Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EDR.TO ·

Endeavour Silver Reports Positive Surface Drilling and Underground Sampling Results for the Parral Project, Chihuahua, Mexico

Corporate Updates

Endeavour Silver Reports Positive Surface Drilling and Underground Sampling

Results for the Parral Project, Chihuahua, Mexico

VANCOUVER, British Columbia, Dec. 12, 2018 -- Endeavour Silver Corp. (NYSE: EXK; TSX: EDR ) announces that it has

completed exploration work and reports positive results from its surface drilling and underground sampling programs at the

Parral Project located in Chihuahua state, Mexico in 2018. 

Bradford Cooke, Endeavour CEO commented, “With the success of the 2018 surface drilling, underground sampling and

metallurgical testing programs, management now views the Parral Project as having good potential to become a profitable new

mine. The Parral Project was our second largest exploration expenditure (after Terronera) this year and represents an

important part of our growth strategy.

“Specifically, we have now mapped, sampled and/or drilled four mineralized silver vein systems that have either underground or

open pit mining potential, and the probability to delineate additional new resources remains high. Endeavour plans to complete

an updated resource estimate, a preliminary economic assessment and commence mine permitting, in addition to more

definitive drilling, underground sampling and metallurgical testing in 2019.”

The following is a short summary of the Hidalgo de Parral district and Endeavour’s land holdings there.

Parral Project Overview

• Hidalgo de Parral is an historic silver mining district that produced approximately 250 million ounces (oz) of silver

according to the SGM, the Mexican Geological Survey. Several mines are still operating in the district, including the

large Santa Barbara and San Francisco mines of Grupo Mexico and Grupo Frisco respectively. 

• Endeavour owns a 100% interest in four historic mines, Veta Colorada, La Palmilla, San Patricio and Cometa, totalling

3,432 hectares, subject to 1% NSR production royalties. The Palmilla mine was famous for supplying silver to the

federal mint of Mexico in the late 1800’s.

• The properties are readily accessible by paved highway and well maintained gravel roads only 1-5 kilometres (km) north

of the city of Hidalgo Del Parral, with excellent infrastructure including grid power, water, labour, and services. Land

access agreements are already in place for exploration.

• Several large veins are traceable for over 8 km. Veta Colorada is up to 40 metres (m) thick, and includes a higher-grade

footwall vein 1-10 m thick and a lower grade hanging wall breccia with mineralized stock-work up to 30 m thick.

• Historic resources of 32.1 million oz silver contained in 4.0 million tonnes (t) grading 248.5 grams per tonne (gpt) in the

Veta Colorada estimated by Industrial Minera Mexico, S.A. de C.V. (“IMMSA”) who discovered three orebodies,

Remedio-Argentina, El Verde and Sierra Plata and mined the latter two orebodies until closing in 1990. In early 2018,

Endeavour estimated new resources at Remedio-Argentina and Palmilla, and the Company expects to add new

resources at San Patricio in Q1,2019. Endeavour has not yet verified the historic resources at Veta Colorada and has

previously reported resources at Cometa (see Mineral Reserve and Resource Estimates on the website for details). The

Veta Colorada resource estimate was prepared by IMMSA in a report dated August 2004 entitled “Descripción

Geológica, Proyecto Veta Colorada Mpio. de Hgo. del Parral, Chih.”. The resource estimate was established through

surface drilling and underground sampling. A Qualified Person has not done sufficient work to classify the historical

estimate as a current mineral resource or mineral reserve. Endeavour is not treating the historical estimate as a current

mineral resource or mineral reserve, has not verified the historical resource estimate and is not relying on it.

• Historic metallurgy by IMMSA obtained 85% silver recoveries by flotation and leaching of float tails. Limited

metallurgical studies by SSR of the Veta Colorada ore indicated >90% recovery by cyanidation.

• Endeavour metallurgical testing of drill core samples from the Veta Colorada (Sierra Plata, El Verde and Remedios-

Argentina zones), Palmilla and Cometa veins on the Parral property in 2018 indicates excellent metal recoveries by

flotation and leaching. Cometa is the only vein with significant lead and zinc best suited for flotation, the other veins

contain primarily silver and minor gold best suited to leaching.  Silver recoveries achieved up to 91% recovery by whole

rock leaching of Remedios-Argentina core, up to 91% recovery by flotation of Cometa core, and up to 98% recovery by

flotation and leaching of the float tails of El Verde core.

Surface Drill Results

In 2018, Endeavour drilled 16 surface drill holes totalling 8171 m to test the San Patricio vein system. A new inferred resource

estimate for the San Patrico area is anticipated in early 2019.  Initial high grade intersections were previously reported (see

Endeavour News Release dated May 14, 2018)  and the balance of the high grade intersections are reported in the table below

(view San Patricio longitudinal section here).

Hole Structure From True

width Au Ag AgEq Pb Zn

(m) (m) (gpt) (gpt) (gpt) (%) (%)

SPT-23 San Patricio 321.40 1.9 0.10 660 668 1.298 0.576

  Including 321.75 0.2 0.08 1,460 1,466 1.105 0.544

SPT-24 San Patricio 363.20 4.2 0.21 934 950 3.014 5.929

  Including 365.35 0.2 0.31 3,210 3,233 7.940 13.500

Silver equivalents are calculated at a ratio of 75:1 silver: gold, excluding base metals

Underground Sample Results

Endeavour also completed topographical surveys, geological mapping and rock chip sampling underground in the Sierra Plata

part of the Veta Colorada mine, mainly on mine levels 5, 5.5, 6 and 7, accessed by the original mine access ramp, which

remains in good condition. Significant grades and widths of silver-lead-zinc mineralization were encountered on the 5.5 mine

level as follows:

Sample ID Width (m) Structure Ag (gpt) Pb (%) Zn (%)

PAR-1453 muck Rezaga 331.2 1.420 0.957

PAR-1454 muck Rezaga 274.1 0.214 0.277

PAR-1455 2.00 Vn, HW, STK 204.2 0.594 0.146

PAR-1456 muck Rezaga 192.6 0.244 0.314

Sampling crews were also able to access portions of levels 1, 2, 3 and 4 where they encountered significant volumes of

historic mine fill (previously uneconomic broken rock filing old stopes, known as “chorros”).  Grupo Mexico (IMMSA) and SSR

each sampled these areas and IMMSA reported historic resources of 214,257 tonnes grading 156 gpt silver. A qualified person

has not done sufficient work to classify this historical estimate as a current mineral resource, Endeavour has not verified the

historical resource and is not relying on it as a current mineral resource.

Endeavour crews resampled these chorros and confirmed that the historic sample results show that some chorros have the

potential to be economic, as shown in the table below:

Veta Colorada Chorros Level 2

Sample ID Ag (g/t) Pb % Zn%

PAR-1457 38.0 0.1440 0.177

PAR-1458 88.0 0.2000 0.191

PAR-1459 67.0 0.2300 0.244

PAR-1460 47.0 0.4420 0.280

PAR-1461 180.6 0.6250 0.478

PAR-1462 177.7 0.6640 0.622

PAR-1463 84.0 0.3910 0.348

PAR-1464 66.0 1.3600 0.573

PAR-1465 52.0 0.1930 0.296

PAR-1466 153.3 0.2940 0.344

PAR-1467 41.0 0.8510 0.638

PAR-1468 50.0 0.7590 0.372

PAR-1469 195.1 0.7140 0.267

PAR-1470 315.1 0.4530 0.568

PAR-1471 49.0 0.1850 0.289

PAR-1472 242.6 0.3140 0.319

PAR-1473 35.0 0.1680 0.301

PAR-1474 32.0 0.1400 0.245

Veta Colorada Chorros Level 4

Sample ID Ag (g/t) Pb% Zn%

PAR-1475 40.0 0.2250 0.1450

PAR-1476 203.2 0.4740 0.7080

PAR-1477 71.0 0.2270 0.4860

PAR-1478 221.8 0.3840 0.5080

PAR-1479 229.0 0.2780 0.5000

PAR-1480 278.1 0.5100 0.5990

PAR-1481 290.5 0.4230 0.6540

PAR-1482 144.4 0.1860 0.2450

PAR-1483 244.8 0.5170 0.5420

PAR-1484 239.1 0.4090 0.3110

PAR-1485 74.0 0.1870 0.1480

PAR-1486 75.0 0.2190 0.1310

PAR-1487 64.0 0.2430 0.4690

PAR-1488 170.2 0.4340 0.3430

PAR-1489 115.0 0.5960 0.3730

PAR-1490 63.0 0.1320 0.2660

PAR-1491 223.7 0.3400 0.4510

PAR-1492 88.0 0.2310 0.4200

PAR-1493 24.0 0.1680 0.2360

PAR-1494 283.4 1.2000 0.5960

PAR-1495 78.0 0.4100 0.4730

PAR-1496 230.0 1.9400 0.7030

PAR-1497 238.3 0.7830 0.7300

PAR-1498 614.6 1.8100 0.5010

Qualified Person

Godfrey Walton, M.Sc., P.Geo., Endeavour’s President and COO, is the Qualified Person who reviewed and approved this

news release and supervised the drilling programs in Mexico. A Quality Control sampling program of reference standards,

blanks and duplicates is used to monitor the integrity of all assay results. All samples are split at the local field office and

shipped to ALS-Chemex Labs, where they are dried, crushed, split and 50 gram pulp samples are prepared for analysis. Gold

is determined by fire assay with an atomic absorption (AA) finish and silver by aqua regia digestion and ICP finish, overlimits

by fire assay and gravimetric finish.

About Endeavour Silver – Endeavour Silver Corp. is a mid-tier precious metals mining company that owns three high-grade,

underground, silver-gold mines in Mexico. Endeavour is currently commissioning its fourth mine at El Compas, advancing a

possible fifth mine at the Terronera mine project and exploring its portfolio of exploration and development projects in Mexico

and Chile to facilitate its goal to become a premier senior silver producer.  Our philosophy of corporate social integrity creates

value for all stakeholders.

SOURCE Endeavour Silver Corp. 

Contact Information - For more information, please contact:

Galina Meleger, Director Investor Relations

Toll free: (877) 685-9775

Tel: (604) 640-4804

Fax: (604) 685-9744

Email:  [email protected] 

Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation

reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such

forward-looking statements and information herein include but are not limited to statements regarding Endeavour’s anticipated

performance in 2018 including changes in mining and operation, anticipated results of exploration and resource

determinations,  and the timing and results of various activities. The Company does not intend to, and does not assume any

obligation to, update such forward-looking statements or information, other than as required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause

the actual results, level of activity, performance or achievements of Endeavour and its operations to be materially different

from those expressed or implied by such statements. Such factors include, among others, changes in national and local

governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico;

financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining

activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and

development, risks in obtaining necessary licenses and permits, and challenges to the Company’s title to properties; as well

as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information

Form filed with the S.E.C. and Canadian securities regulatory authorities.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to:

the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities,

mining operations will operate and the mining products will be completed in accordance with management’s expectations and

achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company

has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-

looking statements or information, there may be other factors that cause results to be materially different from those

anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or

information will prove to be accurate as actual results and future events could differ materially from those anticipated in such

statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.