Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EDR.TO ·

Endeavour Silver Intersects High-Grade Silver-Gold Mineralization at its Guanacevi and Bolañitos Operations

Drill Results

Endeavour Silver Intersects High-Grade Silver-Gold Mineralization at its

Guanacevi and Bolañitos Operations

VANCOUVER, British Columbia, Dec. 02, 2021 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (TSX: EDR, NYSE: EXK)

is pleased to report continued high-grade drill results from its 2021 exploration program at the Guanacevi Mine in Durango

State, Mexico and the Bolañitos Mine in Guanajuato State, Mexico. Exploration drilling is ongoing at both operations and will

continue in 2022.

Highlights from Recent Drill Results

Guanacevi

• 1.97 gpt Au and 1,254 gpt Ag for 1,412 gpt AgEq over a 3.22 m ETW, including 3.6 gpt Au and 2,690 gpt Ag for

2,978 gpt AgEq over 0.2 m (UCM-67), extending the El Curso orebody along strike

• 4.36 gpt Au and 1,450 gpt Ag for 1,798 gpt AgEq over a 3.18 m ETW , including 7.97 gpt Au and 4,568 gpt Ag for

5,206 gpt AgEq over 0.31 m (SCSU-11), extending the Santa Cruz South (SCS) orebody to depth

Bolañitos

• 8.08 gpt Au and 151 gpt Ag for 797 gpt AgEq over a 1.67 m ETW , including 89.6 gpt Au and 880 gpt Ag for 8,046

gpt AgEq over 0.08 m (BS-04), on a new discovery, the Tepetateras vein, located south of current workings

• 1.26 gpt gold and 241 gpt silver for 342 gpt AgEq over a 0.96 m ETW (BS-03), on the Lulu vein, south of current

workings

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; ETW: estimated true width; m: metre; HW: hanging wall.

Silver equivalents are calculated at a ratio of 80:1 silver:gold.

Dan Dickson, CEO, commented, “We continue to see exceptional drilling results within the El Curso and the Santa Cruz Sur

systems at our Guanacevi silver mine. We have been operating at Guanacevi for more than 15 years and these encouraging

results support our view that we can continue to extend the mine life.”

Mr. Dickson continued, “Endeavour was built on the drill bit and exploration will continue to be a cornerstone of our strategy as

we pursue our vision of being a premier senior silver producer.”

At Guanacevi, underground drilling continues to expand down plunge extensions of the El Curso and the Santa Cruz South

(SCS) orebodies (view Guanacevi longitudinal sections). From January through October, more than 14,000 metres in 38 holes

have been drilled at Guanacevi from underground.   

At Bolañitos, surface and underground drilling has intersected multiple mineralized structures near current workings (view

Bolanitos longitudinal sections ). Tepetateras is a new area south of Bolañitos situated 1.7 kilometres from Endeavour Silver’s

historic Golondrinas Mine. Since the beginning of the year, over 11,500 metres in 59 holes have been drilled at Bolañitos

identifying mineralization in structures near current workings.

Guanacevi - El Curso drill results are summarized in the following table:

Hole Structure From True Width Au Ag AgEq

(m) (m) (gpt) (gpt) (gpt)

UCM-65 Santa Cruz 219.50 2.45 1.77 736 878

Including 222.85 0.25 5.05 1,973 2,377

UCM-66 Santa Cruz 306.90 2.72 1.62 550 680

Including 311.30 0.29 3.64 1,376 1,667

UCM-67 Santa Cruz 295.15 3.22 1.97 1,254 1,412

Including 301.90 0.23 3.60 2,690 2,978

UCM-68 Santa Cruz 280.50 1.49 0.56 374 419

Including 282.95 0.42 1.18 887 981

UCM-69 Santa Cruz 295.15 2.00 0.84 338 405

Including 297.70 0.21 1.56 567 692

UCM-71 Santa Cruz 281.45 1.58 0.52 187 229

Including 282.10 0.25 1.83 550 697

UCM-74 Santa Cruz 363.85 1.11 0.53 156 198

Including 365.30 0.23 1.31 372 477

UCM-80 Santa Cruz 260.60 1.90 6.64 1,977 2,508

Including 261.90 0.42 15.35 5,320 6,548

UCM-84 Santa Cruz 260.30 0.92 0.57 309 354

Including 261.20 0.39 1.12 578 667

Note: Drill holes UCM-70, UCM-72, UCM-73, UCM-75, UCM-76, UCM-77, UCM-78, UCM-79, UCM-81, UCM-82 returned no

significant results

Guanacevi - SCS drill results are summarized in the following table:

Hole Structure From True Width Au Ag AgEq

(m) (m) (gpt) (gpt) (gpt)

SCSU-01 Santa Cruz 98.50 1.74 1.26 326 426

Including 99.30 0.27 3.44 650 926

SCSU-02 Santa Cruz 95.20 2.57 1.14 533 624

Including 95.20 0.64 1.69 1,290 1,425

SCSU-03 Santa Cruz 122.85 1.17 0.18 120 135

Including 123.50 0.71 0.19 148 164

SCSU-04 Santa Cruz 159.30 1.86 1.39 608 720

Including 159.80 0.34 2.30 1,037 1,221

SCSU-05 Santa Cruz 157.05 1.12 0.20 109 125

Including 157.85 0.46 0.38 130 161

SCSU-08 Santa Cruz 224.90 1.00 0.13 95 105

Including 225.80 0.33 0.15 111 123

SCSU-10 Santa Cruz 179.10 0.98 2.08 52 218

Including 179.85 0.24 4.15 63 395

SCSU-11 Santa Cruz 136.50 3.18 4.36 1,450 1,798

Including 138.60 0.31 7.97 4,568 5,206

SCSU-12 Santa Cruz 136.00 1.26 1.54 341 464

Including 136.00 0.48 3.11 672 921

SCSU-14 Santa Cruz 173.35 2.17 0.26 193 213

Including 173.35 0.67 0.35 218 245

Note: Drill holes SCSU-06, SCSU-07, SCSU-09, SCSU-13 returned no significant results

Bolañitos - South drill results are summarized in the following table:

Hole Structure From True Width Au Ag AgEq

(m) (m) (gpt) (gpt) (gpt)

BS-01 HW Cabrera Carrica 154.20 1.36 0.41 169 202

Including 155.30 0.48 0.24 213 233

BS-02 HW Cabrera Carrica 190.25 1.17 0.77 52 114

Including 190.25 0.31 1.86 165 314

BS-03 Lulú 74.30 0.96 1.26 241 342

Including 74.30 0.11 2.94 789 1025

BS-04 Tepetateras 137.70 1.67 8.08 151 797

Including 140.25 0.08 89.58 880 8046

BS-05 Lulú 20.80 0.93 0.28 104 126

Including 22.00 0.13 1.46 386 502

BS-09 Tepetateras 178.10 3.39 2.63 82 292

Including 186.50 0.10 16.65 95 1427

BS-10 Tepetateras 181.45 0.95 1.01 43 124

Including 182.70 0.29 2.34 116 303

BS-13 Tepetateras 238.65 1.09 1.73 5 143

Including 240.05 0.19 6.02 11 493

BS-15 Tepetateras 151.50 1.39 1.22 119 216

Including 153.40 0.29 3.52 238 520

BS-16 Cabrera Carrica 182.80 1.00 0.22 87 104

Including 182.80 0.77 0.25 102 122

BS-19

Tepetateras 99.60 1.39 1.43 217 331

Including 99.60 1.10 1.80 258 402

Lulú 107.50 1.03 0.14 327 338

Including 107.80 0.80 0.15 331 343

Note: Drill holes LS-01, LS-02, LS-03, LS-04, BS-06, BS-07, BS-08, BS-11, BS-12, BS-14, BS-17, BNU-01, BNU-02, BNU-03

returned no significant results

Bolañitos - Belén drill results are summarized in the following table:

Hole Structure From True Width Au Ag AgEq

(m) (m) (gpt) (gpt) (gpt)

BL1S-6

HW Belén 176.25 1.11 1.16 20 113

Including 176.55 0.33 2.12 28 198

Belén 236.15 1.62 1.39 33 144

Including 236.15 0.31 4.11 113 442

BL0.5S-1 HW Belén 97.00 1.06 2.49 73 272

Including 97.00 0.30 6.62 160 690

Note: Drill holes BL1.5-1, BL1.5-2, BL0.5-3, BL4.5S-1 returned no significant results

Silver equivalents are calculated at a ratio of 80:1 silver:gold. All widths are estimated true widths.

Qualified Person and QA/QC - Dale Mah, P.Geo., Vice President Corporate Development of Endeavour Silver, is the

Qualified Person who reviewed and approved the technical information contained in this news release. A quality control

sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of all assay

results. All samples are split at the local field office and shipped to SGS Labs, where they are dried, crushed, split and 250

gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption finish and silver by

aqua regia digestion with ICP finish, over-limits by fire assay and gravimetric finish.

About Endeavour Silver – Endeavour Silver is a mid-tier precious metals mining company that operates two high-grade,

underground, silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development

decision, pending financing and final permits and exploring its portfolio of exploration and development projects in Mexico,

Chile and the United States to facilitate its goal to become a premier senior silver producer.  Our philosophy of corporate

social integrity creates value for all stakeholders.

SOURCE Endeavour Silver Corp.

Contact Information

Galina Meleger, Vice President, Investor Relations

Toll free: (877) 685-9775

Tel: (604) 640-4804

Email: [email protected]

Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation

reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such

forward-looking statements and information herein include but are not limited to statements regarding future prospects of the

Company’s mines and projects. The Company does not intend to and does not assume any obligation to update such forward-

looking statements or information, other than as required by applicable law. 

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause

the actual results, level of activity, production levels, performance or achievements to be materially different from those

expressed or implied by such statements. Such factors include but are not limited to the ultimate impact of the COVID 19

pandemic on operations and results, changes in production and costs guidance, national and local governments, legislation,

taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious

metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of

mineral exploration, development and mining; the speculative nature of mineral exploration and development and risks in

obtaining necessary licenses and permits,

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to:

the continued exploration and mining operations, no material adverse change in the market price of commodities, mining

operations will operate and the mining products will be completed in accordance with management’s expectations and achieve

their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has

attempted to identify important factors that could cause actual results to differ materially from those contained in forward-

looking statements or information, there may be other factors that cause results to be materially different from those

anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or

information will prove to be accurate as actual results and future events could differ materially from those anticipated in such

statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or

information.