Toronto, October 9, 2020 – Dundee Precious Metals Inc. (TSX: DPM) (“DPM” or “the Company”)

announced preliminary production results from both of its mines in Bulgaria and the Tsumeb smelter for the

three and nine months ended September 30, 2020. As a result of strong operational performance year-to-

date, DPM remains on track to meet its previously issued guidance for 2020 at each of its operations and

is tracking to the higher end of its 2020 guidance for gold production.

“Our operations continue to perform extremely well and delivered another strong quarter of production in

the third quarter,” said David Rae, President and CEO. “Our impressive performance year-to-date reflects

outstanding efforts at all of our sites to proactively manage the challenges of the COVID -19 pandemic.”

Preliminary Production Results

Preliminary results for the third quarter and first nine months of 2020 are provided in the table below:

Ore

processed

Metals contained in

concentrate produced

Payable metals in

concentrate sold

Complex

concentrate smelted

(Kt)

Gold

(K oz)

Copper

(Mlbs)

Gold

(K oz)

Copper

(Mlbs)

(Kt)

Q3 2020

Chelopech 558.4 49.8 9.2 37.9 7.6 -

Ada Tepe 219.3 30.0 - 31.3 - -

Tsumeb - - - - - 55.9

Consolidated 777.7 79.8 9.2 69.2 7.6 55.9

YTD 2020

Chelopech 1,660.2 141.5 28.0 113.4 25.6 -

Ada Tepe 677.3 92.6 - 94.9 - -

Tsumeb - - - - - 179.4

Consolidated 2,337.5 234.1 28.0 208.3 25.6 179.4

2020 full-year

guidance(1) 2,855 – 3,092 257 – 299 35 – 40 229 – 267 33 – 38 230 – 265

(1) As disclosed in Management’s Discussion and Analysis (“MD&A”) for the period ended December 31, 2019, issued on February

13, 2020 and available at www.sedar.com and at www.dundeeprecious.com

2

Operating Highlights

Ada Tepe continues to deliver impressive performance, producing 30,000 gold ounces in the third quarter.

Production was higher than planned as a result of higher gold grade and higher volumes of ore treat ed.

Chelopech continued its consistent track record in the third quarter, producing approximately 49,800 ounces

of gold and 9.2 million pounds of copper. Gold production was as expected with higher recoveries to pyrite

concentrate and copper production was in-line with plan.

As a result of strong operational performance year -to-date at both operations, DPM is on track to achieve

the higher end of its 2020 guidance for gold production.

The Tsumeb smelter processed 55, 900 tonnes of c omplex concentrate smelted in the third quarter. This

reflects 15 days of scheduled maintenance during the quarter , which was primarily related to the

replacement of certain equipment in the offgas system . No additional significant maintenance is planned

prior to the Ausmelt furnace reline , which is currently scheduled to occur in the first quarter of 2021.

Complex concentrate smelted for the year is expected to be in-line with previously issued 2020 guidance.

To date, DPM has not experienced any material disruptions to its operations as a result of the COVID -19

pandemic. The Company continues to effectively manage the COVID-19 pandemic, prioritizing the health

and safety of its workforce and host communities and ensuring security of its inbound and outbound supply

chains.

Dividend

As previously announced in July 2020, DPM will pay a quarterly dividend of US$0.02 per share on October

15, 2020 to shareholders of record as at 5:00 p.m. Toronto local time on September 30, 2020.

Third Quarter 2020 Operating and Financial Results

The Company plans to release its third quarter 2020 operating and financial results after market close on

Thursday, November 12, 2020. The news release, MD&A and consolidated financial statements will be

posted on SEDAR at www.sedar.com and on the Company’s website at www.dundeeprecious.com.

On Friday, November 13, 2020 at 9:00 a.m. Toronto local time, DPM will host a conference call and audio

webcast to discuss the results, followed by a question-and-answer session. Participants are encouraged to

dial into the call 15 minutes before its scheduled start time or to join via the audio webcast to reduce hold

time in advance of the call.

The call-in numbers and webcast details are as follows:

Date and Time Friday, November 13, 2020

9:00 Toronto local time

Webcast link https://edge.media-server.com/mmc/p/3pmxch77

3

Telephone dial-in

Toll-free (Canada and US): 1-844-402-0878

International: +1-478-219-0512

Passcode: 8269926

Replay

(available for 7 days

following the call)

Toll-Free (Canada and US): 1-855-859-2056

International: +1-404-537-3406

Passcode 8269926

Technical Information

The technical and scientific information in this press release has been reviewed and approved by Ross

Overall, B.Sc. (Applied Geology), Corporate Mineral Resource Manager of DPM, who is a Qualified Person

as defined under National Instrument 43-101, and not independent of the Company.

About Dundee Precious Metals Inc.

Dundee Precious Metals Inc. is a Canadian based, international gold mining company engaged in the

acquisition of mineral properties, exploration, development, mining and processing of precious metals. The

Company's operating assets include the Chelopech operation, which produces a gold -copper concentrate

containing gold, copper and silver and a pyrite concentrate containing gold, located east of Sofia, Bulgaria;

the Ada Tepe operation, which produces a gold concentrate containing gold and silver, located in southern

Bulgaria; and the Tsumeb smelter, a complex copper concentrate processing facility located in Namibia.

DPM also holds interests in a number of developing gold and exploration properties located in Canada,

Serbia and Ecuador, including its 10.3% interest in Sabina Gold & Silver Corp. and its 19.4% interest in INV

Metals Inc.

For further information please contact:

David Rae

President and Chief Executive Officer

Tel: (416) 365-5092

[email protected]

Jennifer Cameron

Director, Investor Relations

Tel: (416) 219-6177

[email protected]

Cautionary Note Regarding Forward-Looking Statements

This press release contains “forward looking statements” or “forward looking information” (collectively,

“Forward Looking Statements”) that involve a number of risks and uncertainties. Forward Looking

Statements are statements that are not historical facts and are generally, but not always, identified by the

use of forward looking terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”,

“estimates”, “forecasts”, “outlook”, “intends”, “anticipates” , “believes”, or variations of such words and

phrases or that state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken,

occur or be achieved, or the negative of any of these terms or similar expressions. The Forward Looking

Statements in this press release relate to, among other things: measures the Company is undertaking in

response to the COVID -19 (coronavirus) outbreak, including its impacts across the Company ’s global

supply chains, the level of and duration of r eductions or curtailments in operating levels at any of the

4

Company’s operations or in its exploration and development activities, expected cash flows; the price of

gold, copper, silver and acid, and other commodities; toll rates, metals exposure and stock pile interest

deductions at Tsumeb; the estimation of Mineral Reserves and Mineral Resources and the realization of

such mineral estimates; estimated capital costs, operating costs, and other financial metrics, including

those set out in the outlook provi ded by the Company; currency fluctuations; the impact of impairment

charges; the processing of Chelopech concentrate; timing of further optimization work at Tsumeb; potential

benefits of any upgrades and/or expansion, including the planned rotary furnace installation, at the Tsumeb

smelter; results of economic studies; government regulation of mining and smelting operations; the payment

of dividends ; and the timing and number of common shares of the Company that may be purchased

pursuant to the Company’s no rmal course issuer bid. Forward Looking Statements are based on certain

key assumptions and the opinions and estimates of management, as of the date such statements are made,

and they involve known and unknown risks, uncertainties and other factors which m ay cause the actual

results, performance or achievements of the Company to be materially different from any other future

results, performance or achievements expressed or implied by the Forward Looking Statements. In addition

to factors already discussed in this press release, such factors include, among others, risks relating to the

Company’s business generally and the impact of COVID -19, including, changes to the Company’s supply

chain; product shortages; delivery and shipping issues; closures and/or fail ure of plant, equipment or

processes to operate as anticipated; employees and contractors becoming infected with COVID -19; lost

work hours; labour force shortages; fluctuations in metal and acid prices, toll rates and foreign exchange

rates; possible varia tions in ore grade and recovery rates; conclusions of economic evaluations and

economic studies; changes in project parameters , including schedule and budget, as plans continue to be

refined; uncertainties with respect to actual results of current explorat ion activities; uncertainties and risks

inherent to developing and commissioning new mines into production, which may be subject to unforeseen

delays; uncertainties inherent with conducting business in foreign jurisdictions where corruption, civil unrest,

political instability and uncertainties with the rule of law may impact the Company’s activities; limitation on

insurance coverage; accidents, labour disputes and other risks of the mining industry; delays in obtaining

governmental approvals or financing o r in the completion of development or construction activities; actual

results of current and planned reclamation activities; opposition by social and non -government

organizations to mining projects and smelting operations; unanticipated title disputes; cla ims or litigation;

cyber attacks and other cybersecurity risks ; there being no assurance that the Company will purchase

additional common shares of the Company under the normal course issuer bid; risks related to the

implementation, cost and realization of benefits from digital initiatives; failure to realize projected financial

results from MineRP Holdings Inc.; risks related to operating a technology business reliant on the

ownership, protection and ongoing development of key intellectual properties; as w ell as those risk factors

discussed or referred to in any other documents (including without limitation the Company’s most recent

Annual Information Form) filed from time to time with the securities regulatory authorities in all provinces

and territories of Canada and available on SEDAR at www.sedar.com. The reader has been cautioned that

the foregoing list is not exhaustive of all factors which may have been used. Although the Company has

attempted to identify important factors that could cause actual actions, events or results to differ materially

from those described in Forward Looking Statements, there may be other factors that cause actions, events

or results not to be anticipated, estimated or intended. There can be no assurance that Forward Looking

Statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. The Company’s Forward Looking Statements reflect current expectations

regarding future events and speak only as of the date hereof. Unless required by securities laws, the

Company undertakes no obligation to update Forward Looking Statements if circumstances or

management’s estimates or opinions should change. Accordingly, readers are cautioned not to place undue

reliance on Forward Looking Statements.