Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ECR.V ·

Cartier Cuts 44.7 g/t Au over 0.5 m and 7.5 g/t Au over 4.6 m Extending to 10 km the High-Grade Gold Potential at East Cadillac

Drill Results

For immediate release

Cartier Cuts 44.7 g/t Au over 0.5 m and 7.5 g/t Au over 4.6 m

Extending to 10 km the High-Grade Gold Potential at East Cadillac

Val-d’Or, Québec – December 17, 2024 – Cartier Resources Inc. ("Cartier" or the "Company") (TSXV:

ECR, FSE: 6CA) reports drill results in the western part of its 100% - owned East Cadillac property. The

latter is located 45 km east of the Val-d’Or mining camp (FIGURE).

Highlights:

➢ Extension of the high-grade gold potential over a strike length of 10 km (FIGURE)

✓ 44.7 g/t Au over 0.5 m with 8 clusters of visible gold and 7.9 g/t Au over 1.0 m (Blue Grass

sector)

✓ 17.0 g/t Au over 0.5 m with 1 cluster of visible gold (West Portal sector)

➢ Expansion of the area of high-grade gold (FIGURE)

✓ 18.0 g/t Au over 1.7 m included within 7.5 g/t Au over 4.6 m with 1 cluster of visible gold,

situated in the West Simon Sector between:

• The Portal Zone (7.2 g/t Au over 8.0 m; previously announced October 30 2024) and

• The VG31 intersection (35.3 g/t Au over 4.4 m; previously announced November 20 2024).

➢ The 2024 exploration drilling program consisting of 162 holes for a total of 28,084 m was spread

over 49 different drill sites and discovered, over a distance of 10 km within the Larder Lake - Cadillac

Fault Zone, 10 high-grade gold areas (FIGURE).

“ The 10 high-grade gold areas discovered in 2024 are, located within 5 km on either side of the NI 43-101

resource estimate, in a prolific fault zone recognized for its mining potential and reported in a high gold price

environment, provide the key elements required for rapid development of the East Cadillac asset ”

commented Philippe Cloutier, President and CEO.

Table: Details of the new high-grade gold results

Hole Coordinates

UTM (m)

Azimuth (°) /

Plunge (°)

From

(m)

To

(m)

Au

(g/t)

Length

(m) Sector

CH24-226 329582/5320798/338 172 / -70 74.9 75.4 44.7* 0.5 Blue

Grass CH24-216 329474/5320918/338 174 / -46 60.5 61.5 7.9 1.0

CH24-203

330709/5320411/339 183 / -77

216.1 217.8 18.0* 1.7 West

Simon included within 214.0 218.6 7.5 4.6

CH24-206 329488/5320426/343 184 / -45 69.0 69.5 17.0* 0.5 West

Portal

* Presence of visible gold.

The lengths of the mineralized intersections are expressed as measured lengths along the drill core.

The estimated true widths of the mineralized intersections are approximately 60 to 90% of the reported lengths.

Quality Assurance / Quality Control

For each batch of samples sent to the laboratory, Cartier inserts 5% of the number of samples in the form

of certified standards and another 5% in the form of blanks to ensure quality control. The samples are

analyzed at the Techni -Lab (Actlabs) laborator y in Ste -Germaine-Boulé, Qu ébec, Canada. Samples

weighing 3 to 5 kg are crushed by the laboratory to 90% passing 10 mesh (2.00 mm), then a 500 g fraction

of each sample is pulverized to 90% passing 200 mesh (0.07 mm). The resulting 50 g pulps are analyzed

by fire assay with an atomic absorption finish. Samples with results ≥ 1.0 g/t and < 10.0 g/t are re-assayed

by fire assay with an atomic absorption finish. Results greater than or equal to 10.0 g/t Au are analyzed by

fire assay with a gravimetric finish. For samples containing visible gold, a 500 g subsample of rock is

analyzed by the metallic sieve method.

Qualified Persons

The Company’s scientific and technical information in this news release was prepared and reviewed by

Mr. Gaétan Lavallière, P.Geo., Ph.D., Vice -President, and Mr. Ronan Déroff, P.Geo., M.Sc., Senior

Geologist, Project Manager and Geomatician, both qualifie d persons as defined in National Instrument

43 - 101. Mr. Lavallière approved the information contained in this press release.

About Cartier Resources Inc.

Founded in 2006, Cartier Resources Inc. is an exploration company based in Val -d’Or, Québec, Canada.

The Company’s projects are located in Qu ébec, which consistently ranks among the world’s best mining

jurisdictions. Cartier is actively advancing the development of its flagship East Cadillac Project and is

looking for business partners for its other projects. The Company has significant corporate and institutional

support, including Agnico Eagle Mines, O3 Mining and provincial investment funds.

- 30 -

For more information, contact:

Philippe Cloutier, P.Geo.

President and CEO

Telephone: 819-856-0512

[email protected]

www.ressourcescartier.com

Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or

accuracy of this press release.