Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EAM.V ·

East Africa Metals receives final Mato Bula infill diamond drill program results, including 5.89 metres grading 53.32 grams per tonne gold.

Drill Results

Suite 700 – 1055 W. Georgia Street

PO Box 11108, Vancouver, BC, Canada V6E 3P3

Tel: 604.488.0822

Toll Free: 866.488.0822

Fax: 604.899.1240

Web: www.eastafricametals.com

NEWS RELEASE

East Africa Metals receives final Mato Bula infill diamond drill program results, including 5.89

metres grading 53.32 grams per tonne gold.

Vancouver, British Columbia – August 14, 2017 – East Africa Metals Inc. (TSX-V: EAM) (“East Africa” or the

“Company”) is pleased to announce final diamond drill hole results from the most recent infill diamond

drilling program at the Mato Bula deposit, part of the Company’s Adyabo Project in Ethiopia.

Highlight intersections include:

 5.89 metres grading 53.32 grams per tonne gold, 0.51 % copper, and 2.6 grams per tonne silver

from 54.56 metres drill depth, and 10.26 metres grading 8.90 grams gold, 0.05 % copper, and 3.7

grams per tonne silver from 20.54 metres drill depth (WMD097), and;

 4.33 metres grading 38.94 grams per tonne gold, 0.24% copper, and 2.6 grams per tonne silver,

from 160.60 metres drill depth (WMD090).

Adyabo Project Mato Bula Work Program

Trenching and diamond drill hole supplemental sampling was completed to assist in planned resource

update work. Additional metallurgical samples from Mato Bula were also collected and have now been

received by the Blue Coast Metallurgical Group in B.C. Canada. Results for the metallurgical work and

resource update are anticipated for Q4 2017. In accordance with project advancement, in July 2017 East

Africa also initiated an independent Environmental and Social Impact Assessment study for the Adyabo

resource area, with completion estimated for Q4 2017.

Mato Bula infill diamond drill intercepts

Hole ID From (m) To (m) Interval

(m) 1

Gold

g/t2,3

Copper

%

Silver

g/t

Zinc

%

Local

Azimuth Dip

WMD089

31.00 41.23 10.23 6.46 0.25 0.9 0.02

270 -47 including 36.30 39.55 3.25 17.73 0.59 1.7 0.03

60.00 62.86 2.86 1.17 1.65 17.1 1.46

WMD090 160.60 164.93 4.33 38.94 0.24 2.6 0.01 270 -49 including 161.51 163.33 1.82 91.95 0.48 5.6 0.01

WMD091 52.00 53.00 1.00 1.21 0.05 0.6 0.00 270 -48

WMD092 22.80 25.80 3.00 0.44 0.26 0.5 0.00 270 -46

WMD093 32.94 42.81 9.87 1.59 0.76 7.2 0.04 90 -47

WMD094 182.68 183.68 1.00 2.32 0.54 0.9 0.01 90 -49

WMD095 191.25 193.10 1.85 1.34 2.42 38.5 0.02 90 -60 210.20 212.80 2.60 1.11 0.83 0.9 0.00

WMD096 96.37 102.00 5.63 1.30 0.45 2.4 0.08 90 -49 118.96 120.05 1.09 19.10 0.76 5.2 0.00

WMD097 20.54 30.80 10.26 8.90 0.05 3.7 0.02 90 -47 54.56 60.45 5.89 53.32 0.51 2.6 0.01

WMD098 26.55 34.80 8.25 2.62 0.10 1.4 0.01 90 -58

WMD099 106.85 107.80 0.95 1.88 0.15 0.8 0.00 90 -49

Hole ID From (m) To (m) Interval

(m) 1

Gold

g/t2,3

Copper

%

Silver

g/t

Zinc

%

Local

Azimuth Dip

WMD100 No Significant Results 90 -49

WMD101 No Significant Results 271 -49

WMD102 51.00 52.00 1.00 3.90 0.08 0.0 0.00 270 -51 119.15 137.26 18.11 0.70 1.30 9.2 0.20

WMD103 No Significant Results 90 -52

WMD104A 237.31 251.80 14.49 1.91 0.08 1.2 0.00 90 -55 264.60 274.00 9.40 0.68 0.08 1.1 0.00

WMD105

200.00 232.75 32.75 0.92 0.11 1.0 0.00

90 -53 including 201.60 205.00 3.40 3.00 0.12 1.4 0.01

247.00 254.00 7.00 0.49 0.02 0.4 0.00

WMD106 169.64 188.00 18.36 0.77 0.02 2.2 0.00 90 -63 including 182.00 185.00 3.00 1.74 0.02 0.6 0.00

WMD107 9.07 20.47 11.40 0.41 0.00 0.0 0.00 90 -46

WMD108 66.25 72.60 6.35 1.26 0.58 8.4 0.77 90 -48

1 True thicknesses are interpreted as 60-90% of stated intervals.

2 No topcut has been used on analyses

3 Intervals use a 0.3 gram per tonne gold cutoff value

Adyabo I.P. Survey Results

An initial eight ( 8) line I nduced Polarization (I. P.)/Resistivity and Magnetic survey was planned for the

Mato Bula deposit area , however favourable drill results to depth at the southern e xtent of planned

drilling resulted in additional coverage.

A ten (10) line, 22.4 km I.P./Resistivity/Magnetic survey was conducted over the Mato Bula area from

May 8 through June 4, 2017, and was carried out by Scott Geophysics of Vancouver, Canada, with f ollow-

up section Inversion and 3D modelling carried out by Jules Lajoie of Comtech Enterprises (see compilation

map link).

The survey clearly identifies a n I.P. Chargeability high associated with the Mato Bula deposit mineralized

trend, and a correspond ing Resistivity low. On all but two central lines, th is Chargeability anomaly

remains open at depth. Of additional note, the anomaly remains open to the north and south, and is

observed to build strongly to depth southward, beyond both the current Mato Bul a resource, and the

most recent drill campaign intersections hosting distinctive Cu, Zn, Au, Ag mineralization to depth.

All maps, tables, and figures can be found here

Ethiopia Tenure Update

On August 11, 2016 , East Africa announced it had filed a mi ne permitting application for the Terakimti

Oxide Gold Project at the Harvest Project. East Africa management continues to engage in discussion and

negotiation meetings with representatives of the Ethiopian Ministry of Mines, Petroleum and Natural Gas

(MoMPNG) to finalize the Harvest Terakimti Oxide Mining Licence Agreement, and in addition , to

ensuring the retention of key prospects within the Harvest Exploration Licence area. Currently, the

MoMPNG is assessing, for purposes of adherence to Mining Regulati ons, that the prospects be included

in an expanded Harvest Terakimti Mining Licence area.

Quality Control

The planning, execution, and monitoring of East Africa ’s drilling and quality control programs at the

Harvest and Adyabo Projects has been condu cted under the supervision of Jeff Heidema, P.Geo., East

Africa’s Vice President Exploration. Mr. Heidema is a “Qualified Person” as defined by NI 43 -101, and has

reviewed and approved the geological information contained in this news release. Diamond dril ling was

coordinated by East Africa’s contract geologists who also managed the preparation, logging, and sampling

of core and rock samples, in addition to carrying out bulk density measurements. During sampling, quality

control standards and blanks were in troduced at pre -determined intervals to monitor laboratory

performance. A system of field, reject, and pulp sample duplicates was also incorporated, as were specific

programs of re -assaying and umpire lab assaying to both monitor laboratory performance and also

characterize potential mineralization; all consistent with industry best practice.

Drill core samples have undergone preliminary preparation at the Bureau Veritas Mineral Laboratories

facility in Ankara, Turkey, and are crushed to 80% passing 10 mes h, and pulverized to 85% passing 200

mesh (PRP70-1KG package). Analyses are conducted at both the Turkey facility and the Bureau Veritas

Mineral Laboratories in Vancouver, Canada, with diamond drill core analyses utilizing Aqua Regia

digestion and ICP -ES f or base metal and silver analyses (AQ370 package), and Infill sample program

utilizing Aqua Regia digestion and ICP -MS/ICP-ES (AQ270 package) for base metal and silver analyses.

Gold analyses are conducted at the Turkey Bureau Veritas Mineral Laboratories facility via Fire Assay

Fusion with AA finish, and gravimetric analyses are completed for over -limit samples (FA430, FA530 -Au

packages).

Information recorded from diamond drill core assaying was integrated using industry standard data

management software (Maxwell Datashed).

More information on the Company can be viewed at the Company’s website: www.eastafricametals.com

On behalf of the Board of Directors:

Andrew Lee Smith, P.Geo., CEO

For further information contact:

Nick Watters, Business Development

Telephone: +1 (604) 488-0822

Email: [email protected]

Website: www.eastafricametals.com

Cautionary Statement Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Generally, forward-

looking information can be identified by the use of forward-looking terminology such as "anticipate", "believe", "plan", "expect", "intend",

"estimate", "forecast", "project", "budget", "schedule", "may", "will", "could", "might", "should" or variations of such words or similar words or

expressions. Forward-looking information is based on reasonable assumptions that have been made by the Company as at the date of such

information and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity,

performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information,

including but not limited to: early exploration; the closing of the agreement with the exploration and development company to advance the

Magambazi Project or identify any other corporate opportunities for the Company; mineral exploration and development; metal and mineral prices;

availability of capital; accuracy of the Company's projections and estimates, including the initial mineral resource for the Adyabo, Harvest and

Magambazi Projects; mining licence/permit applications, estimated exploration licence extensions, interest and exchange rates; competition; stock

price fluctuations; availability of drilling equipment and access; actual results of current exploration activities; government regulation; political or

economic developments; foreign taxation risks; environmental risks; insurance risks; capital expenditures; operating or technical difficulties in

connection with development activities; personnel relations; the speculative nature of strategic metal exploration and development including the

risks of diminishing quantities of grades of reserves; contests over title to properties and/or projects; and changes in project parameters as plans

continue to be refined, as well as those risk factors set out in the Company’s management’s discussion and analysis for the year ended December 31,

2016, management’s discussion and analysis for the three months ended March 31, 2017, and the Company’s listing application dated July 8, 2013.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to the price of gold, silver,

copper and zinc; the demand for gold, silver, copper and zinc; the ability to carry on exploration and development activities; the timely receipt of any

required approvals; the ability to obtain qualified personnel, equipment and services in a timely and cost-efficient manner; the ability to operate in a

safe, efficient and effective manner; and the regulatory framework regarding environmental matters, the renewal or extension of exploration

licences, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could

cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be

as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events

could differ materially from those anticipated in such information. The Company does not update or revise forward looking information even if new

information becomes available unless legislation requires the Company do so. Accordingly, readers should not place undue reliance on forward-

looking information contained herein, except in accordance with applicable securities laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.