Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EDR.TO ·

Endeavour Silver Reports Positive Drill Results for the Parral Project

Drill Results

Endeavour Silver Reports Positive Drill Results for the Parral Project

(All amounts are in US dollars, unless otherwise stated)

VANCOUVER, British Columbia, Dec. 16, 2021 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (TSX: EDR, NYSE:

EXK) is pleased to report positive drill results from its ongoing exploration program at the 3,432-hectare Parral project situated

in the State of Chihuahua, Mexico. 

During the last 11 months, until the end of November, the Company has drilled over 14,000 metres in 59 holes targeting

several areas along the La Colorada vein.

Highlights from Recent Drill Results

• 2,846 gpt Ag, 0.65% Cu over a 0.89 m ETW, including 3,380 gpt Ag, 0.77% Cu over 0.75 m (VCS-10)

• 840 gpt Ag, 0.11 gpt Au, 0.25% Cu, 9.09% Pb and 4.74% Zn for 1,288 gpt AgEq over a 2.77 m ETW, including

1,585 gpt Ag, 0.26 gpt Au, 0.55% Cu, 34.88% Pb and 4.38% Zn for 2,755 gpt AgEq over 0.36 m (VCU-38)

• 708 gpt Ag, 0.55 gpt Au, 0.16% Cu, 10.95% Pb and 12.38% Zn for 1,504 gpt AgEq over a 1.23 m ETW, including

1,130 gpt Ag, 0.91 gpt Au, 18.95% Pb and 18.70% Zn for 2,406 gpt AgEq over 0.69 m (VCU-50)

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; Cu: copper; Pb: lead; Zn: zinc; ETW: estimated true width;

m: metre; HW: hanging wall. Silver equivalents are calculated at a ratio of 80:1 silver:gold, silver price of $23 per troy ounce,

copper price of $3.45 per pound, lead price of $0.90 per pound and zinc price of $1.20 per pound.

“The Parral project continues to deliver great results,” commented Dan Dickson, Chief Executive Officer. “Following limited

drilling in 2020 due to the pandemic, it was a priority for our exploration team to re-start the exploration program at Parral this

year to expand on the mineral resource estimate we published on the project in early 2020. Our goal is to continue the drill

program at Parral in 2022 as we get closer to achieving the scale required to support a positive economic assessment.”

The Parral project, which was acquired by Endeavour Silver in 2016, is in Hidalgo de Parral, a large historic silver mining

district adjacent to the city of Parral, in the State of Chihuahua, Mexico. The project district comprises classic, high-grade

silver, epithermal vein deposits, characterized by low-sulphidation mineralization. The property is accessible by paved and

gravel roads and has access to the local power grid.

The Veta Colorada (including the Sierra Plata and El Verde mines) was a past producing mining operation owned by Grupo

Mexico that closed in 1991 due to low silver prices. Mineralization, which occurs in a major silver vein structure that ranges

from 1 to 30 metres thick, was mined seven levels down to 300-metre depths below surface in places and was traced for seven

kilometres.

The Company filed a NI 43-101 technical report on the Parral project, State of Chihuahua, Mexico on March 14, 2020. As of

December 31, 2019, Parral had estimated indicated mineral resources of 613,000 tonnes, containing 4.0 million ounces of

silver grading 207 g/t, 6,800 ounces of gold grading 0.35 g/t, 17.5 million pounds of lead grading 0.63%, and 16.5 million

pounds of zinc grading 0.61%. Inferred mineral resources are estimated to total 4.04 million tonnes containing 35.0 million

ounces of silver grading 269 g/t, 62,800 ounces of gold grading 0.48 g/t, 65.0 million pounds of lead grading 0.35%, and 64.3

million pounds of zinc grading 0.35%.

Due to the COVID-19 pandemic, the Company suspended the Parral drill programs in early 2020 and resumed drilling in 2021.

The Parral drill results are summarized in the following tables:

Parral - Veta Colorada Sierra Plata Shallow

Hole Structure From True Width Au Ag Cu Pb Zn AgEq

(m) (m) (gpt) (gpt) (%) (%) (%) (gpt)

VCS-07 Veta Colorada 264.25 2.19 0.01 232 0.01 0.08 0.15 241

Including 265.80 0.72 <0.005 288 0.02 0.08 0.08 296

VCS-10 Veta Colorada 219.35 0.89 0.01 2,846 0.65 0.00 0.01 2,914

Including 219.50 0.75 0.01 3,380 0.77 0.00 0.01 3,461

VCS-12 Veta Colorada 196.75 1.20 0.01 340 0.04 0.32 0.60 374

Including 196.75 0.86 0.01 384 0.04 0.36 0.65 422

Note: Drill holes VCS-8, VCS-9, VCS-11, VCS 13, VCS-29, VCS-30, VCS-31 and VCS-32 returned no significant results

Parral - Veta Colorada San Joaquin (view Veta Colorada (San Joaquin) longitudinal sections)

Hole Structure From True Width Au Ag Cu Pb Zn AgEq

(m) (m) (gpt) (gpt) (%) (%) (%) (gpt)

VCS-18 Veta Colorada 164.10 1.89 2.27 92 0.02 3.35 1.90 434

Including 164.10 0.70 5.79 193 0.01 0.05 0.14 663

VCS-19 Veta Colorada 173.65 1.30 1.05 470 0.18 4.51 9.95 1,050

Including 174.20 0.81 1.51 744 0.24 5.72 9.15 1,370

VCS-20 Veta Colorada 230.85 2.76 0.98 59 0.14 2.72 2.75 322

Including 231.85 0.62 3.83 91 0.27 6.90 1.81 675

VCS-21 Veta Colorada 186.00 1.47 0.28 28 0.22 2.87 1.71 211

Including 187.40 0.33 0.75 91 0.84 10.35 3.06 624

VCS-24 Veta Colorada 254.20 3.95 1.38 41 0.19 2.20 2.83 332

Including 257.25 0.68 1.69 116 0.22 7.05 4.82 635

VCS-25 Veta Colorada 262.85 1.60 0.22 50 0.14 3.02 6.53 396

Including 263.45 0.31 0.27 105 0.23 6.34 17.30 939

VCS-26 Veta Colorada 313.15 1.11 0.14 15 0.02 2.07 2.19 163

Including 313.65 0.37 0.22 38 0.05 5.63 5.22 399

VCS-27 Veta Colorada 325.65 1.40 1.43 54 0.20 1.78 4.87 411

Including 326.20 0.59 2.12 43 0.20 1.86 5.69 486

VCS-28 Veta Colorada 244.50 4.24 0.27 29 0.09 3.08 3.47 266

Including 244.50 0.39 0.18 97 0.24 7.12 5.42 521

Note: Drill holes VCS-15, VCS-16, VCS-17, VCS-22 and VCS-23 returned no significant results

Parral - Veta Colorada Sierra Plata Deep (view Veta Colorada (Sierra Plata) longitudinal sections)

Hole Structure From True Width Au Ag Cu Pb Zn AgEq

(m) (m) (gpt) (gpt) (%) (%) (%) (gpt)

VCU-21 Veta Colorada 66.50 1.41 0.03 198 0.03 0.60 0.76 247

Including 67.20 0.73 0.04 288 0.05 0.89 1.39 370

VCU-22 Veta Colorada 88.50 0.93 0.01 247 0.05 0.53 0.97 302

Including 88.95 0.46 0.02 436 0.09 0.82 1.66 528

VCU-24 Veta Colorada 85.15 2.00 0.01 263 0.02 0.56 0.25 290

Including 85.55 0.39 0.01 340 0.02 0.15 0.22 355

VCU-25 Veta Colorada 103.80 1.13 0.02 176 0.02 0.22 0.24 193

Including 105.00 0.38 0.03 220 0.02 0.19 0.35 241

VCU-26 Veta Colorada 107.30 0.93 0.02 169 0.01 0.18 0.10 180

VCU-27 Hw Veta Colorada 146.15 1.12 0.01 164 0.00 0.06 0.20 173

Including 146.15 0.33 <0.005 189 0.00 0.05 0.15 196

VCU-28 Veta Colorada 95.60 0.88 0.01 196 0.01 0.22 0.24 213

Including 96.10 0.22 0.02 257 0.01 0.35 0.30 280

VCU-30 Veta Colorada 172.00 1.81 0.06 263 0.03 0.61 2.02 360

Including 176.10 0.26 0.32 425 0.12 0.24 10.20 834

VCU-31 Veta Colorada 160.50 1.13 0.06 224 0.02 0.27 0.27 248

Including 161.45 0.30 0.05 365 0.04 0.27 0.46 397

VCU-32 Veta Colorada 156.20 1.08 0.02 247 0.03 0.19 0.32 269

Including 156.80 0.52 0.02 294 0.04 0.22 0.27 315

VCU-33 Veta Colorada 206.30 0.73 0.03 166 0.02 0.39 0.16 186

VCU-35 Veta Colorada 196.00 1.47 0.03 266 0.15 1.65 2.82 429

Including 196.70 0.44 0.03 381 0.22 1.08 2.63 529

VCU-47 Veta Colorada 111.80 1.76 0.02 158 0.03 1.33 0.70 224

Including 111.80 0.56 0.02 284 0.08 3.86 1.84 464

VCU-48 Veta Colorada 161.35 5.77 0.04 417 0.04 1.41 0.46 478

Including 163.65 0.27 0.13 4,170 0.32 16.55 1.24 4,702

VCU-49 Veta Colorada 178.65 2.48 0.13 761 0.15 0.17 5.37 984

Including 179.75 0.25 0.10 1,115 0.29 0.00 6.94 1,401

VCU-50 Veta Colorada 100.30 1.23 0.55 708 0.16 10.95 12.38 1,504

Including 100.30 0.69 0.91 1,130 0.25 18.95 18.70 2,406

VCU-53 Veta Colorada 85.20 1.17 0.01 178 0.01 0.24 0.11 190

Including 85.20 0.54 0.01 223 0.01 0.31 0.12 237

VCU-55

Hw Veta Colorada 83.45 1.2 0.02 164 0.06 0.47 1.04 221

Including 83.45 0.3 0.01 290 0.13 0.80 0.68 350

Veta Colorada 96.50 1.2 0.03 84 0.02 0.66 1.25 151

Including 97.00 0.3 0.04 146 0.03 1.29 2.48 275

VCU-57 Veta Colorada 170.90 1.0 0.02 139 0.03 1.52 1.46 237

Including 172.50 0.3 0.03 212 0.04 1.76 3.30 384

Note: Drill holes VCU-23, VCU-29, VCU-34, VCU-44, VCU-45, VCU-46, VCU-51, VCU-52, VCU-54 and VCU-56 returned no

significant results

Parral - Veta Colorada El Verde (view Veta Colorada (El Verde) longitudinal sections)

Hole Structure From True Width Au Ag Cu Pb Zn AgEq

(m) (m) (gpt) (gpt) (%) (%) (%) (gpt)

VCU-36

Hw Veta Colorada 100.75 2.30 0.09 182 0.08 3.17 2.84 384

Including 102.55 0.56 0.13 224 0.09 4.04 2.15 428

Veta Colorada 106.90 3.64 1.52 253 0.11 3.87 2.39 575

Including 111.45 0.26 0.88 953 0.38 1.96 1.64 1,173

VCU-37

Hw Veta Colorada 128.70 3.31 0.20 198 0.06 2.54 2.57 381

Including 131.35 0.42 0.52 319 0.07 10.35 8.52 950

Veta Colorada 135.65 1.61 0.20 201 0.02 0.99 2.58 339

Including 136.75 0.42 0.31 346 0.05 1.47 6.69 654

VCU-38

Hw Veta Colorada 238.15 1.75 0.05 204 0.07 0.78 1.17 278

Including 240.00 0.33 0.08 541 0.20 0.81 2.16 667

Veta Colorada 245.25 2.77 0.11 840 0.25 9.09 4.74 1,288

Including 247.00 0.36 0.26 1,585 0.55 34.88 4.38 2,755

VCU-40 Veta Colorada 236.55 3.70 0.25 321 0.14 4.93 4.46 648

Including 238.80 0.46 0.20 1,030 0.44 7.03 7.43 1,546

VCU-41 Veta Colorada 198.60 6.38 0.08 325 0.28 0.78 2.42 467

Including 205.50 0.44 0.13 702 0.40 0.66 2.98 878

VCU-43

Hw Veta Colorada 163.65 1.60 0.16 240 0.05 0.26 0.48 281

Including 163.65 0.52 0.02 380 0.02 0.09 0.15 391

Veta Colorada 166.50 2.36 0.05 251 0.03 0.28 0.48 284

Including 168.50 0.54 0.07 606 0.03 0.45 0.43 643

Notes:

1.  Drill holes VCU-39 and VCU-42 returned no significant results

2.  Silver equivalents are calculated using the formula:

[Au (gpt) X 80] + Ag (gpt) + [Cu (%) X 2204.6 X Cu Price / Ag Price X 31.1] + [Pb (%) X 2204.6 X Pb Price / Ag Price X 31.1] +

[Zn (%) X 2204.6 X Zn Price / Ag Price X 31.1]

3.  Price assumptions used are: Cu $3.45, Pb $0.90, Zn $1.20 and Ag $23.00

4.  All widths are estimated true widths

5.  No capping has been applied but high-grade intervals have been highlighted

Qualified Person and QA/QC - Dale Mah, P.Geo., Vice President Corporate Development of Endeavour Silver, is the

Qualified Person who reviewed and approved the technical information contained in this news release. A quality control

sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of all assay

results. All samples are split at the local field office and shipped to SGS Labs, where they are dried, crushed, split and 250

gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption finish and silver by

aqua regia digestion with ICP finish, over-limits by fire assay and gravimetric finish.

About Endeavour Silver – Endeavour Silver is a mid-tier precious metals mining company that operates two high-grade,

underground, silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development

decision, pending financing and final permits and exploring its portfolio of exploration and development projects in Mexico,

Chile and the United States to facilitate its goal to become a premier senior silver producer. The Company’s philosophy of

corporate social integrity creates value for all stakeholders.

SOURCE Endeavour Silver Corp.

Contact Information

Trish Moran

Interim Head of Investor Relations

Tel: (416) 564-4290

Email: [email protected]

Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation

reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such

forward-looking statements and information herein include but are not limited to statements regarding future prospects of the

Company’s mines and projects. The Company does not intend to and does not assume any obligation to update such forward-

looking statements or information, other than as required by applicable law. 

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause

the actual results, level of activity, production levels, performance or achievements to be materially different from those

expressed or implied by such statements. Such factors include but are not limited to the ultimate impact of the COVID 19

pandemic on operations and results, changes in production and costs guidance, national and local governments, legislation,

taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious

metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of

mineral exploration, development and mining; the speculative nature of mineral exploration and development and risks in

obtaining necessary licenses and permits,

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to:

the continued exploration and mining operations, no material adverse change in the market price of commodities, mining

operations will operate and the mining products will be completed in accordance with management’s expectations and achieve

their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has

attempted to identify important factors that could cause actual results to differ materially from those contained in forward-

looking statements or information, there may be other factors that cause results to be materially different from those

anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or

information will prove to be accurate as actual results and future events could differ materially from those anticipated in such

statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.