Element 29 Announces Initial Mineral Resource Estimate for the Elida Porphyry Copper Deposit in Peru Inferred Mineral Resource of 321.7 million tonnes grading 0.32% copper, 0.03% molybdenum and 2.6 g/t silver with a low

Drill Results Resource Estimates

Element 29 Announces Initial Mineral

Resource Estimate for the Elida Porphyry

Copper Deposit in Peru

Inferred Mineral Resource of 321.7 million tonnes grading

0.32% copper, 0.03% molybdenum and 2.6 g/t silver with a low

0.74:1 strip ratio

Vancouver, British Columbia--(Newsfile Corp. - September 27, 2022) - Element 29 Resources Inc.

(

TSXV: ECU

) (

OTCQB: EMTRF

) ("

Element 29

" or the "

Company

") announces the completion of an

initial independent Inferred Mineral Resource estimate ("

Mineral Resource

") at its Elida porphyry

copper-molybdenum deposit ("

Elida

") in west-central Peru. This Mineral Resource was completed on

just one of five porphyry centres at Elida and provides a solid foundation for future engineering studies

as well enhancement and expansion through ongoing exploration.

Elida Mineral Resource Highlights

Pit-constrained, Inferred Mineral Resource Estimate of 321.7 million tonnes grading 0.32% copper

(for a total of 2.24 billion pounds of contained copper) plus 0.029% molybdenum and 2.6 g/t silver,

using a 0.20% copper cut-off grade and low modeled strip ratio of 0.74:1 (waste: mineralized

material).

A near surface, higher-grade subset of the Mineral Resource consisting of 34.1 million inferred

tonnes at 0.55% copper, 0.037% molybdenum, and 4.4 g/t silver (at a cut-off grade of 0.45%

copper) has potential to be mined with minimal stripping in the initial years of mining.

Significant molybdenum and silver grades have the potential to enhance the economics of the

deposit, subject to metallurgical test work.

Steve Stakiw, Element 29's President and CEO comments, "We are very pleased with this significant

initial Mineral Resource Estimate for our Elida porphyry copper deposit. It is an impressive

accomplishment over the past year and a half and is a testament to the dedication of our team. This

major milestone for Element 29 demonstrates Elida is a large copper mineralized system along with

significant molybdenum and silver that has the potential to enhance the economics of the deposit. Our

evaluation of the Elida deposit's potential is still at an early stage and we see strong resource growth

potential given this initial mineral resource estimate covers only a portion of our Zone 1 porphyry, one of

five porphyry centres we have identified on the project for testing."

Click

HERE

to watch a short video presentation by Steve Stakiw, CEO, and Paul Johnston, Vice-

President, Exploration, discussing the highlights of today's press release.

Table 1

. Pit-constrained Inferred Mineral Resources for the Elida deposit as at September 20, 2022.

Cu

Cut-Off

(%)

Tonnes

(millions)

Cu

(%)

Contained Cu

(M lb)

Contained Cu

(tonnes)

Mo

(%)

Contained

Mo

(M lb)

Contained

Mo (tonnes)

Ag

(g/t)

Contained

Ag

(M oz)

0.10

520.8

0.255

2,927.9

1,328,057

0.026

298.5

135,410

2.15

36.0

0.15

439.4

0.278

2,692.9

1,221,456

0.028

271.2

123,024

2.31

32.7

0.20

321.7

0.316

2,241.2

1,016,568

0.029

205.7

93,293

2.61

27.0

0.25

214.9

0.363

1,719.4

779,926

0.031

146.8

66,605

2.97

20.5

0.30

143.0

0.407

1,283.4

582,150

0.033

104.1

47,201

3.31

15.2

0.35

94.7

0.449

937.9

425,415

0.034

71.0

32,214

3.65

11.1

0.40

59.7

0.493

649.1

294,423

0.036

47.4

21,499

3.99

7.7

0.45

34.1

0.547

411.7

186,736

0.037

27.8

12,631

4.40

4.8

0.50

20.1

0.599

265.4

120,396

0.038

16.8

7,638

4.76

3.1

Notes:

1

.

The effective date for the Mineral Resource is September 20, 2022.

2

.

Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.

3

.

The CIM definitions were followed for the classification of Inferred Mineral Resources. The quantity

and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature and

there has been insufficient exploration to define these Inferred Mineral Resources as an indicated

Mineral Resource and it is uncertain if further exploration will result in upgrading them to an

Indicated or Measured Mineral Resource category.

4

.

Mineral Resources are reported at a cut-off grade of 0.2 g/t Cu, using a US$/CAN$ exchange rate

of 0.75 and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to

constrain the Mineral Resources with the following estimated parameters: copper price of

US$3.46/lb, US$2.00/t mining cost, US$5.00/t processing cost, US$1.40/t G+A, 87% copper

recovery, and 45° pit slope.

5

.

The estimate of Mineral Resources may be materially affected by geology, environment,

permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.

Exploration Potential

The initial mineral resource estimate utilized widely spaced drill holes that tested a portion of the

interpreted Zone 1 mineralization surrounding a low-grade porphyry core. More drilling will be required in

the southwest and northwest sectors to completely evaluate mineral resource potential of Zone 1 (Figure

1). The Company elected to complete a mineral resource estimate at this stage to quantify the size of the

drilled portion of Zone 1 and use the three-dimensional mineralization model for future drill hole planning

to potentially expand the size of Zone 1 and upgrade Mineral Resources from Inferred to Indicated.

Higher Grades Located Close to Surface

Most of the higher-grade subset of the Mineral Resource noted in Table 1 with a 0.45% copper cut-off is

centred on mineralization intersected in the upper parts of holes ELID012, ELID014, ELID019, and

ELID025 (Figure 3). These holes demonstrate that stronger copper mineralization occurs from the

bedrock surface where this tonnage has potential to be mined with minimal stripping in the initial years of

mining.

Mineral Resource Estimation Methodology

The Mineral Resource Estimate was prepared by Mr. Marc Jutras, P.Eng., M.A.Sc., Principal, Mineral

Resources at Ginto Consulting Inc. ("Ginto Consulting"). Mr. Jutras is an Independent Qualified Person

as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101) in

accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Standards on

Mineral Resources and Mineral Reserves, as adopted and amended by the CIM Council.

Mineral Resources at Elida were estimated by:

Developing a geologic interpretation of copper mineralization in collaboration with the Element 29

geology team based on geologic observations from surface exposure and drill core.

Performing a statistical evaluation of the Elida drill hole database, which contained 25 diamond

drill holes of HQ and NQ diameter.

Three-dimensional modeling two mineralized domains represented by a higher copper grade

domain and a lower copper grade domain.

Integration of an accurate digital terrain model into the mineralization model.

Compositing original samples to 2 metre ("

m

") lengths.

Exploratory data analysis to understand different geometric and statistical properties of copper,

molybdenum, and silver grades.

Applying capping of high-grade outliers based on the statistical properties of the grade

populations.

Variographic analysis to spatially establish the preferred directions of grade continuity.

Grade estimation of copper, molybdenum, and silver with ordinary kriging using a strategy and

parameters tailored to account for the various geometrical, geologic, and geostatistical

characteristics identified in previous steps.

Validation of grade estimates using a set of validation tests.

Applying a pit constraint optimized using the Lerchs-Grossman algorithm.

The copper grade populations within the mineralized domains were found to be well-behaved with low

coefficients of variation (values of less than 0.6). The capping of the high-grade outliers has only had a

minor effect on the average grades and the metal content. For such, the usage of the ordinary kriging

technique with capped composited grades is believed to be an adequate strategy for the grade

interpolation process.

The validation of the copper grade estimates has shown good results from the various tests carried out.

It can be concluded that the copper grade estimates are not biased and have an adequate amount of

smoothing/variability. Therefore, it is believed that the copper grade estimates are an adequate

representation of the Mineral Resource at Elida, based on the current geologic understanding and

available data. There is good potential for additional mineral resources on the property with other

untested targets.

Future Work

The Mineral Resource announced herein was useful for indicating areas for further drilling as shown in

Figure 1. The objectives of future drilling are to resolve internal, near-surface higher grade zones and

expand the size of Zone 1, especially on the northwest and southwest edges and at depth.

Initial drill testing of the other zones will also be planned with the objective of further expanding mineral

resources within the Elida porphyry cluster (Figure 2).

The effective date of the Mineral Resource Estimate is September 20, 2022. A NI 43-101 technical

report prepared by Ginto Consulting will be filed on SEDAR within 45 days of this news release and will

be available at that time on the Company's website.

For readers to fully understand the information in this news release they should read the technical report

in its entirety when it is available, including all qualifications, assumptions, exclusions and risks. The

technical report is intended to be read as a whole and sections should not be read or relied upon out of

context.

Analytical Quality Control & Quality Assurance

Elida Resources S.A.C., a wholly owned subsidiary of Element 29 Resources Inc., supervises drilling

and carries out sampling of HQ and NQ core. Logging and sampling are completed at a secured

Company facility situated on the Flor de Cobre project site. Sample intervals are nominally 2 m long. Drill

core is cut in half using a rotary diamond blade saw and samples are sealed on site before

transportation to the ALS Peru S.A.C. sample preparation facility in Arequipa by Company vehicles and

staff. Prepared samples are sent to Lima by ALS Peru S.A.C. for analysis. ALS Peru S.A.C. is an

independent laboratory. Samples are analyzed for 35 elements using an Aqua Regia digestion and ICP-

AES analysis (ME-ICP41). Samples reporting over limits are analyzed by Aqua Regia digestion with

ICP-AES finish (ME-OG46). ALS meets all requirements of International Standards ISO/IEC

17025:2005 and ISO 9001:2015 for analytical procedures.

Element 29 employs an independent, internal quality assurance/quality control program that includes

insertion of duplicate, blank, and certified reference samples at the field site. The Company is not aware

of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of

the data reported.

Qualified Persons

The scientific and technical content of this news release has been reviewed and approved by Paul J.

Johnston (PhD, P.Geo), Vice President of Exploration for Element 29, and is a "Qualified Person" as

defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects.

The Mineral Resource estimate was prepared by Marc Jutras, P.Eng., M.A.Sc., of Ginto Consulting. Mr.

Jutras is independent of Element 29, as defined in National Instrument 43-101 Standards of Disclosure

for Mineral Projects.

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this press release.

About Elida

Elida is a porphyry copper-molybdenum exploration project within a property composed of 28 mining

concessions totaling 19,210 hectares that are 100% owned by Elida Resources S.A.C., a Peruvian

subsidiary of Element 29. The property contains a large, 2.5 x 2.4 kilometre ("

km

") phyllic alteration

system enclosing a cluster of porphyry centres that represent five distinct exploration targets. In 2021,

Element 29 completed seven diamond drill holes totalling 4,481 m that intersected multiple, long

intervals of Cu-Mo-Ag mineralization and traced mineralization to a depth greater than 900 m.

Mineralization remains open at depth. The remaining four large targets are untested. Under the current

drill permit, the Company can elect to drill-test all identified targets.

Elida is in west-central Peru, approximately 85 km inland from the Pacific coast at moderate elevations

between 1,500 m and 2,000 m, and close to transportation and power infrastructure, including a 45

mega-watt hydroelectric generation facility situated 15 km from the project.

About Element 29 Resources Inc.

Element 29 Resources Inc. is an emerging copper exploration and development company focused on

advancing its portfolio of Peruvian projects towards development in one of the world's premier mining

jurisdictions. Element 29's growth strategy is led by our strong board and management, who have a

proven track record of discovery and delivering significant value to our shareholders.

The Company's principal objective is to explore and develop its Elida porphyry copper deposit in west-

central Peru and its Flor de Cobre porphyry copper project located in the Southern Peru Copper Belt, 26

km southeast from Freeport-McMoRan's Cerro Verde copper mine. Both projects are well located for

potential mine development and will benefit from nearby infrastructure including roads, powerlines, ports,

water, and a skilled workforce.

More information is available at

www.e29copper.com

.

For more information:

Steve Stakiw, President & CEO

1-888-246-7881

[email protected]

Forward Looking Statements

This press release contains certain forward-looking information and forward-looking statements within

the meaning of applicable Canadian securities legislation (collectively, "

Forward-looking

Statements

"). All statements, other than statements of historical fact, constitute Forward-looking

Statements. Words such as "will", "intends", "proposed" and "expects" or similar expressions are

intended to identify Forward-looking Statements. Forward looking Statements in this press release

include statements related the Company's resource properties, and the Company's plans, focus and

objectives.

Forward-looking Statements involve various risks and uncertainties and are based on certain factors

and assumptions. There can be no assurance that such statements will prove to be accurate, and actual

results and future events could differ materially from those anticipated in such statements. Important

factors that could cause actual results to differ materially from the Company's expectations include

uncertainties related to fluctuations in copper and other commodity prices, uncertainties inherent in the

exploration of mineral properties, the impact and progression of the COVID-19 pandemic and other risk

factors set forth in the Company's prospectus under the heading "Risk Factors". The Company

undertakes no obligation to update or revise any Forward-looking Statements, whether as a result of new

information, future events or otherwise, except as may be required by law. New factors emerge from time

to time, and it is not possible for Element 29 to predict all of them or assess the impact of each such

factor or the extent to which any factor, or combination of factors, may cause results to differ materially

from those contained in any Forward-looking Statement. Any Forward-looking Statements contained in

this press release are expressly qualified in their entirety by this cautionary statement.

Figure 1.

Details of Elida Zone 1, showing areas identified for follow-up drilling, which will be designed

to better resolve copper and molybdenite grade distribution near surface and within the constraining pit

shell and more accurately define limits of mineralization particularly on the northwest and southwest

edges of Zone 1.

To view an enhanced version of Figure 1, please visit:

https://images.newsfilecorp.com/files/7414/138524_218b62aa9441e8d3_001full.jpg

Figure 2.

The Elida porphyry cluster showing five identified mineralized zones.

Drilling to date has

concentrated on Zone 1 and the other zones have not been drill-tested. The Company plans to test the

remaining zones with future drilling programs.

To view an enhanced version of Figure 2, please visit:

https://images.newsfilecorp.com/files/7414/138524_218b62aa9441e8d3_002full.jpg

Figure 3.

Section through 260050 E to illustrate the position of the constraining pit shell in relation to the

original topographic surface and the block model used for the Mineral Resource estimate. The shaded

area is the interpreted position of the low-grade quartz monzonite porphyry stock that occupies the core

of Zone. Please refer to Figure 1 for the section location.

To view an enhanced version of Figure 3, please visit:

https://images.newsfilecorp.com/files/7414/138524_218b62aa9441e8d3_003full.jpg

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/138524