Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EAU.V ·

Latest Exploration Results Ne of Historic Engineer Workings

Exploration Programs

LATEST EXPLORATION RESULTS NE OF HISTORIC ENGINEER WORKINGS

January 12, 2021

Vancouver, British Columbia – Engineer Gold Mines Ltd. (the “Company” or “Engineer”) (TSXV:

EAU) is pleased to announce the latest exploration results from the Happy Sullivan - Bee Peaks

area on the Company’s Engineer Gold Mine Property . Results from exploration in this area,

completed earlier in the summer, were released in news releases dated August 20 and December

17, 2020 which can be viewed on the Company’s website. Happy Sullivan - Bee Peaks is located

3 km northeast of the Company’s historic Engineer Gold Mine and has never been drilled.

The additional results obtained include an average of 1.21 g/t Au from six grab samples of quartz

vein, stringer and quartz-argillite breccia, with crustiform textures, approximately 0.7 to 1.1 km

northeast of the main Happy Sullivan adit. The samples rang ed from 0.37 to 2.58 g/t Au ,

accompanied by anomalous silver, and high arsenic, antimony, ±mercury . This geochemical

signature suggests a high vertical level within the epithermal system, which has not been tested

at depth. The mineralization is associated with north-easterly trending lineaments, which appear

to converge at Happy Sullivan. Previous exploration concentrated on tracing the Happy Sullivan

veins to the north as opposed to the east-northeast to northeast.

Company President, Andrew H. Rees, states “We are looking forward to exploring the emerging

northeasterly trend of the Happy Sullivan - Bee Peaks system by prospecting/mapping and

induced polarization geophysics, and testing the depth potential of the system by diamond drilling

in 2021.”

All samples were sent to Activation Laboratories Ltd (“Actlabs”), Kamloops for sample preparation

and analysis. Gold assays were completed by metallic screen fire assay analysis by method code

1A4-1000, where the entire sample is crushed to 80% - 2mm and a 1000g sample split is

pulverized and sieved to 149μm (100 mesh) with gold analyzed by fire assay on the entire +149μm

fraction and two splits of the -149μm fraction. A final gold assay is calculated based on the gold

content and weight of each fraction. All samples were also analyzed for 38 additional elements

by method code 1E3 involving aqua regia digestion of a 0.5g sub-sample followed by Inductively

Coupled Plasma - Optical Emission Spectroscopy (ICP-OES) analysis. Additional quality control

samples are regularly analyzed by the laboratory and include blanks, certified reference materials,

and duplicates of crushed and pulverized material. Actlabs is ISO/IEC 17025:2017 accredited for

the procedures performed.

The technical information in this news release was reviewed by Jean Pautler, P.Geo., a qualified

person with respect to NI 43-101.

About Engineer Gold Mines Ltd.

Engineer Gold Mines Ltd. is focused on reestablishing gold production at the Company’s 100% -

owned, historical high-grade Engineer Gold Mine, 32km southwest of Atlin, BC. Exploration and

development work has identified numerous high-grade vein and shear-hosted bulk-tonnage gold

targets over the Company’s 25 km long (18,319 hectare) contiguous claim grouping, which

includes prospects: Wann River, 5 km to the southwest; Happy Sullivan, 3 km to the northeast;

and TAG, acquired in 2020, 7 km to the north, of the historical Engineer Mine.

For additional information please visit the company website at www.engineergoldmines.com.

On Behalf of the Board of Directors

Engineer Gold Mines Ltd.

“Andrew H. Rees”

Mr. Andrew H. Rees

President

Contact Information:

Andrew H. Rees: 604-505-3739

Email: [email protected]

Cautionary Note Regarding Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This

news release contains certain forward-looking statements which involve known and unknown risks, delays,

and uncertainties not under the control of Engineer Gold Mines Ltd. which may cause actual results,

performance or achievements of Engineer Gold Mines Ltd. to be materially different from the results,

performance or expectation implied by these forward looking state ments. By their nature, forward -looking

statements involve risk and uncertainties because they rela te to events and depend on factors that will or

may occur in the future. Actual results may vary depending upon exploration activities, industry production,

commodity demand and pricing, currency exchange rates, and, but not limited to, general economic factors.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.