Blind Creek files Technical Report for Engineer Gold Mine Property, B.C.

Resource Estimates Technical Reports (NI 43-101)

Blind Creek files Technical Report for Engineer Gold Mine Property, B.C.

VANCOUVER, Jan. 30, 2018 /CNW/ - (TSX-V: BCK) – Blind Creek Resources Ltd. ("Blind Creek" or

the "Company") is pleased to announce the filing on SEDAR of a NI 43-101 Technical Report (the

"Engineer Gold Mine Technical Report") for the Comp any's 100% owned Engineer Gold Mine Property,

situated 32 kilometres northwest of Atlin, B.C. The Technical Report, which includes a re-stated Infe rred

Mineral Resource Estimate and is entitled "Engineer Gold Mine, British Columbia, Canada, January 2018"

was written by Darren O'Brien, P. Geo, Michael Redf earn, P. Eng. and Dr. Simon Dominy, FAusIMM(CP),

FGS(CGeol), dated January 18, 2018. The Engineer Go ld Mine Technical Report is also available for

download from the Company's website at www.blindcreekresources.com .

Engineer Gold Mine Property Spinout

The Engineer Gold Mine Technical Report provides ba sis for Blind Creek's recently announced intention

to transfer its Engineer Gold Mine Property to Engineer Gold Mines Ltd. ("Engineer"), a wholly-owned

subsidiary of Blind Creek, subject to receipt of all required regulatory approvals, for common shares of

Engineer (the "Engineer Distribution Shares"). The Engineer Distribution Shares will then be distributed to

the common shareholders of Blind Creek, on a one En gineer Share for every 2 Blind Creek Shares held

on the Record Date, on the reduction of the stated capital of the Blind Creek common shares, all by wa y

of a plan of arrangement (the "Plan of Arrangement") under the Business Corporations Act (British

Columbia) (the "Arrangement"). Blind Creek and Engineer have entered into an arrangement agreement

(the "Arrangement Agreement") dated January 19, 2018 in connection with the Arrangement (which has

been filed under Blind Creek's profile on www.SEDAR.com .)

The Company believes that the Engineer Gold Mines P roject has exploration potential that should be

pursued separately. The creation of Engineer and the distribution of the Engineer Distribution Shares to

the Blind Creek common shareholders will allow the Blind Creek shareholders to focus exclusively on the

predominantly based metal properties which remain i n Blind Creek after the redistribution and the

Engineer shareholders to focus on the Engineer Gold Mines Project. For further details on the Engineer

Gold Mine Technical Report and the Transaction, the reader is referred to the Blind Creek News Release

dated January 19, 2018.

A two-phase, $6.2 million, exploration and developm ent program is recommended in the Engineer Gold

Mine Technical Report, with Phase 1 (at an estimated cost of $200,000) focusing on resource expansion

through surface exploration, finalizing metallurgy test-work, and detailed design and costing to rehab ilitate

the lower levels of the mine. Phase 2 (at an estimated cost of $6.0 million, and contingent upon results of

Phase 1) would focus on surface exploration, exploration of 8 Level of the mine, and processing of a bulk

sample from 6 Level.

About Blind Creek Resources Ltd.

Blind Creek is a Vancouver-based junior resource company focused on lead-zinc-silver project

acquisition, exploration and development in Yukon (Blende Property) and the Northwest Territories (AB

Property). The Company's flagship property is the Blende Property in north-central Yukon, the largest

undeveloped carbonate-hosted Zinc-Lead-Silver depos it in Yukon. More recently the company has signed

an agreement to acquire a 100% interest in the AB Property, a mid-stage Mississippi Valley (MV-Type)

Zinc-Lead exploration property in Northwest Territories and purchased the Historic and fully-permitted

Engineer Gold Mine, situated 32 km southwest of Atlin, B.C.

For additional information please visit the company website www.blindcreekresources.com .

On behalf of the Board of Directors,

Mr. Brian P. Fowler, P.Geo.

President

[email protected]

Neither TSX Venture Exchange nor its Regulation Ser vices Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This news release contains certain forward looking statements which involve known and unknown risks,

delays, and uncertainties not under the control of Blind Creek Resources Ltd. which may cause actual

results, performance or achievements of Blind Creek Resources Ltd to be materially different from the

results, performance or expectation implied by these forward looking statements. By their nature, forw ard

looking statements involve risk and uncertainties because they relate to events and depend on factors

that will or may occur in the future. Actual results may vary depending upon exploration activities, i ndustry

production, commodity demand and pricing, currency exchange rates, and, but not limited to, general

economic factors. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accura cy

of this release.

SOURCE Blind Creek Resources Ltd.

View original content with multimedia:

http://www.newswire.ca/en/releases/archive/January2 018/30/c7024.html

%SEDAR: 00030605E

For further information: MarketSmart Communications Inc., (877) 261 4466, w ww.marketsmart.ca;

Nelson Da Silva - Manager Corporate Communications, (604) 722-0041

CO: Blind Creek Resources Ltd.

CNW 07:00e 30-JAN-18