financed, sustaining capital expenditures, corporate and exploration and evaluation  expenses, finance income and costs, and taxation. 

CAUTIONARY STATEMENT REGARDING FORWARD‐LOOKING STATEMENTS  

This news release contains certain “Forward Looking Information” and “Forward Looking Statements”  within the meaning of applicable Canadian and United States securities legislation, which may include,  but is not limited to, statements with respect to the future financial or operating performance of the  Company  and  its  projects,  including:  production  and  sales  forecasts;  expected  timelines  for  the  permitting and development of projects; the Company’s expectations as to longer term fundamentals in  the market and price projections; the Company’s expectations as to expenditures and cost reductions;  the Company’s ability to preserve its cash resources and maintain its resource base; scalability, and the  Company’s ability to be able to restart or increase production as market conditions warrant; the ability of  the  Company  to  realize  the  expected  benefits  of  the  Alta  Mesa  and  Roca  Honda  acquisitions;  the  expected  development  and  evaluations  at  the  Canyon  Project;  the  expected  costs  at  the  Company’s  Nichols Ranch Project, Canyon Project, and other projects and facilities; expectations that sufficient mill  feed will be available to sustain future campaigns at the White Mesa Mill; and expectations to become  or maintain its position as a leading uranium company in the United States.  Generally, these forward‐ looking  statements  can  be  identified  by  the  use  of  forward‐looking  terminology  such  as  “plans”,  “expects” “does not expect”, “is expected”, “is likely”, “budget” “scheduled”, “estimates”, “forecasts”,  “intends”, “anticipates”, “does not anticipate”, or “believes”, or variations of such words and phrases, or  state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur”,  “be achieved” or “have the potential to”.  All statements, other than statements of historical fact, herein  are  considered  to  be  forward‐looking  statements.   Forward‐looking  statements  involve  known  and  unknown  risks,  uncertainties  and  other  factors  which  may  cause  the  actual  results,  performance  or  achievements  of  the  Company  to  be  materially  different  from  any  future  results,  performance  or  achievements  express  or  implied  by  the  forward‐looking  statements.   Factors  that  could  cause  actual  results  to  differ  materially  from  those  anticipated  in  these  forward‐looking  statements  include:    risks  associated with estimating production, forecasting future price levels necessary to support production,  scalability, and the Company’s ability to restart or increase production in response to any increase in  commodity prices; risks inherent in the Company’s and the industry’s forecasts or predictions of future  uranium prices; risks of delays in obtaining permits and licenses that could impact expected production  levels or increases in expected production levels; risks in meeting expected timelines for the development  of projects; government and third party actions with respect to supplies of secondary sources of uranium;  fluctuations or changes in the market prices of uranium; risks associated with the integration of the Alta  Mesa and Roca Honda acquisitions; risks associated with the expected development and evaluations at  the  Canyon  Project;  risks  associated  with  estimated  expected  costs  at  the  Company’s  Nichols  Ranch  Project,  Canyon  Project,  and  other  projects  and  facilities;  the  risk  that  sufficient  mill  feed  will  not  be  available to sustain future campaigns at the White Mesa Mill; the risk that uranium prices will not reach  the levels required to justify further development or production at the Company’s projects, including the  White Mesa Mill, the Nichols Ranch Project, the Alta Mesa Project and the Roca Honda Project; the risk  that the Company will not be able to enter into suitable term uranium sales contracts in the future to  support future development and production decisions; and the other factors described under the caption  “Risk Factors” in the Company’s Annual Report on Form 10‐K dated March 15, 2016, which is available  for review on EDGAR at www.sec.gov/edgar.shtml, on SEDAR at www.sedar.com, and on the Company’s  website  at  www.energyfuels.com.    Forward‐looking  statements  contained  herein  are  made  as  of  the  date of this news release, and the Company disclaims, other than as required by law, any obligation to  update any forward‐looking statements whether as a result of new information, results, future events,  circumstances, or if management’s estimates or opinions should change, or otherwise.  There can be no  assurance that forward‐looking statements will prove to be accurate, as actual results and future events  could differ materially from those anticipated in such statements.  Accordingly, the reader is cautioned  not  to  place  undue  reliance  on  forward‐looking  statements.    The  Company  assumes  no  obligation  to  update the information in this communication, except as otherwise required by law. 

INVESTOR INQUIRIES: 

Energy Fuels Inc.

Curtis Moore VP – Marketing and Corporate Development (303) 974‐2140 or Toll free: (888) 864‐2125 [email protected] www.energyfuels.com