Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ECR.V ·

Cartier Launches a 7,000m Drill Program on The Wilson Property

Exploration Programs

For immediate release

Cartier Launches a 7,000m Drill Program on The Wilson Property

Val-d’Or, March 23rd, 2017 – Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) is pleased to announce

that it has commenced a diamond drill program consisting of 18 drill holes totalling more than 7,000 m

on the Wilson property , located 15 km to the East of Lebel -sur-Quévillon, Québec which is situated

along the Urban-Barry Belt. The program is intended to explore the depth and lateral extensions of

Toussaint Gold Deposit (Figure).

The Toussaint Gold deposit lies at the heart of an area that has recently seen a significant staking

rush by several companies. The area remains historically under-explored relative to other gold belts in

the Abitibi region . On the property, i n 1994, Freewest Resources produced a historical resource

estimate for the Toussaint Gold deposit (GM 52557) of 187,706 tonnes at 7,1 g/t Au. Note: The

qualified person has not done sufficient work to classify the resources that are the subject of this

historical resources estimate. Cartier does not consider the resources presented in this historical

resource estimate to be current.

This program will specifically test the depth extensions of 4 Gold Zones (T1, T2, T3 and M1) which are

hosted within the Toussaint and Midrim Gold structures (Figure). The latter are known over a distance

of 1.5 kilometers along strike from successful historic drilling.

The follow ing table presents a selecti on of the best surface , channel and diamond drill hole

intersections (consider adding the depth ranges on the holes):

Drill Hole (VP)

And Channel (R)

Au

(g/t)

Length

(m)

Gold

Corridor

Gold

Structure

Gold

Zone

R1 21.3 5.0

WILSON

TOUSSAINT

T1

including 90.6 1.0

R8 15.3 4.0

including 47.3 1.0

R14 10.7 4.0

including 24.5 1.0

VP-11-11 33.2 3.0

including 164.5 0.6

VP-94-45 20.2 2.6

including 32.2 1.1

VP-92-10 10.5 4.8

including 34.3 0.8

VP-11-05 6.3 7.0

T3

including 32.3 1.0

VP-11-18 1.5 67.0

including 30.1 1.0

VP-93-22 2.0 41.4

including 11.7 5.2

VP-11-05 64.6 0.4 MIDRIM M1

VP-94-54 5.8 4.1

Lengths for drill core, expressed in this table, are measured along the core axis. True thickness has not been determined.

“This first robust drill program beneath the Toussaint deposit is intended to demonstrate the extension

at depth of the existing historical (non 43 -101) resources and lead future drilling to outline additional

gold-bearing zones.”, commented Philippe Cloutier, President and CEO.

This 18-hole program is expected to take until late May to complete including the return of all assays,

subject to local lab availability.

Quality Assurance / Quality Control

The scientific and/or technical information presented in this press release has been reviewed and

approved by Mr. Gaétan Lavallière, P. Geo., Ph. D. and Vice President for Cartier Resources. Mr.

Lavallière is a qualified person as defined by National Instrument 43-101.

-30-

For more information, please contact:

Philippe Cloutier, P.Geo.

President and CEO

Telephone: 819 856-0512

[email protected]

www.ressourcescartier.com

Investor Relations:

Relations Publiques Paradox

514 341-0408

Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of

this press release.