Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EDR.TO ·

Endeavour Silver Continues to Intersect High-Grade Mineralization at the Guanacevi Mine including 3.43 g/t Gold and 1,265 g/t Silver for 1,540 g/t Silver Equivalents over 2.2 metres

Drill Results

Endeavour Silver Continues to Intersect High-Grade Mineralization at the

Guanacevi Mine including 3.43 g/t Gold and 1,265 g/t Silver for 1,540 g/t Silver

Equivalents over 2.2 metres

VANCOUVER, British Columbia, Oct. 18, 2023 --  Endeavour Silver Corp. (TSX: EDR, NYSE: EXK) (“Endeavour” or the

“Company”) is pleased to report positive drill results from its ongoing drill program at the Guanacevi Mine in Durango state,

Mexico. Drilling continues along the prolific Santa Cruz vein in two areas (view Santa Cruz vein longitudinal section ), with the

objective to convert, expand, and discover new resources.

The 2023 drill program has continued to focus on the El Curso - Alondra properties, establishing lateral and vertical extensions

of the mineralized zone towards Porvenir Cuatro and continued testing the deep northwest extension of the Porvenir Dos

orebody. The exploration and exploitation rights to the El Curso and Alondra properties were obtained in 2019 and 2021,

respectively from Ocampo Mining S.A. de CV. and have become an integral contributor to the operation.

“These encouraging drill results expand our knowledge as we continue to push the boundaries of the mineralized horizons

along the Santa Cruz vein. Given the widths and grades of the intersections near existing development, this work is expected

continue Guanacevi’s history of growth and reserve replacement,” stated Dan Dickson, Chief Executive Officer. “We’ve been

mining in this area for nearly 20 years, and the prolific Santa Cruz region remains prospective and is expected to contribute to

our strong production profile for years to come.”

Highlights from Recent El Curso Drill Results

• 1.09 gpt Au and 384 gpt Ag for 471 gpt AgEq over a 5.6 m ETW, including 4.33 gpt Au and 1,730 gpt Ag for 2,076

gpt AgEq (UCM-117)

• 3.43 gpt Au and 1,265 gpt Ag for 1,540 AgEq over a 2.2 m ETW, including 6.99 gpt Au and 3,480 gpt Ag for 4,039

AgEq (UCM-120)

• 1.40 gpt Au and 265 gpt Ag for 378 gpt AgEq over a 3.2 m ETW (UCM-123)

• 2.77 gpt Au and 859 gpt Ag for 1,080 gpt AgEq over a 3.4 m ETW, including 8.22 gpt Au and 2,610 Ag for 3,268 gpt

AgEq (UCM-125)

Highlights from Recent Porvenir Dos Drill Results

• 1.08 gpt Au and 657 gpt Ag for 743 gpt AgEq over a 3.5 m ETW, including 3.24 gpt Au and 4,090 Ag for 4,349 gpt

AgEq (APD-13)

• 1.15 gpt Au and 414 gpt Ag for 506 gpt AgEq over a 2.8 m ETW, including 3.45 gpt Au and 1,170 Ag for 1,446 gpt

AgEq (APD-23)

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; ETW: estimated true width; m: metre; HW: hanging wall.

Silver equivalents are calculated at a ratio of 80:1 silver:gold.

Drilling Context

Within the El Curso concessions, 18 new holes have been completed totaling 3,162 metres. The program targeted two areas.

Underground drilling along strike in the Porvenir Cuatro area targeted the southeast edge of and outside mineral resources.

Underground drilling to the north end of El Curso (UCM124-127) located proximal to existing development, returned very high

intercepts. Most of the holes had grades and widths that are above the resource cut off assumptions and are expected to

convert to reserves.

Near Porvenir Dos, on the Alondra concessions, 19 new holes have been completed totalling 5,854 metres. While not currently

included in the Company’s Mineral Resources, Porvenir Dos is a former underground mine that we closed in 2013. Drilling has

returned high grade intercepts and represents another opportunity to grow our resource base. The deposit is extending down

dip on the northwest edge of the mineralized horizon. Endeavour plans to continue drilling towards the northwest to test

continuity with the objective to access ore from development advancing between the El Curso and Porvenir Dos areas that

would eventually be connected.

Latest Drill Results

The Guanacevi drill results are summarized in the following tables:

Guanacevi – Santa Cruz Vein - El Curso

Hole Structure From To True Width Au Ag AgEq

(m) (m) (m) (gpt) (gpt) (gpt)

UCM-114 Santa Cruz 137.50 140.60 1.57 0.68 196 250

UCM-115 Santa Cruz 153.85 156.00 0.98 0.33 77 103

UCM-116 Santa Cruz 167.50 170.40 1.27 0.41 160 192

UCM-117 Santa Cruz 150.45 161.90 5.64 1.09 384 471

Including 151.45 152.20 0.37 4.33 1,730 2,076

UCM-118 Santa Cruz 124.10 126.70 1.08 1.30 479 582

UCM-119 Santa Cruz 274.70 281.70 1.69 3.22 660 917

including 276.00 276.85 0.21 14.55 2,780 3,944

UCM-120 Santa Cruz 183.55 190.85 2.20 3.43 1,265 1,540

Including 187.70 188.40 0.21 6.99 3,480 4,039

UCM-121 Santa Cruz 162.60 167.10 2.11 0.26 195 216

UCM-122 Santa Cruz 168.05 171.15 1.46 0.33 248 274

UCM-123 Santa Cruz 181.50 189.85 3.20 1.40 265 378

UCM-124 Santa Cruz 69.10 70.95 1.39 1.74 704 844

Including 69.10 69.95 0.64 2.79 1,140 1,363

UCM-125 Santa Cruz 82.30 87.10 3.42 2.77 859 1,080

Including 86.20 87.10 0.64 8.22 2,610 3,268

UCM-126 Santa Cruz 72.15 78.00 3.52 1.65 657 789

Including 77.10 78.00 0.54 4.02 1,680 2,002

UCM-127 Santa Cruz 112.45 118.40 2.28 0.86 415 484

Drill holes UCM-112 , UCM-113, UCM-128 and UCM-129 returned no significant results

Guanacevi – Santa Cruz Vein - Porvenir Dos

Hole Structure From To True Width Au Ag AgEq

(m) (m) (m) (gpt) (gpt) (gpt)

APD-09 Santa Cruz 379.20 382.80 1.20 0.27 109 130

APD-11 Santa Cruz 273.55 277.75 2.13 0.72 274 331

APD-12 Santa Cruz 226.80 229.10 1.25 0.81 208 272

APD-13 Santa Cruz 242.55 249.50 3.47 1.08 657 743

Including 243.40 243.80 0.20 3.24 4,090 4,349

APD-20 Santa Cruz 282.30 286.75 1.81 0.66 473 526

APD-23 Santa Cruz 172.55 177.20 2.77 1.15 414 506

Including 173.20 173.95 0.45 3.45 1,170 1,446

APD-24 Santa Cruz 213.60 216.60 1.55 1,681 672 806

Including 215.55 216.05 0.26 1.89 1,630 1,781

APD-25 Santa Cruz 254.80 257.05 1.00 0.58 288 335

APD-27 Santa Cruz 288.25 291.00 1.18 0.41 199 232

Drill holes APD-10, APD-14, APD-15, APD-16, APD-17, APD-18, APD-19, APD-21, APD-22, and APD-26 returned no

significant results

Notes to Tables

1. Silver equivalents are calculated at a ratio of 80:1 silver:gold.

2. All widths are estimated true widths.

3. No capping has been applied but high-grade intervals have been highlighted.

Qualified Person and Quality Assurance/Quality Control - Dale Mah, P.Geo., Vice President, Corporate Development of

Endeavour, is the Qualified Person who reviewed and approved the technical information contained in this news release. A

quality control sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of

all assay results. All samples are split at the local field office and shipped to ALS Labs, where they are dried, crushed, split

and 250-gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption finish and

silver by aqua regia digestion with ICP finish, over-limits by fire assay and gravimetric finish.

About Endeavour Silver – Endeavour is a mid-tier precious metals mining company that operates two high-grade

underground silver-gold mines in Mexico. Endeavour is advancing construction of the Terronera Project and exploring its

portfolio of exploration projects in Mexico, Chile and the United States to achieve its goal of becoming a premier senior silver

producer.  Our philosophy of corporate social integrity creates value for all stakeholders.

Contact Information:

Galina Meleger, VP, Investor Relations

Email: [email protected]

Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn.

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation

reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such

forward-looking statements and information herein include but are not limited to statements regarding Endeavour’s anticipated

performance in 2023, estimates of mineral assay results, contributions to resource growth and future production, changes in

mining operations and forecasts of production levels, anticipated production costs and all-in sustaining costs and the timing

and results of various activities. The Company does not intend to and does not assume any obligation to update such forward-

looking statements or information, other than as required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause

the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be

materially different from those expressed or implied by such statements. Such factors include but are not limited to the

reliability of mineral assay estimates, changes in production and costs guidance; the ongoing effects of inflation and supply

chain issues on mine economics; national and local governments, legislation, taxation, controls, regulations and political or

economic developments in Canada and Mexico; financial risks due to precious metals prices; operating or technical

difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development

and mining; the speculative nature of mineral exploration and development; risks in obtaining necessary licenses and permits;

and challenges to the Company’s title to properties; as well as those factors described in the section “risk factors” contained

in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory

authorities.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to:

the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities,

forecasted mine economics as of 2023, mining operations will operate and the mining products will be completed in

accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and

factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to

differ materially from those contained in forward-looking statements or information, there may be other factors that cause

results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no

assurance that any forward-looking statements or information will prove to be accurate as actual results and future events

could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue

reliance on forward-looking statements or information.