Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EDR.TO ·

Endeavour Silver Continues to Intersect High-Grade Mineralization at the Guanacevi Mine including 3.54 g/t Gold and 1,129 g/t Silver for 1,412 g/t Silver Equivalents over 7.28 meters

Drill Results

Endeavour Silver Continues to Intersect High-Grade Mineralization at the

Guanacevi Mine including 3.54 g/t Gold and 1,129 g/t Silver for 1,412 g/t Silver

Equivalents over 7.28 meters

VANCOUVER, British Columbia, Sept. 26, 2022 -- Endeavour Silver Corp. (TSX: EDR, NYSE: EXK) (“Endeavour” or the

“Company”) is pleased to report positive drill results from its ongoing drill program at the Guanacevi Mine in Durango state,

Mexico. Drilling continues along the prolific Santa Cruz vein in two areas (view Santa Cruz Vein longitudinal section ), with the

objective to convert, expand, and discover new resources.

The 2022 drill program has continued to focus on the El Curso property, establishing lateral and vertical extents of the

mineralized zone between the Porvenir Cuatro and Milache mines. The exploration and exploitation rights to the El Curso

property were obtained in 2019 from Ocampo Mining S.A. de CV., and have become an integral contributor to the operation.

Recently, under the same agreement terms, the Company has tested the northwest extension of the Porvenir Dos orebody

with encouraging results from initial drilling.

Highlights from Recent El Curso Drill Results

• 3.50 gpt Au and 1,150 gpt Ag for 1,430 gpt AgEq over a 1.16 m ETW , including 12.80 gpt Au and 4,240 gpt Ag for

5,264 gpt AgEq over 0.24 m (UCM-102)

• 3.54 gpt Au and 1,129 gpt Ag for 1,412 gpt AgEq over a 7.28 m ETW , including 25.40 gpt Au and 7,080 gpt Ag for

9,112 gpt AgEq over 0.43 m (UCM-106)

Highlights from Recent Porvenir Dos Drill Results

• 1.43 gpt Au and 967 gpt Ag for 1,081 gpt AgEq over a 2.43 m ETW , including 3.64 gpt Au and 5,120 gpt Ag for

5,411 gpt AgEq over 0.23 m (APD-03)

• 1.60 gpt Au and 1,460 gpt Ag for 1,589 gpt AgEq over a 1.17 m ETW , including 2.91 gpt Au and 3,340 gpt Ag for

3,573 gpt AgEq over 0.25 m (APD-04)

Abbreviations include: gpt: grams per tonne; Au: gold; Ag: silver; ETW: estimated true width; m: metre; HW: hanging wall.

Silver equivalents are calculated at a ratio of 80:1 silver:gold.

“We are encouraged by the drill results at Guanacevi, as we continue to delineate high grades in areas which are proximal to

the mill and historic working areas. The results announced today demonstrate both growth and steady improvement of the

deposit and mine plan,” stated Dan Dickson, Chief Executive Officer. “Our focus remains on delineating mineralized

extensions to mining horizons and resource growth.”

Latest Drill Results

The Guanacevi drill results are summarized in the following tables:

Guanacevi – Santa Cruz Vein - El Curso

Hole Structure From To True Width Au Ag AgEq

(m) (m) (m) (gpt) (gpt) (gpt)

UCM-101 Santa Cruz 219.90 221.90 1.10 0.36 101 130

Including 220.55 221.15 0.33 0.29 137 160

UCM-102 Santa Cruz 202.80 205.45 1.16 3.50 1,150 1,430

Including 203.55 204.10 0.24 12.80 4,240 5,264

UCM-103 Santa Cruz 195.00 210.25 6.08 0.97 234 311

Including 208.90 209.35 0.18 5.77 699 1,161

UCM-104 HW Santa Cruz 217.85 221.35 1.25 0.64 310 361

Including 218.55 219.30 0.27 1.12 490 579

UCM-105 Santa Cruz 204.00 210.00 1.80 1.08 508 595

Including 208.45 209.05 0.18 3.06 1,600 1,845

UCM-106 Santa Cruz 202.60 216.15 7.28 3.54 1,129 1,412

Including 208.15 208.95 0.43 25.40 7,080 9,112

UCM-107 Santa Cruz 229.70 232.20 1.32 0.70 123 179

Including 231.50 232.20 0.37 0.62 164 213

UCM-109 Santa Cruz 267.50 269.80 1.01 1.20 521 617

Including 269.30 269.80 0.22 0.93 707 782

UCM-110 Santa Cruz 248.05 253.00 2.47 1.25 321 421

Including 248.95 249.90 0.48 2.43 565 759

Drill holes UCM-108 and UCM-111 returned no significant results

Guanacevi – Santa Cruz Vein - Porvenir Dos

Hole Structure From To True Width Au Ag AgEq

(m) (m) (m) (gpt) (gpt) (gpt)

APD-03 Santa Cruz 286.85 292.60 2.43 1.43 967 1,081

Including 287.85 288.40 0.23 3.64 5,120 5,411

APD-04 Santa Cruz 246.50 248.80 1.17 1.60 1,460 1,589

Including 246.80 247.30 0.25 2.91 3,340 3,573

APD-05 Santa Cruz 190.70 195.05 2.80 1.38 489 599

Including 193.20 193.75 0.35 2.59 943 1,150

APD-06 Santa Cruz 156.05 157.65 1.29 0.34 214 241

Including 157.15 157.65 0.40 0.45 339 375

Drill holes APD-01, APD-02, APD-07 and APD-08 returned no significant results

Notes to Tables

1. Silver equivalents are calculated at a ratio of 80:1 silver:gold.

2. All widths are estimated true widths.

3. No capping has been applied but high-grade intervals have been highlighted.

Qualified Person and Quality Assurance/Quality Control - Dale Mah, P.Geo., Vice President, Corporate Development of

Endeavour, is the Qualified Person who reviewed and approved the technical information contained in this news release. A

quality control sampling program of reference standards, blanks and duplicates has been instituted to monitor the integrity of

all assay results. All samples are split at the local field office and shipped to ALS Labs, where they are dried, crushed, split

and 250-gram pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption finish and

silver by aqua regia digestion with ICP finish, over-limits by fire assay and gravimetric finish.

About Endeavour Silver – Endeavour is a mid-tier precious metals mining company that operates two high-grade

underground silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development

decision, pending financing and final permits and exploring its portfolio of exploration and development projects in Mexico,

Chile and the United States to facilitate its goal of becoming a premier senior silver producer. Our philosophy of corporate

social integrity creates value for all stakeholders.

Contact Information

Galina Meleger, VP, Investor Relations

Email: [email protected]

Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation

reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation (together,

"forward-looking statements"). Such forward-looking statements and information herein include but are not limited to

statements regarding future prospects of the Company’s mines and projects. The Company does not intend to and does not

assume any obligation to update such forward-looking statements or information, other than as required by applicable law. 

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause

the actual results, level of activity, production levels, performance or achievements to be materially different from those

expressed or implied by such forward-looking statements. Such factors include but are not limited to the ultimate impact of

the COVID 19 pandemic on operations and results, changes in production and costs guidance, national and local

governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico;

financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining

activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and

development and risks in obtaining necessary licenses and permits, and challenges to the Company’s title to properties; as

well as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual

Information Form filed with the Securities and Exchange Commission . and available at www.sec.gov, and Canadian securities

regulatory authorities available at www.sedar.com.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to:

the continued exploration and mining operations, no material adverse change in the market price of commodities, mining

operations will operate and the mining products will be completed in accordance with management’s expectations and achieve

their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has

attempted to identify important factors that could cause actual results to differ materially from those contained in forward-

looking statements or information, there may be other factors that cause results to be materially different from those

anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or

information will prove to be accurate as actual results and future events could differ materially from those anticipated in such

statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.