Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DPM.TO ·

Dundee Precious Metals Files Technical Report on the Čoka Rakita Gold Project

Technical Reports (NI 43-101)

Dundee Precious Metals Files Technical Report on the Čoka Rakita Gold Project

Toronto, Ontario, June 11, 2024 – Dundee Precious Metals Inc. (TSX: DPM) (“DPM” or “the Company”)

today announced that the Company has filed a technical report for its Čoka Rakita gold project in Serbia

(the “Report”). The purpose of the report was to support the preliminary economic assessment for Čoka

Rakita, as previously disclosed in the Company’s news release dated May 1, 2024.

The Report has been prepared pursuant to the Canadian Securities Administrator’s National Instrument

43-101 – Standards of Disclosure for Mineral Projects. The Report and the May 1, 2024, news release are

both available for review on SEDAR + (www.sedarplus.ca) and on the Company’s website

(www.dundeeprecious.com).

About Dundee Precious Metals

Dundee Precious Metals Inc. is a Canadian-based international gold mining company with operations and

projects located in Bulgaria, Namibia, Serbia and Ecuador. The Company’s purpose is to unlock resources

and generate value to thrive and grow together. This overall purpose is supported by a foundation of core

values, which guides how the Company conducts its business and informs a set of complementary strategic

pillars and objectives related to ESG, innovation, optimizing our existing portfolio, and growth. The

Company’s resources are allocated in-line with its strategy to ensure that DPM delivers value for all of its

stakeholders. DPM’s shares are traded on the Toronto Stock Exchange (symbol: DPM).

For further information please contact:

Jennifer Cameron

Director, Investor Relations

Tel: (416) 219-6177

[email protected]

Cautionary Note Regarding Forward-Looking Statements

The Report and associated disclosure of the Company contains “forward looking statements” or “forward

looking information” (collectively, “Forward Looking Statements”) that involve a number of risks and

uncertainties. Forward Looking Statements are statements that are not historical facts and are generally,

but not always, identified by the use of forward looking terminology such as “plans”, “targets”, “expects”, “is

expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “outlook”, “intends”, “anticipates”, “believes”, or

variations of such words and phrases or that state that certain actions, events or results “may”, “could”,

“would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms or similar

expressions. The Forward Looking Statements in the Report and associated disclosure relate to, among

other things: the estimation of mineral resources and the realization of such mineral estimates; the price of

gold; the amount of mineralised material and material grade; proposed mine production plan; mining dilution

and mining recovery; recovery rates of gold in the processing plant; ability of plant, equipment, processes

to operate as anticipated; sustaining and operating costs; environmental, social, and licenc ing risks;

2

taxation policy and tax rate; cost inflation; geotechnical or hydrogeological considerations during mining;

ability to maintain social licen ce to operate; unrecognised environmental risks; closure costs; project

economics, financial and operational parameters such as expected throughput, production, processing

methods, cash costs, all -in sustaining costs, other costs, capital expenditures, free cash flow, NPV, IRR,

payback period and life of mine; planned geotechnical, hydrogeological drilling and metallurgical test work,

and related costs; expected next steps in the development of the project; production schedule; expected

life of mine at Čoka Rakita; permitting activities; and availability and applicability of tax relief as provided in

existing legislation; potential gold recoveries . Forward Looking Statements are based on certain key

assumptions and the opinions and estimates of management and the QPs, as of the date such statements

are made, and they involve known and unknown risks, uncertainties and other factors which may cause the

actual results, performance or achievements of DPM to be materially different from any other future results,

performance or achievements expressed or implied by the Forward Looking Statements. In addition to

factors already discussed in the Report, such factors include, among others, risks relating to DPM’s

business, including possible variations in grade and recovery rates; changes in project parameters,

including schedule and budget, as plans continue to be refined; uncertainties with respect to actual results

of current exploration activities; uncertainties inherent to the estimation of mineral resources, which may

not be fully realized; uncertainties inherent with conducting business in foreign jurisdictions where

corruption, civil unrest, political instability and uncertainties with the rule of law may impact DPM’s activities;

the impact of the conflict in the Ukraine and health emergencies, including resulting changes to DPM’s

supply chain and costs of supplies; product shortages; delivery and shipping issues; closures and/or failure

of equipment or processes to operate as anticipated; employees and contractors become infected with

pathogens or being affected by the war; lost work hours; labour force shortages; fluctuations in metal prices,

toll rates and foreign exchange rates; limitation on insurance coverage; accidents, labour disputes and other

risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion

of exploration activi ties; opposition by social and non -government organizations to mining projects;

unanticipated title disputes; claims or litigation; cyber attacks and other cybersecurity risks; as well as those

risk factors discussed or referred to in any other documents (including without limitation DPM’s most recent

annual information form) filed from time to time with the securities regulatory authorities in all provinces and

territories of Canada and available on SEDAR+ at www.sedarplus.ca. The reader has been cautioned that

the foregoing list is not exhaustive of all factors which may have been used. Although the Report, this news

release and other disclosure identify important factors that could cause actual actions, events or results to

differ materially from those described in Forward Looking Statements, there may be other factors that cause

actions, events or results not to be anticipated, estimated or intended. There can be no assurance that

Forward Looking Statements wi ll prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. The Forward Looking Statements reflect current

expectations regarding future events and speak only as of the date hereof. Unless required by securities

laws, DPM undertakes no obligation to update Forward Looking Statements if circumstances or estimates

or opinions should change. Accordingly, readers are cautioned not to place undue reliance on Forward

Looking Statements.