East Africa Metals Intersects 21.19 metres grading 4.32% copper, 1.04 grams per tonne gold, 35.9 grams per tonne silver, and 6.98% zinc at the Mayshehagne VMS prospect, continues both resource and exploration diamond drilling
Suite 700 – 1055 W. Georgia Street
PO Box 11108, Vancouver, BC, Canada V6E 3P3
Tel: 604.488.0822
Toll Free: 866.488.0822
Fax: 604.899.1240
Web: www.eastafricametals.com
NEWS RELEASE
East Africa Metals Intersects 21.19 metres grading 4.32% copper, 1.04 grams per tonne gold,
35.9 grams per tonne silver, and 6.98% zinc at the Mayshehagne VMS prospect, continues both
resource and exploration diamond drilling
Vancouver, British Columbia – March 27, 2017 – East Africa Metals Inc. (TSX-V: EAM or the “Company”) is
pleased to announce results from a multi targeted drill program at the Harvest and Adyabo Projects in the
Arabian Nubian Shield of Ethiopia. The Company has conducted additional drill testing of the Harvest
Project Mayshehagne and VTEM09 VMS prospects to potentially upgrade targets, confirm interpretation of
mineralization, and assess targets for inclusio n as potential satellite resource zones . Both prospects are
located near the EAM’s Terakimti resource deposit. Drill intercepts continue to reflect very strong metal
grades seen in previous drilling, and identifies the need for further delineation work on the VMS prospects.
Additionally, infill drilling has continued at the Adyabo Project Mato Bula and Da Tambuk resource
deposits, with a 5,000 metre diamond infill drilling program in progress at Mato Bula. Results of Mato Bula
Silica Hill infill drilling are also included in this release.
Highlight intersections include:
At Silica Hill - 31.55 metres grading 9.40 grams per tonne gold, and 0.10 % copper, from 111.32
metres drill depth, and;
At VTEM09 - 24.06 metres grading 1.88 % copper, 3.08 grams per tonne gold, 66.4 grams per
tonne silver, and 2.54 % zinc, from 35.84 metres drill depth, and;
At Mayshehagne - 21.19 metres grading 4.32 % copper, 1.04 grams per tonne gold, 35.9 grams
per tonne silver, and 6.98 % zinc, from 36.58 metres drill depth.
Harvest VMS Prospect diamond drilling
A total of 9 diamond drillholes have been com pleted at the Mayshehagne and VTEM09 VMS prospects.
Results confirm the high base and precious metal grades encountered in previous drilling, and provide
encouragement in assessing the prospects for further exploration, in parallel with Terakimti advanceme nt.
As a VMS prospect, Mayshehagne intercepts exhibit notably high grade base metal values, whereas
intercepts at VTEM09 exhibit notably high grade precious metal values.
Mayshehagne and VTEM09 diamond drill intercepts
Hole ID From
(m)
To
(m)
Interval
(m)1
Copper
%
Gold
g/t2
Silver
g/t
Zinc
%
Local
Azimuth Dip Prospect
HD011
36.58 57.77 21.19 4.32 1.04 35.9 6.98
90 -55
Mayshehagne
including 36.58 46.60 10.02 7.74 1.89 59.4 8.39
including 52.60 56.00 3.40 2.84 0.62 40.0 14.24
HD012 58.84 71.07 12.23 5.15 1.07 35.9 3.09 90 -53 Mayshehagne
Hole ID From
(m)
To
(m)
Interval
(m)1
Copper
%
Gold
g/t2
Silver
g/t
Zinc
%
Local
Azimuth Dip Prospect
HD013 80.50 93.26 12.76 0.40 0.13 1.30 0.25 90 -54 Mayshehagne
HD014
26.15 36.95 10.80 5.86 1.22 42.1 5.82
80 -65 Mayshehagne
including 26.15 32.10 5.95 8.18 1.74 62.8 8.18
TVD006 39.00 49.65 10.65 3.09 5.23 68.6 4.25 263 -49 VTEM09
TVD007 65.53 72.25 6.72 0.84 1.32 57.3 3.62 263 -66 VTEM09
TVD008 No Significant Results 90 -65 VTEM09
TVD009
35.84 59.90 24.06 1.88 3.08 66.4 2.54
270 -50 VTEM09
including 46.23 57.90 11.67 2.93 5.15 105.8 4.89
TVD010 No Significant Results 270 -50 VTEM09
1 True thicknesses are interpreted as 50-90% of stated intervals.
2 No topcut has been used on analyses
Mato Bula Deposit diamond drilling
Work continues on upgrading the resource at the Mato Bula deposit, initially with a short infill drill program
in the Silica Hill area, and a larger 5 ,000 metre infill program in the southern portion of the deposit. Large
diameter core drilling was conducted on the central area of Silica Hill.
Results have been received for the initial Silica Hill drilling, and the larger 5,000 metre program is on-going
with drilling completion estimated for the end of April 2017 , and results expected prior to the end of Q2
2017.
Mato Bula diamond drill intercepts
Hole ID
From
(m)
To
(m)
Interval
(m)1 Gold g/t2,3 Copper %
Local
Azimuth Dip Prospect
WMD061
105.84 126.26 20.42 8.52 0.34
84 -55 Mato Bula including 106.84 123.45 16.61 10.36 0.35
including 106.84 116.84 10.00 15.02 0.37
WMD062
101.70 119.13 17.43 1.46 0.11
84 -45 Mato Bula including 108.20 117.50 9.30 2.22 0.16
125.26 130.26 5.00 1.78 0.04
WMD063
92.85 118.55 25.70 5.06 0.19
84 -47 Mato Bula including 92.85 105.47 12.62 9.21 0.32
including 99.47 105.47 6.00 14.84 0.44
WMD064
111.32 142.87 31.55 9.40 0.10
84 -50 Mato Bula
including 119.10 125.10 6.00 44.33 0.23
1 True thicknesses are interpreted as 60-90% of stated intervals.
2 No topcut has been used on analyses
3 Intervals use a 0.3 gram per tonne gold cutoff value
Continuing Exploration
The first phase of an IP program targeted at the Mato Bula area has started mobilization. Results from this
work are expecte d to help geophysically define the present deposit mineralized signature, identify
additional drill targets, and provide guidance for EAM in the potential for rolling out a larger scale IP
program over the entire multi-kilometre Mato Bula trend.
Additionally, as part of this phase of exploration, once exploration licence extensions are granted, EAM will
conduct diamond drilling on other existing priority targets.
Quality Control
The planning, execution, and monitoring of EAM’s drilling and quality contr ol programs at the Harvest
and Adyabo Projects has been conducted under the supervision of Jeff Heidema, P.Geo., EAM’s Vice
President Exploration. Mr. Heidema is a “Qualified Person” as defined by NI 43 -101, and has reviewed
and approved the geological inf ormation contained in this news release. Diamond drilling was
coordinated by EAM’s contract geologists who also managed the preparation, logging, and sampling of
core and rock samples, in addition to carrying out bulk density measurements. During sampling, quality
control standards and blanks were introduced at pre -determined intervals to monitor laboratory
performance. A system of field, reject, and pulp sample duplicates was also incorporated, as were specific
programs of re -assaying and umpire lab assayi ng to both monitor laboratory performance and also
characterize potential mineralization; all consistent with industry best practice.
Drill core samples have undergone preliminary preparation at the Bureau Veritas Mineral Laboratories
facility in Ankara, Turkey, and are crushed to 80% passing 10 mesh, and pulverized to 85% passing 200
mesh ( PRP70-1KG package). Analyses are conducted at Bureau Veritas Mineral Laboratories in
Vancouver, Canada, with diamond drill core analyses utilizing Aqua Regia digestion and ICP-ES for base
metal and silver analyses (AQ370 package), and Infill sample program utilizing Aqua Regia digestion and
ICP-MS/ICP-ES (AQ270 package) for base metal and silver analyses. Gold analyses are conducted via Fire
Assay Fusion with AA finish, and gravimetric analyses are completed for over -limit samples (FA430,
FA530-Au packages).
Information recorded from diamond drill core assaying was integrated using industry standard data
management software (Maxwell Datashed).
More information on the Company can be viewed at the Company’s website: www.eastafricametals.com
On behalf of the Board of Directors:
Andrew Lee Smith, P.Geo., CEO
For further information contact:
Nick Watters, Business Development
Telephone: +1 (604) 488-0822
Email: [email protected]
Website: www.eastafricametals.com
Cautionary Statement Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Generally, forward-
looking information can be identified by the use of forward-looking terminology such as "anticipate", "believe", "plan", "expect", "intend",
"estimate", "forecast", "project", "budget", "schedule", "may", "will", "could", "might", "should" or variations of such words or similar words or
expressions. Forward-looking information is based on reasonable assumptions that have been made by the Company as at the date of such
information and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity,
performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information,
including but not limited to: early exploration; the closing of the agreement with the exploration and development company to advance the
Magambazi Project or identify any other corporate opportunities for the Company; mineral exploration and development; metal and mineral prices;
availability of capital; accuracy of the Company's projections and estimates, including the initial mineral resource for the Adyabo, Harvest and
Magambazi Projects; mining licence/permit applications, estimated exploration licence extensions, interest and exchange rates; competition; stock
price fluctuations; availability of drilling equipment and access; actual results of current exploration activities; government regulation; political or
economic developments; foreign taxation risks; environmental risks; insurance risks; capital expenditures; operating or technical difficulties in
connection with development activities; personnel relations; the speculative nature of strategic metal exploration and development including the
risks of diminishing quantities of grades of reserves; contests over title to properties and/or projects; and changes in project parameters as plans
continue to be refined, as well as those risk factors set out in the Company’s management’s discussion and analysis for the year end December 31,
2015, management’s discussion and analysis for the three and nine months ended September 30, 2016 and the Company’s listing application dated
July 8, 2013. Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to the
successful integration of Tigray Resources Inc.’s business with the Company; the price of gold, silver, copper and zinc; the demand for gold, silver,
copper and zinc; the ability to carry on exploration and development activities; the timely receipt of any required approvals; the ability to obtain
qualified personnel, equipment and services in a timely and cost-efficient manner; the ability to operate in a safe, efficient and effective manner; and
the regulatory framework regarding environmental matters, the renewal or extension of exploration licences, and such other assumptions and
factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially
from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended.
There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those
anticipated in such information. The Company does not update or revise forward looking information even if new information becomes available
unless legislation requires the Company do so. Accordingly, readers should not place undue reliance on forward-looking information contained
herein, except in accordance with applicable securities laws.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release.