Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

ECU.V ·

Element 29 Engages Synectiq to Advance Resource Modelling and Metallurgical Test Work at its Elida Porphyry Cu-Mo-Ag Deposit, Peru

Element 29 Engages Synectiq to Advance

Resource Modelling and Metallurgical Test

Work at its Elida Porphyry Cu-Mo-Ag Deposit,

Peru

Vancouver, British Columbia--(Newsfile Corp. - May 7, 2026) - Element 29 Resources Inc.

(TSXV:

ECU) (OTCQB: EMTRF) (BVL: ECU)

("

Element 29

" or the "

Company

") is pleased to announce that

it has engaged Synectiq Inc. ("

Synectiq

") to support mineral resource modelling and to design and

manage a metallurgical test work program for the Elida Porphyry Copper ("

Cu

") - Molybdenum ("

Mo

") -

Silver ("

Ag

") Deposit ("

Elida

" or the "

Property

") in central Perú.

Richard Osmond, President and CEO of Element 29 Resources, states,

"Phase 3 drilling at Elida has

extended copper mineralization beyond the limits of the current pit shell, providing a strong basis for

an updated Mineral Resource Estimate. Synectiq's engagement will support integration of this data

into an updated resource model and advance metallurgical understanding across the principal ore

types. This work will provide key inputs for technical evaluation and future studies, advancing Elida

toward the next stages of development."

The resource modelling program is intended to refine the Company's geological model and support the

preparation of an updated Mineral Resource Estimate

1

("

MRE

"), building on the pit-constrained

resource estimate completed in late 2022. The scope of work is expected to incorporate data from

drilling programs completed subsequent to the initial MRE, including results from the Company's

ongoing Phase 3 drilling program. The Company is targeting potential completion of an updated MRE by

year-end, subject to the receipt, validation and interpretation of all relevant data.

Synectiq's initial scope of work will focus on the design and management of a metallurgical test work

program for the deposit. The initial program is expected to include representative sample selection,

comminution testing, mineralogical characterization, and flotation investigations, all focusing toward a

MRE underpinned by a reasonable expectation of extraction. This work is intended to generate

preliminary metallurgical data, including indicative recovery parameters, to support ongoing technical

evaluation of the deposit and to potential inform assumptions for future technical studies.

All work will be conducted under the supervision of qualified professionals with relevant expertise in

mineral resource estimation, metallurgy and mineral processing. Activities will follow industry best

practices and applicable quality assurance and quality control ("

QA/QC

") protocols.

Qualified Person

The scientific and technical content of this news release has been reviewed and approved by Richard

Osmond (P.Geo.), Element 29's President and CEO, who is the "Qualified Person" as defined by

National Instrument 43-101 Standards for Disclosure for Mineral Projects.

About Synectiq

Synectiq Inc. is an independent consulting firm providing project management and multidisciplinary

engineering services to the mining industry. Its expertise spans the full project lifecycle, including early-

stage evaluations, technical due diligence, advanced technical studies, and support for detailed

engineering and project execution.

About Element 29 Resources Inc.

Element 29 is an emerging junior resource company with a highly experienced management team and

board focused on exploring and potentially developing copper deposits in Perú, one of the lowest-cost,

lowest-risk mining jurisdictions globally.

The Company's principal objective is to explore and potentially develop its Elida Porphyry Cu-Mo-Ag

Deposit in west-central Perú which has an initial pit-constrained inferred MRE

1

of 321.7 million tonnes

grading 0.32% Cu, 0.03% Mo and 2.61 g/t Ag at a 0.2% Cu cutoff grade and a low 0.74:1 modeled strip

ratio.

Alongside Elida, the Company has three (3) early stage, highly prospective porphyry Cu projects in Perú

for more than 25,000 ha of titled concession. These include the Flor de Cobre porphyry Cu-Mo prospect

situated in the Southern Perú Copper Belt, just 26 km from the Cerro Verde copper mine

2

(Freeport-

Buenaventura) as well as the Paka and Pahuay porphyry Cu skarn prospects related to potential tertiary-

aged, mineralized porphyry complexes intruding along the eastern margin of the Peruvian Coastal

Batholith.

All projects are well located for future mine development and will benefit from nearby infrastructure

including roads, powerlines, ports, water, and a skilled workforce.

More information is available at

www.e29copper.com

.

For more information:

Richard Osmond

President, CEO and Director

1-888-246-7881

[email protected]

Neither the TSX Venture Exchange (the "

TSX-V

") nor its Regulation Service Provider (as that term is

defined in the policies of the TSX-V)

accepts responsibility for the adequacy or accuracy of this press

release.

Notes:

1

.

The Mineral Resource Estimate information is available in "NI 43-101 Technical Report, Mineral Resource Estimation of the Elida

Porphyry Copper Project in Perú" dated September 20, 2022, and prepared in accordance with Form 43-101F1 by Marc Jutras, P.Eng.,

M.A.Sc., Ginto Consulting Inc.

2

.

This news release contains information about adjacent properties on which Element 29 has no right to explore or mine. Readers are

cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on the Company's properties.

Cautionary Note Regarding Forward-Looking Statements

This press release contains certain forward-looking information and forward-looking statements within

the meaning of applicable Canadian securities legislation (collectively, "

Forward-looking

Statements

"). Any statements that are contained in this press release that are not statements of

historical fact may be deemed to be Forward-looking Statements. Forward-looking Statements are

frequently, but not always, identified by words such as "may", "will", "intends", "proposed", "believes",

"continues", "plans", "expects" or similar expressions (or the negative and grammatical variations of

any of these terms). Forward-looking Statements in this press release include, but are not limited to,

statements with respect to the Company's resource properties and future capital requirements; and

the Company's plans, focus and objectives.

Forward-looking Statements involve various risks and uncertainties and are based on certain factors

and assumptions. Although Element 29's management considers these beliefs and assumptions

reasonable based on currently available information, there can be no assurance that such statements

will prove to be accurate, and actual results and future events could differ materially from those

anticipated in such statements. Forward-looking Statements necessarily involve known and unknown

risks, and important factors, among others, that could cause actual results to differ materially from the

Company's expectations include: uncertainties related to the Company's ability to access investors

for the Financing; the timeliness and success of regulatory approvals; fluctuations in copper and other

commodity prices; uncertainties inherent in the exploration of mineral properties; risks associated with

general economic conditions; changes in legislation, income tax and regulatory matters; currency and

interest rate fluctuations; inability to access sufficient capital from internal and external sources; and

other risk factors set forth in the Company's prospectus under the heading "Risk Factors".

Readers are further cautioned not to place undue reliance on Forward-looking Statements as there

can be no assurances that the plans, intentions or expectations upon which they are placed will occur.

The Company undertakes no obligation to update or revise any Forward-looking Statements, whether

as a result of new information, future events or otherwise, except as may be required by law. New

factors emerge from time to time, and it is not possible for Element 29 to predict all of them or assess

the impact of each such factor or the extent to which any factor, or combination of factors, may cause

results to differ materially from those contained in any Forward-looking Statement. Any Forward-

looking Statements contained in this press release are expressly qualified in their entirety by this

cautionary statement.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/296408