Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EAU.V ·

Engineer Gold Mines Initiates Water Monitoring Well Drill Program in Support of a Bulk Sample Permit

Exploration Programs Permits & Approvals Metallurgy & Processing

Engineer Gold Mines Initiates Water Monitoring Well Drill Program in Support of a Bulk

Sample Permit

October 14, 2021

Vancouver, British Columbia – Engineer Gold Mines Ltd. (the “Company” or “Engineer”) (TSXV:

EAU) is pleased to announce it has begun a program to drill water monitoring wells in the vicinity

of the proposed tailings storage facility (“TFS”) in support of its application to complete a 10,000

tonne bulk sample at its Engineer Gold Mine project near Atlin, BC.

Working with Tetra Tech Canada Inc., 4 water monitoring wells will be drilled around the proposed

TSF within the general footprint of the existing 30 tonne per day mill facility area at the Engineer

Gold Mine. The water monitoring wells are expected to be drilled to a depth of between 30 to 100

meters. This and additional environmental baseline data collected in 2021 is expected to support

the advancement of permit applications towards obtaining authorization to complete a 10,000 -

tonne bulk sample.

About Engineer Gold Mines Ltd.

Engineer Gold Mines Ltd. is focused on reestablishing gold production at the Company’s 100%-

owned, historical high-grade Engineer Gold Mine, 32km southwest of Atlin, BC. Exploration and

development work has identified numerous high-grade vein and shear-hosted bulk-tonnage gold

targets over the Company’s 25 km long (18,319 hectare) contiguous claim grouping, which

includes prospects: Wann River, 5 km to the southwest; Happy Sullivan, 3 km to the northeast;

and TAG, acquired in 2020, 7 km to the north, of the historical Engineer Mine.

For additional information please visit the company website at www.engineergoldmines.com.

On Behalf of the Board of Directors

Engineer Gold Mines Ltd.

“Andrew H. Rees”

Mr. Andrew H. Rees

President

Contact Information:

Andrew H. Rees: 604-505-3739

Email: [email protected]

Cautionary Note Regarding Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This

news release contains certain forward-looking statements which involve known and unknown risks, delays,

and uncertainties not under the control of Engineer Gold Mines Ltd. which may cause actual results,

performance or achievements of Engineer Gold Mines Ltd. to be materially different fro m the results,

performance or expectation implied by these forward looking state ments. By their nature, forward -looking

statements involve risk and uncertainties because they relate to events and depend on factors that will or

may occur in the future. Actual results may vary depending upon exploration activities, industry production,

commodity demand and pricing, currency exchange rates, and, but not limited to, general economic factors.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.