Cartier Cuts 11.0 g/t Au over 9.0 m including 30.2 g/t Au over 2.5 at Contact (Cadillac); Continues to Expand High-Grade Gold North Contact Zone near Surface
Cartier Cuts 11.0 g/t Au over 9.0 m including 30.2 g/t Au over 2.5 at Contact
(Cadillac); Continues to Expand High-Grade Gold North Contact Zone near
Surface
VAL-D’OR, Quebec, Oct. 21, 2025 -- Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR; FSE: 6CA) is
pleased to announce the third batch of results from the fully funded 100,000-m drilling program (2 drill rigs) for the Contact
Sector and more precisely, the North Contact Zone (NCZ), on its 100%-owned Cadillac Project, located in Val-d’Or (Abitibi,
Quebec). The NCZ consists of three parallel high-grade gold zones: NCZ (1), NCZ (2) and NCZ (3).
Strategic Highlights from Contact Sector
Drill Results of NCZ (Figures 1 & 2)
• NCZ (3) intersected in hole CA25-530 graded 30.2 g/t Au over 2.5 m included in 11.0 g/t Au over 9.0 m with presence
of visible gold grains , at a depth of 270 m, hole CA25-527 reported 27.1 g/t Au over 1.0 m included in 2.2 g/t Au
over 18.0 m at a depth of 325 m and hole CA25-529 cut 6.1 g/t Au over 1.0 m included in 4.3 g/t Au over 4.0 m at a
depth of 215 m.
• NCZ (1) intersected in hole CA25-526 graded 11.7 g/t Au over 0.5 m , at a depth of 230 m and hole CA25-530 reported
10.4 g/t Au over 0.5 m with presence of visible gold grains, at a depth of 200 m.
• NCZ (1) and NCZ (3) are spaced approximately 50 m apart.
Significance for Investors
• Holes CA25-526, CA25-527, CA25-529 and CA25-530 continue to clearly demonstrate the presence of a shallow
and extensive mineralized system, hosting multiple high-grade gold zones with significant grades and
widths. The mineralization has now been extended over 400 m in strike length by 300 m in depth , remains open in
all directions, suggesting significant expansion potential .
• These latest assay results follow up on previously reported intercepts, including 16.7 g/t Au over 2.1 m within a
broader interval of 5.9 g/t Au over 7.7 m (hole CA25-524) and 4.3 g/t Au over 2.0 m (hole CA25-525), as disclosed in
Cartier’s September 23, 2025 news release titled ″ Cartier Cuts 16.7 g/t Au over 2.1 m at Contact (Cadillac);
Strengthens Shallow High-Grade Gold Potential; Supports Expansion Drilling. ″
• The combination of exposed bedrock , minimal overburden (less than 5 m) and proximity to year-round road
access (within 250 m) positions NCZ as a highly strategic asset for potential shallow operation scenarios . These
logistical advantages should significantly enhance the development flexibility and economics of the Cadillac
Project.
Next Steps
• Additional drilling is required on NCZ to confirm geological continuity , expand gold mineralization (150-300
m), extend footprint closer to surface (0-150 m) and advance toward a future gold inventory .
• Further exploration drilling is already planned to test several new high-priority regional targets at Contact
Sector, backed by detailed structural and geological modelling and VRIFY’s artificial intelligence (AI) driven
targeting, reinforcing the potential for additional gold discoveries .
"This second set of high-grade gold results in the Contact Sector is extremely encouraging for the long-term potential of the
Cadillac Project. The decision to allocate part of the 100,000-m drill program to this sector is clearly delivering strong results
for our shareholders. These outcomes reflect our focused strategy of advancing known mineralized zones while also targeting
high-priority regional exploration opportunities." – Philippe Cloutier, President and CEO of Cartier.
"The updated geological model, from continuous analysis and interpretation of results, is yielding positive results and
highlighting the significant potential of the Contact Sector. Improved understanding of the structural features is allowing us to
more efficiently and accurately target mineralized zones. The gold potential of the Héva Fault Zone, hosting NCZ, remains
largely underexplored and we believe there is significant upside yet to be unlocked. " – Ronan Deroff, Vice President
Exploration of Cartier.
Figure 1: Plan view, cross and long sections of the Contact Sector
Figure 2: Photos of the drill core from hole CA25-530
Table 1 : Drill hole best assay results from Contact Sector
Hole Number From (m) To (m) Core Length**
(m) Au (g/t) Uncut Vertical Depth
(m) Zone
CA25-526 239.0 239.5 0.5 11.7 ≈230 North Contact (1)
And 277.1 282.1 5.0 1.1 ≈270 North Contact (2)
CA25-527 252.0 262.0 10.0 1.0 ≈250 North Contact (2)
And 322.0 340.0 18.0 2.2 ≈325 North Contact (3)Including 339.0 340.0 1.0 27.0
CA25-528 194.0 205.0 11.0 1.0* ≈160 North Contact (3)
CA25-529 151.0 152.0 1.0 6.2 ≈135 North Contact (1)
And 237.0 241.0 4.0 4.3 ≈215 North Contact (3)Including 240.0 241.0 1.0 6.1
CA25-530 209.0 209.5 0.5 10.4* ≈200 North Contact (1)
And 280.0 289.0 9.0 11.0* ≈270 North Contact (3)Including 282.0 284.5 2.5 30.2*
* Occurrences of visible gold (VG) have been noted in the drill core at various intervals. ** Based on the observed intercept
angles within the drill core, true thicknesses are estimated to represent approximately 50–85% of the reported core length
intervals.
Contact Sector
The Contact Sector is a highly prospective area featuring the North Contact Zone ("NCZ") and several newly defined high-
priority drill targets.
The NCZ lies along an east-west trending, strongly sheared corridor (Héva Fault Zone), situated approximately 900 m north of
the Cadillac Fault Zone, and occurs at the contact between the hanging wall mafic to intermediate volcanics (basalt to
andesite) of Louvicourt Group and the footwall turbiditic sedimentary rocks (wacke-mudrock) of Cadillac Group. This lithological
contact is a favorable horizon for hydrothermal fluid flow, likely related to synvolcanic gold deposition.
The NCZ, defined by at least three parallel gold-rich zones, are typically and primarily associated with a fine-grained and
disseminated arsenopyrite-pyrrhotite mineralization, with a pervasive biotite-chlorite-carbonate alteration, all crosscut by late-
stage smoky quartz vein and veinlet stockworks containing visible gold. Locally, accessory minerals such as sphalerite,
galena and tourmaline are observed.
Milestones of 2025-2027 Exploration Program
100,000 m Drilling Program (Q3 2025 to Q2 2027)
The ambitious 600-hole drilling program will both expand known gold zones (Brownfield Growth) and test new shallow surface
high-potential targets (Greenfield Discovery). The objective is to unlock the camp-scale, high-grade gold potential along the 15
km Cadillac Fault Zone. It is important to note that Cartier’s recent consolidation of this large land holding offers the unique
opportunity in over 90 years for unrestricted exploration.
Environmental Baseline Studies & Economic Evaluation of Chimo mine tailings (Q3 2025 to Q3 2026)
The baseline studies will be divided into two distinct parts which include 1) environmental baseline desktop study and 2)
preliminary environmental geochemical characterization. The initial baseline studies will provide a comprehensive
understanding of the current environmental conditions and implement operations that minimize environmental impact while
optimizing the economic potential of the project. These studies will be supplemented by an initial assessment of the economic
potential of the past-producing Chimo mine tailings to determine whether a quantity of gold can be extracted economically.
Metallurgical Sampling and Testwork Program (Q4 2025 to Q1 2026)
The metallurgical testwork program includes defining of expected gold recovery rates and improving historical results from the
Chimo deposit, as well as establishing metallurgical recovery data for the first-time for the East Chimo and West Nordeau
satellite deposits, where no previous data exists. This comprehensive program will characterize the mineralized material, gold
recovery potential and validate optimal grind size defining the most efficient and cost-effective flowsheet. The data generated
will directly support optimized project development and have the potential to significantly reduce both capital and operating
costs, while also improving the environmental footprint.
Table 2 : Drill hole collar coordinates from Contact Sector
Hole Number UTM Easting (m) UTM Northing (m) Elevation (m) Azimuth (°) Dip (°) Hole Length (m)
CA25-526 335670 5320160 364 228 -76 392
CA25-527 335670 5320160 364 198 -81 384
CA25-528 335729 5320155 363 186 -55 240
CA25-529 335729 5320155 363 197 -66 270
CA25-530 335729 5320155 363 198 -74 316
Table 3 : Drill hole detailed assay results from Contact Sector
Hole Number From (m) To (m) Core Length* (m) Au (g/t) Uncut Vertical Depth (m) Zone
CA25-526 220.0 221.0 1.0 1.3 ≈210
North Contact (1)And 233.0 234.0 1.0 1.3
≈230And 234.5 235.0 0.5 1.2
And 239.0 239.5 0.5 11.7
And 277.1 282.1 5.0 1.1
≈270 North Contact (2)
Including 277.1 278.1 1.0 1.4
Including 279.1 280.1 1.0 1.6
Including 280.1 281.1 1.0 1.2
Including 281.1 282.1 1.0 1.0
And 330.0 331.0 1.0 4.0 ≈320 North Contact (3)
And 331.0 332.0 1.0 1.6
CA25-527 252.0 262.0 10.0 1.0
≈250
North Contact (2)
Including 252.0 253.0 1.0 2.1
Including 253.0 254.0 1.0 1.0
Including 255.0 256.0 1.0 1.1
Including 261.0 262.0 1.0 2.1
And 272.0 273.0 1.0 3.7 ≈265
And 282.0 283.0 1.0 1.3 ≈275
And 322.0 340.0 18.0 2.2
≈325 North Contact (3)
Including 322.0 323.0 1.0 2.9
Including 324.0 325.0 1.0 2.4
Including 325.0 326.0 1.0 5.8
Including 339.0 340.0 1.0 27.0
CA25-528 194.0 205.0 11.0 1.0*
≈160
North Contact (3)
Including 195.0 196.0 1.0 2.4
Including 197.0 198.0 1.0 2.7
Including 201.5 202.5 1.0 1.7*
Including 204.0 205.0 1.0 1.8
CA25-529 151.0 152.0 1.0 6.2 ≈135 North Contact (1)
And 237.0 241.0 4.0 4.3
≈215
North Contact (3)
Including 237.0 238.0 1.0 3.8
Including 238.0 239.0 1.0 4.2
Including 239.0 240.0 1.0 3.1
Including 240.0 241.0 1.0 6.1
And 242.0 243.0 1.0 1.2
And 253.0 254.0 1.0 2.0 ≈225
CA25-530 209.0 209.5 0.5 10.4* ≈200 North Contact (1)
And 223.5 224.5 1.0 1.3 ≈210 North Contact (2)
And 280.0 289.0 9.0 11.0*
≈270 North Contact (3)
Including 2800 281.0 1.0 1.9
Including 281.0 282.0 1.0 2.6
Including 282.0 283.0 1.0 9.4
Including 283.0 284.0 1.0 62.9
Including 284.0 284.5 1.0 6.6*
Including 284.5 285.0 1.0 2.0
Including 285.0 286.0 1.0 2.6
Including 286.0 287.0 1.0 1.4
Including 288.0 289.0 1.0 13.4
And 295.0 296.0 1.0 1.9
* Occurrences of visible gold (VG) have been noted in the drill core at various intervals. ** Based on the observed intercept
angles within the drill core, true thicknesses are estimated to represent approximately 50–85% of the reported core length
intervals.
Quality Assurance and Quality Control (QA/QC) Program
The drill core from the Cadillac Project is NQ-size and, upon receipt from the drill rig, is described and sampled by Cartier
geologists. Core is sawn in half, with one half labelled, bagged and submitted for analysis and the other half retained and
stored at Cartier’s coreshack facilities located in Val-d’Or, Quebec, for future reference and verification. As part of Quality
Assurance and Quality Control (QA/QC) program, Cartier inserts blank samples and certified reference materials (standards)
at regular intervals into the sample stream prior to shipment to monitor laboratory performance and analytical accuracy.
Drill core samples are sent to MSALABS's analytical laboratory located in Val-d’Or, Quebec, for preparation and gold analysis.
The entire sample is dried and crushed (70% passing a 2-millimeter sieve). The analysis for gold is performed on an
approximately 500 g aliquot using Chrysos Photon Assay™ technology, which uses high-energy X-ray excitation with gamma
detection to quickly and non-destructively measure gold content.
Alternatively, samples are submitted to Activation Laboratories Ltd. ("Actlabs"), located in either Val-d’Or or Ste-Germaine-
Boulé, both in Quebec, for preparation and gold analysis. The entire sample is dried, crushed (90% passing a 2-millimetre
sieve) and 250 g is pulverized (90% passing a 0.07-millimetre sieve). The analysis for gold is conducted using a 50 g fire assay
fusion with atomic absorption spectroscopy (AAS) finish, with a detection limit up to 10,000 ppb. Samples exceeding this
threshold are reanalyzed by fire assay with a gravimetric finish to determine high-grade values accurately.
Both MSALABS and Actlabs are ISO/IEC 17025 accredited for gold assays and implement industry-standard QA/QC
protocols. Their internal quality control programs include the use of blanks, duplicates, and certified reference materials at set
intervals, with established acceptance criteria to ensure data integrity and analytical precision.
Qualified Person
The scientific and technical content of this press release has been prepared, reviewed and approved by Mr. Ronan Déroff,
P.Geo., M.Sc., Vice President Exploration, who is a ″Qualified Person″ as defined by National Instrument 43-101 – Standards
of Disclosure for Mineral Projects (″NI 43-101″).
About Cadillac Project
The Cadillac Project, covering 14,000 hectares along a 15-kilometre stretch of the Cadillac Fault, is one of the largest
consolidated land packages in the Val-d’Or mining camp. Cartier’s flagship asset integrates the historic Chimo Mine and East
Cadillac projects, creating a dominant position in a world class gold mining district. With excellent road access, year-round
infrastructure and nearby milling capacity, the project is ideally positioned for rapid advancement and value creation.
Using a gold price of US$1,750/oz, a Preliminary Economic Assessment demonstrated the economic viability of a 2-km
segment, compared to the 15 km that will be the subject of the 100,000 m drilling program, with an average annual gold
production of 116,900 oz over a 9.7-year mine life. Indicated resources are estimated at 720,000 ounces (7.1 million tonnes at
3.1 g/t Au) and inferred resources at 1,633,000 ounces (18.5 million tonnes at 2.8 g/t Au). Please see the NI 43-101 ″
Technical Report and Preliminary Economic Assessment for Chimo Mine and West Nordeau Gold Deposits, Chimo Mine and
East Cadillac Properties, Quebec, Canada, Marc R. Beauvais, P.Eng., of InnovExplo Inc., Mr. Florent Baril of Bumigeme and
Mr. Eric Sellars, P.Eng. of Responsible Mining Solutions″ effective May 29, 2023.
About Cartier Resources Inc.
Cartier Resources Inc., founded in 2006 and headquartered in Val-d’Or (Quebec) is a gold exploration company focused on
building shareholder value through discovery and development in one of Canada’s most prolific mining camps. The Company
combines strong technical expertise, a track record of successful exploration, and a fully funded program to advance its
flagship Cadillac Project. Cartier’s strategy is clear: unlock the full potential of one of the largest undeveloped gold
landholdings in Quebec.
For further information, contact:
Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
www.ressourcescartier.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/4c94767e-126a-4d86-8ce2-0a4661805df7
https://www.globenewswire.com/NewsRoom/AttachmentNg/da3b89aa-ecc3-46c7-97e0-67013c6dea9c