Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EDR.TO ·

Endeavour Silver Produces 1,076,974 oz Silver and 11,724 oz Gold (1.9 Million oz Silver Equivalents) in the First Quarter, 2017 ______________________________________________________________________________

Production Results

NEWS RELEASE

Endeavour Silver Produces 1,076,974 oz Silver and 11,724 oz Gold

(1.9 Million oz Silver Equivalents) in the First Quarter, 2017

______________________________________________________________________________

Vancouver, Canada – April 11, 2017 - Endeavour Silver Corp. (TSX: EDR, NYSE: EXK) reports its

production results for the First Quarter, 2017 from the Company’s three silver-gold mines in Mexico: the

Guanaceví mine in Durango State and the Bolañitos and El Cubo mines in Guanajuato State . Silver

production in the First Quarter, 201 7 was 1,076, 974 ounces (oz) and gold production was 1 1,724 oz

resulting in silver equivalent production of 1.9 million oz using a 70:1 silver gold ratio.

Production was lower in Q1, 2017 compared to Q1, 2016 due to significant differences in the annual mine

plans. Last year, production was highest in Q1 and lowest in Q4 due to the decision at low metal prices in

January 2016 to cut spending on exploration and development at all three mines , which reduced mine

access to reserves and therefore reduced metal production. Operational issues at the Guanaceví mine also

had an impact on production in the second half of 2016.

Production in 2017 is expected to rise throughout the year. Over the past nine months, management has

implemented operational changes and made investments to improve the pumping, ventilation and

electrical systems at Guanaceví to remediate the operational challenges encountered in 2016. Exploration

and development programs resumed last July in order to steadily regain full mine access to the reserves.

Production Highlights for First Quarter, 2017 (Compared to First Quarter, 2016)

 Silver production decreased 29% to 1,076,974 oz

 Gold production decreased 27% to 11,724 oz

 Silver equivalent production was 1.9 million oz (at a 70:1 silver: gold ratio)

 Silver oz sold down 18% to 1,235,594 oz

 Gold oz sold down 26% to 11,290 oz

 Bullion inventory at quarter-end included 116,108 oz silver and 292 oz gold

 Concentrate inventory at quarter-end included 32,995 oz silver and 764 oz gold

Endeavour CEO Bradford Cooke commented, “From a production standpoint, we are still recovering

from the reduced mine development and operational challenges we faced in 2016. Our plan is to increase

production throughout the year as we improve ore grade controls at El Cubo, slowly return Guanaceví to

good health , optimize throughput at Bolañitos and regain access to reserves at each mine in order to

achieve our production guidance.

“We expect 2017 to be a transformative year for Endeavour as we move to develop two new mines. We

recently made a decision to develop the El Compas as our fourth mine and we look forward to giving the

green light soon to develop Terronera into our fifth mine. The emergence of our exciting new Terronera

discovery and the acquisition of the El Compas and Parral mine projects have positioned us for significant

growth over the next three years.”

At Guanaceví, slower mine development resulted in lower mine output than planned, while grade

variations and excess dilution of the ore resulted in lower than planned grades. In the second half of 2016,

the Company initiated improve ments to underground infrastructure including investments in expanded

pumping, ventilation and electrical systems to remediate access issues. The mine operations are expected

to slowly improve in 2017.

At Bolañitos, silver grades were significantly lower than plan due to grade variations in the LL-Asunción

vein. As mining increases from the new Plateros zone during the year, silver grades should improve.

At El Cubo, both silver and gold grades were below plan due to excess dilution of the ore . Management

recently made changes to both mining methods and grade control personnel to reduce the dilution and

provide higher grade material to the plant. Grades and production are expected to improve in Q2, 2017.

Production Tables for First Quarter, 2017

(1) gpt = grams per tonne

(1) Silver equivalent ounces calculated using 70 :1 ratio. The prior year’s silver equivalents have been re -stated using the 70:1

ratio for comparison purposes.

Release of First Quarter, 2017 Financial Results and Conference Call

The First Quarter, 2017 financial results will be released before market on Wednesday, May 3, 2017 and a

telephone conference call will be held the same day at 9:00am PDT (12:00pm EDT). To participate in the

conference call, please dial the numbers below. No pass-code is necessary.

Toll-free in Canada and the US: 1-800-319-4610

Local Vancouver: 604-638-5340

Outside of Canada and the US: +604-638-5340

About Endeavour Silver – Endeavour Silver is a mid -tier precious metals mining company that owns

three high grade, underground, silver-gold mines in Mexico. Since start-up in 2004, Endeavour has grown

its mining operations organically to produce 9.7 million ounces of silver and equivalen ts in 2016. We

find, build and operate quality silver mines in a sustainable way to create real value for all stakeholders.

Endeavour Silver’s shares trade on the TSX (EDR) and the NYSE (EXK).

Contact Information - For more information, please contact:

Meghan Brown, Director Investor Relations

Toll free: (877) 685-9775

Tel: (604) 640-4804

Fax: (604) 685-9744

Production Tonnes Tonnes Grade Grade Recovery Recovery Silver Gold

by mine Produced per day Ag gpt(1) Au gpt(1) Ag % Au % Oz Oz

Guanaceví 87,779 975 213 0.49 88.3% 86.2% 530,683 1,192

Bolañitos 94,351 1,048 66 2.40 84.3% 85.4% 168,723 6,218

El Cubo 121,272 1,347 111 1.31 87.2% 84.5% 377,568 4,314

Consolidated 303,402 3,371 127 1.41 87.3% 85.1% 1,076,974 11,724

Email: [email protected]

Website: www.edrsilver.com

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward -looking statements” within the meaning of the United States private securities litigation

reform act of 1995 and “forward -looking information” within the meanin g of applicable Canadian securities legislation. Such

forward-looking statements and information herein include but are not limited to statements regarding Endeavour’ s anticipated

performance in 2017 including changes in mining and operations and the timing and results of various activities . The Company

does not intend to, and does not assume any obligation to update such forward -looking statements or information, other than as

required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the

actual results, level of activity, performance or achievements of Endeavour and its operations to be materially different fro m

those expressed or implied by such statements. Such factors include, among others, changes in national and local governments,

legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to

precious metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and

hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development, risks in

obtaining necessary licenses and permits, and challenges to the Company’s title to properties; as well as those factors describe d

in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C.

and Canadian securities regulatory authorities.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the

continued operation of the Company’s mining operations, no material adverse change in th e market price of commodities,

mining operations will operate and the mining products will be completed in accordance with management’s expectations and

achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has

attempted to identify important factors that could cause actual results to differ materially from those contained in forward -

looking statements or information, there may be other factors that cause results to be materially different f rom those anticipated,

described, estimated, assessed or intended. There can be no assurance that any forward -looking statements or information will

prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or

information. Accordingly, readers should not place undue reliance on forward-looking statements or information.