Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EDR.TO ·

Endeavour Silver Reports Positive Drill Results for the Parral Project

Drill Results

Endeavour Silver Reports Positive Drill Results for the Parral Project

VANCOUVER, British Columbia, April 26, 2022 -- Endeavour Silver Corp. (TSX: EDR, NYSE: EXK) is pleased to report

positive drill results from its ongoing exploration program at its Parral project in the State of Chihuahua, Mexico. Since early

December, the Company has drilled over 4,300 metres in 21 holes targeting several areas along the Veta Colorada structure. 

Highlights from Recent Drill Results

• 392 gpt Ag, 0.02 gpt Au, 0.035% Cu, 0.63% Pb and 2.06% Zn for 488 gpt AgEq over a 3.27 m ETW, including 1,895

gpt Ag, 0.05 gpt Au, 0.156% Cu, 3.7% Pb and 6.98% Zn for 2,234 gpt AgEq over 0.17 m (VCU-67)

• 513 gpt Ag, 0.07 gpt Au, 0.111% Cu, , 1.99% Pb and 1.69% Zn for 644 gpt AgEq over a 1.96 m ETW, including

1,160 gpt Ag, 0.21 gpt Au, 0.231% Cu, 2.71% Pb and 4.63% Zn for 1,439 gpt AgEq over 0.39 m (VCU-69)

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; Cu: copper; Pb: lead; Zn: zinc; ETW: estimated true width;

m: metre; HW: hanging wall. Silver equivalents are calculated at a ratio of 80:1 silver:gold, silver price of $23 per troy ounce,

copper price of $3.45 per pound, lead price of $0.90 per pound and zinc price of $1.20 per pound.

“These results increase our confidence that we are on the right path towards attaining the estimated mineral resource base

necessary to advance the Parral project,” commented Dan Dickson, Chief Executive Officer. “We anticipate preparing a

preliminary economic assessment starting late this year.”

History of the Property

The Parral project, which was acquired by Endeavour Silver in 2016, is in Hidalgo de Parral, a large historic silver mining

district adjacent to the city of Parral, in the State of Chihuahua, Mexico. Classic, high-grade silver, epithermal vein deposits

are present in the project district. The 3,432-hectare property is accessible by paved and gravel roads and has access to the

local power grid.

Veta Colorada (including the Sierra Plata and El Verde mines) was a past producing mining operation owned by Grupo Mexico

that closed in 1991 due to low silver prices. Mineralization, which occurs in a major silver vein structure that ranges from 1 to

30 metres thick, was mined seven levels down to 300-metre depths below surface in places and was traced for seven

kilometres.

NI43-101 Technical Report

The Company filed a NI 43-101 technical report on the Parral project, State of Chihuahua, Mexico on March 14, 2020. As of

December 31, 2019, Parral had estimated indicated mineral resources of 613,000 tonnes, containing 4.0 million ounces of

silver grading 207 g/t, 6,800 ounces of gold grading 0.35 g/t, 17.5 million pounds of lead grading 0.63%, and 16.5 million

pounds of zinc grading 0.61%. Inferred mineral resources are estimated to total 4.04 million tonnes containing 35.0 million

ounces of silver grading 269 g/t, 62,800 ounces of gold grading 0.48 g/t, 65.0 million pounds of lead grading 0.35% and 64.3

million pounds of zinc grading 0.35%.

Latest Drill Results

The Parral drill results are summarized in the following tables:

Parral - Veta Colorada Sierra Plata Deep (view Veta Colorada (Sierra Plata) longitudinal section)

Hole Structure From To Core

Length

True

Width Au Ag Cu Pb Zn AgEq

(m) (m) (m) (m) (gpt) (gpt) (%) (%) (%) (gpt)

VCU-59 Veta Colorada 87.55 88.70 1.15 0.98 0.03 169 0.016 3.87 2.26 358

Including 88.40 88.70 0.30 0.25 0.09 359 0.025 11.25 6.70 911

VCU-60 Veta Colorada 129.25 134.70 5.45 3.24 0.03 194 0.009 0.13 0.19 207

Including 133.35 134.10 0.75 0.45 0.03 233 0.013 0.29 0.23 252

VCU-61 Veta Colorada 118.80 128.30 9.50 5.91 0.02 218 0.047 0.60 1.08 278

Including 124.65 125.30 0.65 0.40 0.01 494 0.167 1.67 2.53 647

VCU-62 Veta Colorada 84.00 86.75 2.75 2.31 0.01 314 0.044 0.67 0.29 348

Including 84.00 84.85 0.85 0.71 0.01 438 0.063 1.04 0.43 488

VCU-63 Veta Colorada 89.80 92.35 2.55 1.92 0.05 203 0.012 0.25 0 226

Including 91.10 91.70 0.60 0.45 0.04 232 0.012 0.27 0 258

VCU-64 Veta Colorada 68.30 69.85 1.55 1.49 0.01 183 0.016 0.35 0.47 212

Including 68.30 69.20 0.90 0.87 0.01 254 0.013 0.41 0.37 281

VCU-65 Veta Colorada 82.80 84.20 1.40 1.13 0.02 439 0.233 0.56 0.13 484

Including 82.80 83.65 0.85 0.69 0.02 683 0.375 0.83 0.10 749

VCU-67 Veta Colorada 144.00 149.70 5.70 3.27 0.02 392 0.035 0.63 2.06 488

Including 144.00 144.30 0.30 0.17 0.05 1,865 0.156 3.70 6.98 2,234

VCU-68 Veta Colorada 133.50 136.30 2.80 1.07 0.01 74 0.019 2.06 0.70 158

Including 135.45 136.30 0.85 0.33 0.02 164 0.024 0.81 1.50 243

Drill holes VCU-58 and VCU-66 returned no significant results

Parral - Veta Colorada El Verde (view Veta Colorada (El Verde) longitudinal section)

Hole Structure From To Core

Length

True

Width Au Ag Cu Pb Zn AgEq

(m) (m) (m) (m) (gpt) (gpt) (%) (%) (%) (gpt)

VCU-69 Veta Colorada 207.35 210.15 2.80 1.96 0.07 513 0.111 1.99 1.69 644

Including 209.60 210.15 0.55 0.39 0.21 1,160 0.231 2.71 4.63 1,439

VCU-71 Veta Colorada 144.80 149.05 4.25 4.23 0.14 331 0.074 2.76 2.16 502

Including 147.00 147.45 0.45 0.45 0.17 1,420 0.169 3.08 5.39 1,726

VCU-72 Veta Colorada 156.05 158.00 1.95 1.84 0.04 178 0.018 0.95 1.03 245

Including 157.60 158.00 0.40 0.38 0.11 182 0.043 1.93 3.05 356

VCU-73

Hw Veta Colorada 165.20 166.65 1.45 1.25 0.14 310 0.082 1.81 1.96 448

Including 165.20 165.75 0.55 0.47 0.23 354 0.172 4.33 4.63 672

Veta Colorada 172.05 176.10 4.05 3.49 0.09 395 0.139 2.76 2.66 585

Including 172.05 172.50 0.45 0.39 0.02 2,110 0.015 0.62 0.12 2135

VCU-74 Veta Colorada 267.45 269.60 2.15 1.17 0.02 289 0.124 2.99 2.65 479

Including 267.45 268.25 0.80 0.44 0.02 623 0.237 5.96 4.74 979

VCU-75 Hw Veta Colorada 270.30 272.50 2.20 1.18 0.06 191 0.058 0.84 1.63 283

Including 270.85 271.25 0.40 0.21 0.08 777 0.157 2.06 3.16 968

VCU-77

Hw Veta Colorada 234.00 236.90 2.90 2.29 0.01 129 0.013 1.21 0.44 179

Including 236.45 236.90 0.45 0.35 0.03 240 0.065 3.46 1.92 410

Veta Colorada 238.20 241.35 3.15 2.48 0.12 532 0.285 3.07 3.06 763

Including 241.00 241.35 0.35 0.28 0.10 1,070 0.142 3.25 1.40 1,230

Drill holes VCU-70 and VCU-76 returned no significant results

Parral - Veta Colorada San Joaquin (view Veta Colorada (San Joaquin) longitudinal section)

Hole Structure From To Core

Length

True

Width Au Ag Cu Pb Zn AgEq

(m) (m) (m) (m) (gpt) (gpt) (%) (%) (%) (gpt)

VCS-33 Veta Colorada 290.75 293.15 2.40 2.09 0.61 55 0.132 2.99 3.51 323

Including 292.60 293.15 0.55 0.48 0.49 75 0.072 5.78 4.66 444

Notes to Tables

1.  Silver equivalents are calculated using the formula:

[Au (gpt) X 80] + Ag (gpt) + [Cu (%) X 2204.6 X Cu Price / Ag Price X 31.1] + [Pb (%) X 2204.6 X Pb Price / Ag Price X

31.1] + [Zn (%) X 2204.6 X Zn Price / Ag Price X 31.1]

2.  Price assumptions used are: Cu $3.45, Pb $0.90, Zn $1.20 and Ag $23.00

3.  All widths are estimated true widths

4.  No capping has been applied but high-grade intervals have been highlighted

Qualified Person and QA/QC - Dale Mah, P.Geo., Vice President Corporate Development of Endeavour Silver, is the

Qualified Person who reviewed and approved the technical information contained in this news release. A quality control

sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of all assay

results. All samples are split at the local field office and shipped to ALS Labs, where they are dried, crushed, split and 250

gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption finish and silver by

aqua regia digestion with ICP finish, over-limits by fire assay and gravimetric finish.

About Endeavour Silver – Endeavour Silver is a mid-tier precious metals mining company that operates two high-grade,

underground, silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development

decision, pending financing and final permits and exploring its portfolio of exploration and development projects in Mexico,

Chile and the United States to facilitate its goal to become a premier senior silver producer. The Company’s philosophy of

corporate social integrity creates value for all stakeholders.

SOURCE Endeavour Silver Corp.

Contact Information

Trish Moran

Interim Head of Investor Relations

Tel: (416) 564-4290

Email: [email protected]

Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation

reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such

forward-looking statements and information herein include but are not limited to mineral resource estimations, preparation and

timing of a preliminary economic assessment, and statements regarding future prospects of the Company’s mines and

projects. The Company does not intend to and does not assume any obligation to update such forward-looking statements or

information, other than as required by applicable law. 

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause

the actual results, level of activity, production levels, performance or achievements to be materially different from those

expressed or implied by such statements. Such factors include but are not limited to the ultimate impact of the COVID 19

pandemic on operations and results, changes in production and costs guidance, national and local governments, legislation,

taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious

metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of

mineral exploration, development and mining; the speculative nature of mineral exploration and development and risks in

obtaining necessary licenses and permits,

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to:

the continued exploration and mining operations, no material adverse change in the market price of commodities, mining

operations will operate and the mining products will be completed in accordance with management’s expectations and achieve

their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has

attempted to identify important factors that could cause actual results to differ materially from those contained in forward-

looking statements or information, there may be other factors that cause results to be materially different from those

anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or

information will prove to be accurate as actual results and future events could differ materially from those anticipated in such

statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or

information.