Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DPM.TO ·

DPM Metals Announces Filing of Technical Report for the Čoka Rakita Gold Project

Resource Estimates Technical Reports (NI 43-101)

p.1 DPM Metals Announces Filing of Technical Report for the Čoka Rakita Gold Project

News Release

DPM Metals Announces Filing of Technical Report for the Čoka Rakita Gold Project

Toronto, Ontario, January 12, 2026 – DPM Metals Inc. (TSX: DPM, ASX: DPM) (ARBN: 689370894) (“DPM” or “the

Company”) announces that the Company has filed a technical report for its Čoka Rakita gold project in

Serbia (the “Report”). The purpose of the Report is to support the Mineral Resource and Mineral Reserve

estimate and feasibility study (“FS”) for Čoka Rakita, as previously disclosed in the Company’s news

release dated November 26, 2025.

The Report has been prepared pursuant to the Canadian Securities Administrator’s National Instrument

43-101 – Standards of Disclosure for Mineral Projects. The Report and the November 26 , 202 5 news

release are both available for review on SEDAR+ ( www.sedarplus.ca) and on the Company’s website

(www.dpmmetals.com). Readers are encouraged to refer to the risks, assumptions and key parameters

identified in the Report with respect to, among other things, the Mineral Resources, Mineral Reserves and

other estimates presented in relation to the FS for additional information.

About DPM Metals Inc.

DPM Metals Inc. is a Canadian -based international gold mining company with operations and projects

located in Bulgaria, Bosnia and Herzegovina, Serbia and Ecuador. Our strategic objective is to become a

mid-tier precious metals company, which is based on sustainable, responsible and efficient gold production

from our portfolio, the development of quality assets, and maintaining a strong financial position to support

growth in mineral reserves and production through disciplined strategic transactions. This s trategy creates

a platform for robust growth to deliver above -average returns for our shareholders. DPM trades on the

Toronto Stock Exchange (symbol: DPM) and the Australian Securities Exchange as a Foreign Exempt

Listing (symbol: DPM).

For further information please contact:

Jennifer Cameron

Director, Investor Relations

Tel: (416) 219-6177

[email protected]

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward looking statements” or “forward looking information” (collectively,

“Forward Looking Statements”) that involve a number of risks and uncertainties. Forward Looking

Statements are statements that are not historical facts and are generally, but not always, identified by the

use of forward looking terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”,

“estimates”, “forecasts”, “outlook”, “intends”, “anticipates”, “believes”, or variations of such words and

phrases or that state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken,

p.2 DPM Metals Announces Filing of Technical Report for the Čoka Rakita Gold Project

occur or be achieved, or the negative of any of these terms or similar expressions. The Forward Looking

Statements in this news release relate to, among other things, the Company’s strategic objectives. Forward

Looking Statements are based on certain key assumptions and the opinions and estimates of management,

as of the date such statements are made, and they involve known and unknown risks, uncertainties and

other factors which may cause the actual re sults, performance or achievements of DPM to be materia lly

different from any other future results, performance or achievements expressed or implied by the Forward

Looking Statements. Such factors include, among others, those risk factors discussed or referred to in the

documents (including without limitation DPM’s most recent Annual Information Form) filed from time to time

with the securities regulatory authorities in all provinces and territories of Canada and available on SEDAR+

at www.sedarplus.ca. The reader has been cautioned that the foregoing list is n ot exhaustive of all factors

which may have been used. Although DPM has attempted to identify important factors that could cause

actual actions, events or results to differ materially from those described in Forward Looking Statements,

there may be other factors that cause actions, events or results not to be anticipated, estimated or intended.

There can be no assurance that Forward Looking Statements will prove to be accurate, as actual results

and future events could differ materially from those anticipated in such statements. DPM’s Forward Looking

Statements reflect current expectations regarding future events and speak only as of the date hereof.

Unless required by securities laws, DPM undertakes no obligation to update Forward Looking Statements

if circ umstances or management’s estimates or opinions should change. Accordingly, readers are

cautioned not to place undue reliance on Forward Looking Statements.

Cautionary Note Regarding Mineral Exploration Results

DPM is not required to report on minerals exploration results, mineral resources and ore reserves in

accordance with Chapter 5 of the ASX Listing Rules or the JORC Code 2012 due to DPM’s Foreign Exempt

Listing on the ASX. DPM’s mineral reserves and mineral resources are prepared in accordance with NI 43-

101 and the Canadian Institute of Mining, Metallurgy and Petroleum—Definition Standards adopted by the

CIM Council on 10 May 2014, as required by Canadian securities regulatory authorities, which may differ

from the requirements of the ASX Listing Rules and the JORC Code 2012.