Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EDR.TO ·

Endeavour Silver Drilling Intersects New High-Grade Gold-Silver Mineralization in Melladito Vein at Bolanitos Mine, Guanajuato, Mexico

Drill Results

Endeavour Silver Drilling Intersects New High-Grade Gold-Silver Mineralization

in Melladito Vein at Bolanitos Mine, Guanajuato, Mexico

VANCOUVER, British Columbia , May 20, 2020 -- Endeavour Silver Corp. (NYSE: EXK) (TSX: EDR) announces that

exploration drilling in Q1, 2020 intersected new high-grade gold-silver mineralization in the Melladito vein at the Bolanitos mine

in Guanajuato, Mexico.  A total of 14 holes were drilled and 8 holes intersected high grades over minable widths (view

longitudinal section here).

Drilling highlights of 8 core holes include the following intersections:

• 24.3 grams per tonne (gpt) gold and 787 gpt silver over a 1.5 meter (m) true width in hole BN27 (3,217 gpt or 93.8 oz

per ton (opT) silver equivalents (AgEq) at a 100:1 silver:gold ratio)

• 12.5 gpt gold and 50 gpt silver over a 1.1 m true width (1,300 gpt or 37.9 opT AgEq)

• 7.37 gpt gold and 170 gpt silver over a 2.7 m true width (907 gpt or 26.4 opT AgEq)

The eight drill holes outline a new mineralized zone 100 m long by 200 m deep, open in all directions.  It could connect with

the historic high-grade San Ramon mine workings immediately west of and the San Pablo mine workings immediately east of

the drill holes.  This part of the Melladito vein was not previously explored and represents an exciting new area for resource

estimation and mine development.

Bradford Cooke, Endeavour Director and CEO, commented, “Last year at Bolanitos, we were successful in outlining new

resources in the San Miguel vein, now under development, and we expect to commence mining at San Miguel in Q3, 2020.

 This year, we are discovering new resources in the Melladito vein, which should allow us to develop and mine there next year,

as the orebody is only 300 m from the La Luz Ramp and 300 m from the San Miguel ramp.”

“Exploration activities were halted on April 1, 2020 due to the government mandated suspension of non-essential activities

during the COVID-19 pandemic.  Now that the government has decreed that the mining industry can go back to work, subject

to certain conditions, the exploration team will resume drilling at Bolanitos and other projects on or after June 1, 2020.”

Drilling results are summarized in the following table:

Hole Structure From True

width Au Ag AgEq

(m) (m) (gpt) (gpt) (gpt)

BN-27 Melladito 113.65 1.5 24.34 787 3,221

Including 113.65 0.2 91.8 2,200 11,380

BN-31 Bolanitos-San Miguel 132.9 1.1 12.48 50 1,298

Including 134.3 0.2 50.8 191 5,271

BN-32 Melladito 67.5 2.7 7.37 170 907

Including 69.85 0.6 9.47 327 1,274

BN-33 Melladito 93.3 1.8 3.87 140 527

Including 94.5 1 6.8 249 929

BN-34

Melladito 187.65 4.5 1.29 108 237

Including 194.5 0.5 0.67 627 694

Fw Melladito 213.35 1.6 9.85 16 1,001

Including 215.45 0.4 27.4 37 2,777

BN-35 Melladito 216.3 1.1 0.73 306 379

Including 217 0.4 0.77 470 547

BN-36 Melladito 243.1 4.3 2.06 18 224

Including 247.35 0.4 4.62 5 467

BN-39

Melladito 251.6 0.8 1.86 828 1,014

Including 252 0.5 2.91 1,395 1,686

Fw Melladito 268.5 4.9 2.39 13 252

Including 272.25 0.9 3.5 16 366

Silver equivalents are calculated at a ratio of 100:1 silver: gold. All widths are estimated true widths.

Qualified Person and QA/ QC

Godfrey Walton, M.Sc ., P.Geo ., Endeavour President and COO, is the Qualified Person who reviewed and approved this

news release and supervised the drilling programs in Mexico. A Quality Control sampling program of reference standards,

blanks and duplicates is used to monitor the integrity of all assay results. All samples are split at the local field office and

shipped to ALS-Chemex Labs, where they are dried, crushed, split and 50 gram pulp samples are prepared for analysis. Gold

is determined by fire assay with an atomic absorption (AA) finish and silver by aqua regia digestion and ICP finish, over-limits

by fire assay and gravimetric finish.

About Endeavour Silver – Endeavour Silver Corp. is a mid-tier precious metals mining company that owns and operates

three high-grade, underground, silver-gold mines in Mexico. Endeavour is currently advancing the Terronera Mine project

towards a development decision and exploring its portfolio of exploration and development projects in Mexico and Chile to

facilitate its goal to become a premier senior silver producer.  Our philosophy of corporate social integrity creates value for all

stakeholders.

SOURCE Endeavour Silver Corp. 

Contact Information:

Galina Meleger, Director, Investor Relations

Toll free: (877) 685-9775

Tel: (604) 640-4804

Email: [email protected]

Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation

reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such

forward-looking statements and information herein include but are not limited to statements regarding Endeavour’s anticipated

performance in 2020 including changes in mining operations and production levels, the timing and results of various activities

and the impact of the COVID 19 pandemic on operations. The Company does not intend to and does not assume any

obligation to update such forward-looking statements or information, other than as required by applicable law. 

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause

the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be

materially different from those expressed or implied by such statements. Such factors include but are not limited to the

ultimate impact of the COVID 19 pandemic on operations and results, changes in production and costs guidance, national and

local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico;

financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining

activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and

development, risks in obtaining necessary licenses and permits, and challenges to the Company’s title to properties; as well

as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information

Form filed with the S.E.C. and Canadian securities regulatory authorities.  

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to:

the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities,

mining operations will operate and the mining products will be completed in accordance with management’s expectations and

achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company

has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-

looking statements or information, there may be other factors that cause results to be materially different from those

anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or

information will prove to be accurate as actual results and future events could differ materially from those anticipated in such

statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or

information.