Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EAU.V ·

Increase in Size of Land Package at Engineer Gold Mine Property

Mergers & Acquisitions Property Options & Staking

ENGINEER GOLD MINES LTD.

Suite 804 - 750 West Pender Street

Vancouver, B.C. V6C 2T7

Telephone: 604.682.2928

Fax: 604.685.6905

www.engineergoldmines.com

Increase in Size of Land Package at Engineer Gold Mine Property

August 6, 2020

Vancouver, BC – Engineer Gold Mines Ltd. (the “Company”) (TSXV: EAU) announces

the acquisition of an additional 3,213 hectares in the area of the Engineer Gold Mine

property, 32 km southwest of Atlin, BC. The newly acquired claims increase the total

land package at the Engineer Gold Project to 18,319 hectares over a 25 km trend. Visit

the Company’s website at www.engineergoldmines.com/news to view an accompanying

property map to this news release.

Company President Andrew H. Rees c ommented “Management and ou r exploration

team are excited to have expanded the high-grade epithermal Engineer Gold Project

along a 25 km trend in northwestern British Columbia.”

Mr. Rees continued by stating “The southern portion of the Engineer Project contains

the Wann River prospect that includes the Discovery Trench , where historic samples

returned grades of 263 g/t gold “Au”. The c enterpiece of the Project, 4 km north of

Wann River is the hig h-grade Engineer Gold Mine tha t prod uced 18,000 oz Au

averaging 39 g/t and selected grab samples from levels 5, 6 , 7 and 8 in underground

workings reportedly assayed 44,142 g/t Au, 12,720 g/t Au, 3,180 g/t Au and 547 g/t Au,

respectively. Three km north of the Engineer Mine is the Happy Sullivan prospect where

an historic sample reportedly assayed 3,257 g/t Au. Six km further north of the Engineer

Mine is the newly acquired Tag deposit with an historic mineral resource estimate that

the company will end eavour to re -classify as a current mineral resource upon

completion of future work programs.”

In closing Mr. Rees stated, “Now that the Company has acquire d the land it deems

important to the Engineer Gold Project, and with gold prices recently breaking record

highs, we will immediately focus on obtaining the necessary approvals to complete high-

grade (+1 oz/t Au) annual bulk samples utilizing the Company’s operational mill in place.

The Company’s objective will be to leverage bulk sampling operations to proceed with

project wide exploration on what could be a significant epithermal gold project.”

The new ly acquired claims are primarily centered on Golden Mou ntain to cover the

continuation of significant structures at the recently examined Happy Sullivan prospect

and newly identified structures recognized by the Company during its current

exploration program, as well as structures and mineralization identified from historical

exploration and anomalous regional geochemical stream survey data identified by the

BC Geological Survey.

2

The northwestern claims cover an area proximal to a favourable flexure in the Llewellyn

fault system proximal to a significant intersec tion with a prominent, mineralized north-

northeast trending structure.

Jean Pautler, P. Geo., is the Company’s Qualified Person under NI 43 -101 with respect

to all technical disclosure relating to the Property.

About Engineer Gold Mines Ltd.

Engineer Gold is focused on the exploration and development of the 100% -owned, Engineer

Gold Mine Property, centered on the Historic high -grade Enginee r Gold Mine situated 32 km

southwest of Atlin, B.C. Pre vious work ha s identifie d numerous high -grade vein and shear -

hosted bulk-tonnage gold exploration targets including Wann River to the southwest and Happy

Sullivan to the northeast of the Engineer Gold Mine.

For additional information please visit the company website at www.engineergoldmines.com

On Behalf of the Board of Directors

Contact Information

Engineer Gold Mines Ltd. Corporate Inquiries:

"Andrew H. Rees" Andrew H. Rees: 604-505-3739

Mr. Andrew H. Rees Email: [email protected]

President

Cautionary Note Regarding Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts resp onsibility for the adequacy or accuracy

of this release.

This news rel ease contains certain forward looking statements which involve known and

unknown risks, delays, and uncertainties not under the c ontrol of Engineer Gold Mines Ltd.

which may cause actu al results, p erformance or achievements of E ngineer Gold Mines Ltd. to

be materially different from the results, performance or expectation implied by these forward

looking statements. By their nature, forward looking statements involve risk and uncertaint ies

because they relate to events and depend on factors that will or may occur in the future. Actual

results may vary depending upon exploration activities, industry production, commodity demand

and pricing, currency exchange rates, and, but not limited to , general economic factors. Neither

the TSX Venture Exchange nor its Reg ulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the ad equacy or accuracy of

this release.

3