Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DOS.V ·

Dios Au33 project: CLN gold showing yielded up to 12.55 g/t Au

Drill Results

DIOS EXPLORATION

TSX-V: DOS October 18, 2017

Dios Au33 project: CLN gold showing yielded up to 12.55 g/t Au

Montréal (Québec) Canada- DIOS EXPLORATION reports the CLN (Chain Lake

North) gold showing returned gold assays in grams/ton up to 12.55; 6.64; 4.66; 4.45;

2.01; 1.98 g/t Au along a 75 meter strike in the lower part of a cliff along the eastwest

mineralized altered structure (eight samples out of nine taken assaying over 0.5 g/t Au).

Mineralization is typically a 5 to 15 m wide foliat ed altered zone (alternating cm biotite-

rich/quartz-pyrite-magnetite with potassic feldspar bands) in tonalites. Pyrite contents of

foliated zone vary from 1 to 10%, averaging 2-5% with some local magnetite (nil-2%).

Previous CLN sampling on the upper south part of th is 10 m high cliff yielded values of

2.23; 2.56; 5.15 and 12.65 g/t Au. The CLN zone i s quite similar to the Heberto gold

zone about 2 km south (4.8 g/t gold over 8.65 m and 3.7 g/t gold over 13 m true widths) ,

but striking differently with a steeper attitude. T he CLN zone is bordered to the north by

hematized magnetic tonalite along a regional eastwe st (Chain Lake) structure. The low

magnetic Chain Lake structure is characterized by s trong gold in soil anomalies (B

horizon): 13 to 300 ppb gold including several valu es of 40 to 59 and 93, 102, 176, 300

ppb gold.

Samples were collected and assayed at ALS Val d’Or under supervision of Harold

Desbiens, M.Sc. Geo 43-101 QP. DIOS Au33 property is located in James Bay, Quebec,

55 km south of large Eleonore gold deposit and 15 km west of Clearwater gold deposit.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For more information, please contact:

Marie-Jose Girard, 43-101 QP

President & CEO

[email protected]

Tel. : (514) 923-9123